Where to find i-Construction 2.0 materials? 5 places to check
By LRTK Team (Lefixea Inc.)
Even though it appears that materials on i-Construction 2.0 are consolidated in one place, in reality the information is split across press releases, main documents, meeting materials, the comprehensive page, and related committee pages, so it’s easy to get confused about where to start. In particular, for practitioners the pages you should look at differ depending on whether you only want an overview, want to grasp the background of the system, want to follow this fiscal year’s developments, or want hints for on-site implementation. i-Construction 2.0 is an initiative compiled and published by the Ministry of Land, Infrastructure, Transport and Tourism on April 16, 2024, aimed at automating construction sites, and it aims to reduce personnel requirements at construction sites by at least 30% and increase productivity by 1.5 times by fiscal 2040. First, understanding how the materials are organized and using different sources depending on your purpose is the quickest way to reach the information you need.
Table of Contents
• The overall picture to grasp first when reviewing i-Construction 2.0 materials
• Reference 1: Press release page of the Ministry of Land, Infrastructure, Transport and Tourism at the time of formulation
• Reference 2: Materials page of the Ministry of Land, Infrastructure, Transport and Tourism's DX Promotion Headquarters for the infrastructure sector
• Reference 3: i-Construction comprehensive page
• Reference 4: Planning Committee page of the i-Construction and Infrastructure DX Promotion Consortium
• Reference 5: press release pages that publish planned initiatives and progress for each fiscal year
• How to search for materials without getting lost
• Checklist for operational staff when reviewing documents
• Summary
The overall picture to grasp first when reviewing i-Construction 2.0 materials
Before searching for materials on i-Construction 2.0, you need to clarify what you are actually going to look for. i-Construction 2.0 advances the conventional i-Construction and is framed as an approach that raises the focus from the previous “use of ICT, etc.” to “automation.” The main document indicates that the foundation for leveraging data and digital technologies has been put in place, citing background factors such as the need to sustain the development and maintenance of social infrastructure amid population decline and the fact that, from fiscal year 2023, efforts to implement BIM/CIM have been made a principle for directly managed civil engineering work and construction. On top of that, the goal is not mere digitization but to create construction sites where, even with fewer personnel, work can be carried out safely and in comfortable conditions based on three pillars: automation of construction, automation of data linkage, and automation of construction management. As a starting point for reviewing the materials, grasping these “background,” “goals,” and “three pillars” in advance will make the meaning of each page you read afterward much easier to understand.
Also, the materials for i-Construction 2.0 are not contained in a single PDF. The press release page from the time of formulation serves as an entry point to the policy, and the DX Promotion Headquarters' distribution materials page is convenient for reviewing both the summary materials and the full documents together. Furthermore, the comprehensive page makes it easy to find links to related materials, and by looking at the consortium and planning committee pages you can track subsequent discussions and progress. In other words, what is needed in practice is not "finding a single most detailed document" but "switching where you look depending on your purpose." If you first grasp the overall picture and then select which sources to consult according to the depth required, your research will proceed efficiently without wasted effort.
Reference 1 Ministry of Land, Infrastructure, Transport and Tourism's press release page at the time of formulation
The first place to check is the Ministry of Land, Infrastructure, Transport and Tourism’s press release page announcing the formal adoption of i-Construction 2.0. This page is the clearest primary entry point for confirming the existence of the policy, and allows you to quickly understand when and for what purpose it was compiled. As of its publication on April 16, 2024, the Ministry explained that it compiled i-Construction 2.0 as a new initiative to improve productivity at construction sites, aiming to accelerate i-Construction efforts and implement measures to reduce labor requirements at construction sites. For practitioners who first want to know “Is this really an official national policy?”, “What is it aiming for?”, and “How is it defined?”, this is the page that will answer those questions most quickly. Ministry of Land, Infrastructure, Transport and Tourism
What makes this page excellent is not only that the overview is concise, but also that it clearly indicates the pathway to the full materials. i-Construction 2.0 indicates that it aims, by fiscal 2040, to reduce on-site labor at construction sites by at least 30% and to increase productivity by 1.5 times, and that it will pursue automation of construction sites through three pillars: construction operations, data integration, and construction management. Those who only want the overview can grasp the direction from this page alone, and those who want more detail can proceed to the main text from here. As a place to get the first points for judgment immediately after arriving via search, the press release page issued at the time of formulation is very useful.
However, this page alone does not provide a sufficient understanding for practical work. The press release page is merely the "entry point" to the system, and it does not go into depth about what will change in the field, how it will be rolled out across different sectors, or what discussions will take place going forward. Therefore, while this page should be the first place to check, it is appropriate to use it on the premise of proceeding to the distribution materials page and the comprehensive page introduced next, rather than treating it as the final source. First grasp the fact of the formulation and the broad outline here, and then move on to the detailed materials — this approach is less likely to fail.
Reference 2: Distribution materials page of the Ministry of Land, Infrastructure, Transport and Tourism’s Headquarters for Promoting DX in the Infrastructure Field
The second thing to check is the materials page for the Ministry of Land, Infrastructure, Transport and Tourism’s DX Promotion Headquarters in the infrastructure sector. This is one of the most practically valuable references for understanding i-Construction 2.0. The page contains not only the agenda but also overview materials, the main documents, and the way forward, allowing you to follow the whole framework—from the overall picture to the details and then an image of subsequent progress—in one place. Because the materials are arranged in a recommended reading order amid policy documents that tend to be scattered, the structure makes it easy for a staff member seeing it for the first time to navigate.
From a practical standpoint, the value of this page lies in being able to compare the "Overview" and the "Main Text". The overview material is suited to grasping the framework quickly, while the main text material is suited to carefully following the background, purpose, goal setting, the three pillars, and the thinking behind the roadmap. Because the materials are organized as handouts for meetings, they make the intent behind the system design easier to discern than press release pages, and they are also useful when preparing internal briefings or reports for superiors. In particular, when you want to grasp terms and ideas that tend to be understood only in a fragmented way through searches as a single coherent logic, this handout page is extremely effective.
Furthermore, because this page also provides materials on "how to proceed going forward," you can check not only the system statically but also how they intend to advance it. What matters to practitioners is not only knowing the definition of the policy. By understanding which areas will be prioritized in the future and which themes are becoming the next topics of discussion, it becomes easier to determine the priority of responses for your company or your department. In that sense, this handouts page can be considered the most practice-oriented reference closest to the original source of i-Construction 2.0. It is such an important page that it is perfectly acceptable to open it first when in doubt.
Reference 3 i-Construction Comprehensive Page
The third place to check is the Ministry of Land, Infrastructure, Transport and Tourism’s i-Construction comprehensive page. This site is better used as a hub for broadly following related information rather than merely a place to view the text of i-Construction 2.0 itself. The comprehensive page not only provides a link to the i-Construction 2.0 formulation information from April 16, 2024, but also lists entry points useful when you want to check surrounding practical information, such as information on planning committee meetings, awards, related resources, case studies, and forms. For those who find it difficult to translate the policy text alone into practical implementation, this comprehensive page is a place to find the next step.
Particularly notable is that the comprehensive page lists links to the ICT Civil Engineering Case Studies, the collection of contractor submission forms, and related information. Among those who search for the term i-Construction 2.0, many are more interested in what practical examples exist on site and what they can use as references than in the policy itself. In such cases, press release pages and the PDFs of the main text alone do not provide enough information. Starting from the comprehensive page allows one to naturally access peripheral materials that are closer to practical implementation as well as the policy background. This has a major advantage in that it makes it easier to understand the overall arrangement of materials than simply picking up isolated PDFs from search results. Ministry of Land, Infrastructure, Transport and Tourism
Also, the i-Construction comprehensive page is convenient for tracking update history. In addition to the i-Construction 2.0 formulation information dated April 16, 2024, and the planning committee meeting information dated November 20, 2025, related updates are listed in chronological order, so it is also useful for quickly checking whether there have been any recent developments. If practitioners need to check the status regularly, it is more efficient to start from this comprehensive page to confirm the latest developments than to perform a new search each time. Because it allows you to do three tasks at once—checking the policy text, accessing related materials, and confirming updates—the comprehensive page is a highly practical reference. Ministry of Land, Infrastructure, Transport and Tourism
Reference 4: Planning Committee page of the i-Construction / Infrastructure DX Promotion Consortium
The fourth place to check is the Planning Committee page of the i-Construction / Infrastructure DX Promotion Consortium. Checking this page makes it easier to follow how i-Construction 2.0 has been discussed and what issues have been treated since it was formulated. The consortium aims to create highly productive new construction sites and drive operational transformation in the infrastructure sector by utilizing ICT and other technologies across a wide range of processes—investigation, surveying, design, construction, and maintenance—and by promoting collaboration among industry, academia, and government. The page organizes the Planning Committee’s news, distributed materials, meeting summaries, and links to each working group. It is a very important reference for those who want to know the current status of the system.
A major advantage of this page is that it compiles not just announcements but the materials distributed at each meeting and summaries of proceedings. For example, the entry for the 11th Planning Committee lists the agenda, materials, and summary of proceedings, and past meetings can be tracked in the same way. In other words, you can review i-Construction-related measures as a continuous flow of discussion rather than as one-off news. For readers of the materials, it becomes easier to discern how official policy has shifted into practical issues at the implementation stage, where the difficulties lie, and which technologies or operations will become the next focus. To understand the current state of the system, this Planning Committee page is indispensable.
Furthermore, the Planning Committee page also provides links to working groups on technological development and adoption, three-dimensional data distribution and utilization, and international standards. Among the three pillars of i-Construction 2.0, when you want to delve into the specifics of data integration and technology adoption, reviewing these related discussions will deepen your understanding. Policies that can seem abstract if you only read the general statements become clearer about which practical areas they aim to improve when you look at meeting materials and minutes. If you want to go one step beyond the overall policy and grasp the substance of the discussions and the key themes, you should definitely check this page. Ministry of Land, Infrastructure, Transport and Tourism
Reference 5: Press release page that publishes planned initiatives and progress by fiscal year
The fifth place to check is the press release pages that publish each fiscal year’s planned initiatives and progress. If you only look at the materials from when a system was formulated, the information will inevitably become outdated. Regarding i-Construction 2.0, a press release page was published on April 18, 2025 that both summarized the first year’s results and announced the outline of initiatives for 2025. There, the overall framework—such as that i-Construction 2.0 is being advanced, the goals aimed for by fiscal 2040, and the three pillars—was restated, and supporting documents are attached. These kinds of annual update pages are indispensable for separating the initial policy from how things proceed afterward.
For operational staff, this source is important because it makes the "current priorities" easier to see than the "original" policy documents. Materials produced during formulation are useful for understanding long-term policy, but to grasp which areas are being emphasized on the ground now, what the most recent achievements are, and the direction for the next fiscal year, annual implementation documents are easier to follow. In particular, if you want to reflect i-Construction 2.0 in your company's proposals, internal plans, or updates to training materials, you need to track not only the documents created at the time of formulation but also these annual update notices. Because updates are likely to continue to be released in the same format, it's useful to keep this in mind as a regular monitoring point.
As of April 2026, a broad survey of related information shows that on the Ministry of Land, Infrastructure, Transport and Tourism website thematic discussions are continuing, such as the Planning Committee information from December 2025, the Working Group on Utilizing Physical AI and AI Robotics from February 2026, and the BIM/CIM Promotion Committee from March 2026. In other words, i-Construction 2.0 is not a policy that ends with reading the formulated documents, but a measure being concretized through surrounding committees and working groups. If you want to track the latest developments, using the page for planned initiatives for the fiscal year as a baseline while also checking updates from related committees will make it less likely you miss anything.
How to Find Documents Without Getting Lost
So far I have introduced five sources to check, but you do not actually need to read all of them at the same depth. To search efficiently, it helps to first divide “what you want to know” into three parts. First, if you only want to know what i-Construction 2.0 is, the press release page from when it was formulated and the DX Promotion Headquarters’ overview materials are sufficient. Second, if you want to understand the background, institutional design, and the meaning of the three pillars, you should read through the DX Promotion Headquarters’ main documents. Third, if you want to know the latest progress and current issues, it is appropriate to look at the annual plan page and the planning committee page. Viewing them in this order lets you avoid missing information while also preventing over-reading.
Another important point is not to read a PDF you happen to find in search results in isolation, but to go back and check which page it came from. Even for the same i-Construction–related materials, the implications differ depending on whether the document is the main text from when it was drafted, a presentation for a meeting, or a progress report. Returning to the overview page or the committee page makes it easier to understand the document’s context and sequence, reducing the risk of misreading. This is especially important when using materials for internal explanations: if you misidentify a document’s status, you may end up treating outdated content as current policy. In practice, it is important to look not only at the document itself but also at the context of the page where that document is placed.
Checkpoints for Operational Staff When Reviewing Documents
When practitioners read the i-Construction 2.0 materials, it is important not to simply memorize terminology but to read them in relation to their own work. For example, if you are a construction-side practitioner, pay attention to descriptions of "automation of construction" and consider which tasks are likely to be targets for labor-saving and to what extent remote operation and automation are assumed, as this will make it easier to connect the material to actual practice. If you are closer to design or data management, focus on the "automation of data linkage" and check how 3D data and BIM/CIM are positioned, which will make the direction of the operational foundation that will be required clearer. If you are involved in construction management or inspection, reading from the perspectives of document reduction, enhancement of supervision, and improvement of inspection efficiency will make it easier to identify points of contact with your daily work.
Also, when reading documents, your understanding deepens if you pay attention not only to what is new but also to what continues to be emphasized. Rather than being a sudden, entirely different policy, i-Construction 2.0 is positioned as an acceleration of the i-Construction efforts pursued since fiscal 2016, advancing them toward a stage of automation. Therefore, it is important to discern what will change along the continuum of existing ICT utilization and 3D data usage. By reading with an awareness of continuity with existing measures, rather than only following new initiatives, it becomes easier to see where your company currently stands and what should be prioritized next.
Furthermore, in practice it is necessary not to stop at merely reading documents but to adopt a perspective that translates them into actions within the company. For example, it is important to read in a way that leads to action—such as creating summaries to share in meetings, reviewing role assignments among relevant staff, organizing the flow of data used on site, and identifying processes with potential for remote operation or automation. The i-Construction 2.0 materials may appear to be policy explanations, but essentially they are guidance for changing how work is done on site, how information is connected, and how construction management is carried out. If you set the purpose of reading not simply to “understand” but to “decide what to change,” you will find it easier to appreciate the value of the materials.
Summary
When you want to review materials on i-Construction 2.0, rather than opening search results at random, it is important to organize the sources to check by role. First, pin down the entry point to the system on the press release page published at the time of formulation; next, check the overview and main text on the DX Promotion Headquarters’ distribution materials page; then use the comprehensive page to grasp the breadth of related materials. After that, follow current discussions and issues on the Planning Committee page, and supplement recent developments by consulting the pages for each fiscal year’s planned initiatives and progress—doing so will give you a fairly three-dimensional understanding of i-Construction 2.0. What practitioners need is not merely an understanding of terminology, but knowledge of which documents to view and in what order to lead to sound decisions and actions.
After reading the documents, it is important to think about how to connect them to practical work such as on-site positioning, as-built verification, utilization of 3D data, and streamlining construction management. What i-Construction 2.0 aims for is not to increase the amount of documentation, but to realize construction sites where even a small number of people can work safely, comfortably, and productively. As a means of concretizing that direction on-site, using iPhone-mounted high-precision GNSS positioning devices like LRTK makes it easier to introduce the entry points for acquiring position information and utilizing 3D data at the site. By linking the study of regulatory documents with actual on-site improvements, understanding of i-Construction 2.0 shifts from theoretical knowledge to practical, usable expertise.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.


