Where to Look for i-Construction Guidelines? How to Find Ministry of Land, Infrastructure, Transport and Tourism Documents and Key Points
By LRTK Team (Lefixea Inc.)
Table of Contents
• Premises to grasp first when searching for i-Construction documents
• What does the i-Construction concept include?
• Decide “why you are looking” before searching for guidelines
• How to search documents based on your purpose
• How to search documents by target work types or construction phases
• How to search documents based on 3D data and deliverables
• How to search documents from the standpoint of as-built management and inspection
• Importance of reading with awareness of relationships to other documents
• Common stumbling blocks when reading documents
• How beginners should progress through the material without getting lost
• The meaning of reading i-Construction 2.0 and DX Action Plan policy documents
• How to decide which documents to use on site
• Points easily lost sight of when searching for documents
• The overall picture you should hold when reading i-Construction documents
• Summary
Premises to grasp first when searching for i-Construction documents
When trying to investigate the i-Construction guidelines, a common initial difficulty is not knowing which documents to look at first. Even if the term i-Construction is widely known, what you actually need in the workplace is not just an explanation of the concept. Unless you organize which documents to consult within the flow that includes survey/topography, design, construction, inspection, and maintenance/renewal, it will be hard to reach the information you want.
What’s important here is not making document-hunting itself the objective. Rather than memorizing document names, it is crucial to clarify what you want to confirm and to distinguish which types of documents match that content. For beginners, it is easier to first grasp the overall picture and then narrow down to the necessary types of documents.
When searching i-Construction documents, it is recommended to be aware of purpose, target work types and construction phases, the required 3D data and deliverables, how as-built management and inspection treat them, and relationships to other documents. In other words, when searching, do not lump everything together as “i-Construction guidelines”; instead, proceed while organizing which scene and which confirmation you need.
Once you can organize this, document searching becomes much clearer. Conversely, if you start searching without this organization, you might be looking at policy documents but be unable to confirm operational details, or you might be looking at as-built management and inspection documents without sufficient understanding of the prerequisite construction phases, making it hard to find the necessary answers. The basic approach to searching i-Construction documents is to first see the whole picture, then choose the types of documents according to the scene you need to confirm.
What does the i-Construction concept include?
Before searching documents, it is essential to understand what the i-Construction initiative covers. i-Construction is a productivity improvement initiative that includes survey/topography, design, construction, inspection, and maintenance/renewal. If you do not grasp this, you may assume it only concerns construction and thereby narrow the scope of documents you consider necessary.
For example, when a person involved in construction on site tries to look up i-Construction, they tend to think that only construction-phase documents are sufficient. But i-Construction is not a concept that ends with construction. It includes the flow of what is handled at the survey/topography and design stages, which kinds of data and deliverables are involved, and how these connect to subsequent inspection and maintenance/renewal. In short, document searching requires a cross-phase perspective.
Understanding this overall picture also makes it easier to classify related documents. Guidelines related to ICT construction help confirm practical matters close to construction; standards and guidelines on 3D data utilization provide clues about what kinds of data and deliverables to be aware of; documents on as-built management and inspection are important for understanding how things are ultimately handled. And policy documents such as i-Construction 2.0 and the DX Action Plan help you understand why the document system is arranged as it is and what the overall objectives are.
For beginners, the important point is not to memorize document names or classifications. It is to understand that i-Construction is a productivity improvement initiative covering all phases, and that multiple document groups exist for that reason. With that understanding, when searching for documents you can ask yourself, “Which phase and which confirmation am I trying to make right now?”
Decide “why you are looking” before searching for guidelines
The first thing to decide in searching for i-Construction documents is why you are looking at the documents. If this is vague, you may open several seemingly relevant documents and still not know where the answer lies.
For example, the types of documents you should consult differ depending on whether you want to confirm the method of proceeding with construction itself, check how 3D data and deliverables are to be handled, or learn what to be aware of in as-built management and inspection. Also, whether you want to know the overall policy or specific operational handling changes which documents you should start with.
One useful approach is to express the content you want to confirm in a single sentence. For instance: “I want to see guidelines related to construction,” “I want to confirm the approach to 3D data and deliverables,” “I want to know how this connects to as-built management and inspection,” or “I want to grasp the overall policy.” Even stating the confirmation objective briefly makes the direction of document searching considerably clearer.
Beginners tend to try to think about their purpose after they start searching. But because i-Construction covers many phases and types of documents, searching without a purpose leads to touching on a wide range of materials at once and makes understanding scattered. Conversely, if the purpose is set, you can narrow down the necessary document groups.
The point here is not to set the purpose perfectly from the start. Even a rough distinction — whether you want to know policy, phase-specific handling, or the relationship to deliverables and inspection — is important. Simply being able to make this distinction will greatly facilitate document searching.
Also note that i-Construction documents are interrelated. Thus, even if you start with documents according to your initial purpose, you may find the need to consult other documents along the way. This does not mean your search method is wrong; rather, it is natural. What matters is choosing the initial entry point according to your purpose. Choosing the right entry point alone can greatly change the order in which you read and how easily you understand the material.
How to search documents based on your purpose
When searching from the perspective of purpose, it helps to broadly categorize documents by their roles. Related documents include guidelines related to ICT construction, standards and guidelines for 3D data utilization, documents on as-built management and inspection, and policy documents such as i-Construction 2.0 and the DX Action Plan. Although these are all i-Construction materials, they each play different roles.
If you want confirmations close to construction practice, think in terms of the guidelines related to ICT construction. If you want to think about 3D data and deliverables, the standards and guidelines for 3D data utilization are appropriate; these focus on what kinds of data and deliverables to be aware of.
If the viewpoint of as-built management and inspection is necessary, then naturally you should consult documents on as-built management and inspection. In practice, viewing only intermediate-phase documents is insufficient if you don’t understand how things will be handled in the end. Therefore, you need the perspective that looks beyond verifying deliverables or phases to see how they connect to management and inspection.
If you want to understand the overall policy, i-Construction 2.0 and the DX Action Plan policy documents are useful. These are less about detailed operational checks and more about understanding the direction and priorities of i-Construction. Looking only at specific guidelines can obscure the broader meaning, but reviewing policy documents helps you see how those specific documents are positioned.
In short, searching by purpose means linking what you want to know to the role of documents. Is it about construction, 3D data, as-built management and inspection, or overall policy? If you can make this separation, you will be less confused even when many related documents appear.
For beginners, it may be effective to first grasp the overall picture via policy documents and then proceed to the necessary specific documents. Conversely, if your purpose is already clear, you may start from the required guidelines or standards and then check the overall policy as needed. The important thing is to connect purpose with the role of documents.
How to search documents by target work types or construction phases
In searching i-Construction documents, it is also important to be conscious of target work types and construction phases. Because i-Construction is an initiative that includes survey/topography, design, construction, inspection, and maintenance/renewal, the way you should read documents changes depending on which phase you are viewing.
For example, what you consider at the survey/topography stage differs from what you consider at the construction stage. There are also perspectives needed at the design stage and things to emphasize during inspection or maintenance/renewal. Since i-Construction encompasses this series of phases, it is essential in document searching to be clear about which phase you are in.
Beginners often get confused by documents that span phases. For instance, the handling of 3D data and deliverables is not limited to a single phase but relates to preceding and following phases. Therefore, even if you intend to check something during construction, you may need to consider its relationship to survey/topography, design, or inspection. If you are not conscious of the target phase, you may easily overlook related documents.
Being conscious of target work types or phases does not mean memorizing detailed classifications. It means being able to state which stage your confirmation relates to: survey/topography, design, construction, inspection, or maintenance/renewal. Doing this at the outset makes it easier to find related document groups.
Also, by being aware of the phase, your perspective when reading the same document changes. Even when reading policy documents, how you interpret them differs depending on whether you read them from a construction perspective or from an inspection and maintenance/renewal perspective. In other words, organizing the target phase helps not only in finding documents but also in reading them.
Although i-Construction aims for overall optimization, when searching documents you should first clarify which point you are checking; doing so will lead to a better overall understanding. Because the initiative is broad, it is important at the entry point to clearly separate the phases.
How to search documents based on 3D data and deliverables
When searching i-Construction documents, it is also important to think in terms of 3D data and deliverables. Even the fact memo indicates that when searching documents you should be aware of the required 3D data and deliverables. This is because i-Construction is not only about improving processes but is deeply related to how data and deliverables are handled within those processes.
Related documents include standards and guidelines for 3D data utilization. Therefore, when searching documents with the viewpoint “what kind of 3D data is involved” or “what should be considered as a deliverable,” it becomes easier to decide which documents to consult. Even when purpose or phase alone does not fully organize the search, adding the axis of data and deliverables makes the search more concrete.
Beginners tend to search only by phase terminology. But in i-Construction, it is important not only which phase you are in but also what you handle in that phase and what you regard as deliverables. In the flow that includes survey/topography, design, construction, inspection, and maintenance/renewal, the meaning of the data and deliverables handled changes as the phases progress. Therefore, having the viewpoint of 3D data and deliverables increases the precision of document searching beyond merely checking phases.
Also, by being conscious of 3D data and deliverables, relationships with other documents become easier to see. You should not stop at viewing only the standards and guidelines for 3D data utilization; you need to confirm how that data and those deliverables are treated in as-built management and inspection. In that sense, data and deliverables serve as a common perspective that links different document groups.
Holding this perspective changes how you read documents. Rather than merely noting that “the document exists,” you begin to ask, “Which 3D data and deliverables should this document be read with?” This clarifies the differing roles of documents and helps structure the order in which you read them.
When searching i-Construction documents, the viewpoint of data and deliverables is as important as the phases. If you get confused searching by phase, look at the 3D data and deliverables involved; this will lead you to the necessary documents more easily.
How to search documents from the standpoint of as-built management and inspection
The standpoint of as-built management and inspection is extremely important when searching i-Construction documents. No matter how much data and how many deliverables you handle during the phases, if you do not understand how they will be treated in the final as-built management and inspection, the practical linkage is obscure.
The fact memo indicates that related documents include materials on as-built management and inspection. This shows that i-Construction is considered a sequence that includes inspection, not just construction. It is important not only to confirm construction-stage thinking and 3D data handling, but also to see how these connect to subsequent management and inspection.
A common stumbling block for beginners is excerpting only the middle phases. For example, if you are interested in construction or 3D data utilization, you may read only those documents. However, unless you also keep in mind how as-built management and inspection handle the results, you cannot determine what to emphasize. Checking deliverables and data only makes sense when considered in light of how they will ultimately be treated.
Therefore, when searching documents, it is important to ask not only “how to implement” but also “how will this content be treated in as-built management and inspection.” You will then see that one specific guideline is not necessarily self-sufficient. In practice, you must go back and forth between phase documents and management/inspection documents to deepen understanding.
Also, taking the as-built management and inspection viewpoint makes it easier to see relationships with other documents. Even if phase and data documents exist separately from management/inspection documents, they are actually connected. Reading documents while being conscious of this connection helps you understand them not as a list of documents but as a coherent flow from construction to deliverable verification.
If organizing i-Construction document searching for beginners, emphasize not only construction and 3D data but always include as-built management and inspection. This viewpoint alone makes clear which documents to consult and how far to check.
Importance of reading with awareness of relationships to other documents
When reading i-Construction documents, it is particularly important to be aware of relationships to other documents. The fact memo also states that it is important to be conscious of other documents when searching. This is because related i-Construction documents do not complete a single function by themselves; multiple documents divide roles to form the whole.
For example, policy documents help you understand the overall direction, but you cannot complete all practical confirmations with policy documents alone. Conversely, if you read only specific guidelines and standards, it is hard to see why certain items are emphasized. In short, policy documents and specific documents have different roles, and relying on one side leads to a skewed understanding.
Similarly, even when looking at standards and guidelines for 3D data utilization, if you do not consider how they connect to as-built management and inspection documents, your reading becomes partial. Even when viewing guidelines related to ICT construction, you need to be conscious of data and deliverables perspectives and the relationship to management and inspection. Thinking of i-Construction documents as composed of phases, data, deliverables, management, inspection, and policy that interact with each other makes them easier to understand.
Beginners tend to expect that one document contains all the correct answers. However, for a broad initiative like i-Construction, tracing how documents relate to each other is itself part of understanding. You do not have to grasp everything at once, but simply reading with the awareness that “this document alone may not be sufficient” will change how you read.
Being conscious of relationships among documents also improves search efficiency. When questions remain after reading one document, it becomes easier to think which type of document can fill that gap. If your question is about construction, look at ICT construction guidelines; if your question is about data or deliverables, check standards and guidelines for 3D data utilization; if your question is about inspection connections, check as-built management and inspection documents; if your question is about overall thinking, check policy documents — this way you can judge where to look next.
i-Construction documents are easier to understand when considered in context rather than in isolation. Being aware of document interconnections leads beginners to the shortest path to understanding.
Common stumbling blocks when reading documents
When searching i-Construction documents, several stumbling blocks often occur. The most frequent is assuming i-Construction is only an effort for construction. Because i-Construction is a productivity improvement initiative covering survey/topography, design, construction, inspection, and maintenance/renewal, focusing only on construction narrows the range of necessary documents.
The next frequent issue is confusing the roles of policy documents and specific documents. Policy documents such as i-Construction 2.0 and the DX Action Plan are important for understanding the overall direction and goals. On the other hand, ICT construction guidelines, standards and guidelines for 3D data utilization, and documents on as-built management and inspection are better suited for concrete confirmations. If you do not recognize this difference, you might try to understand specific operations solely from policy documents or try to learn the entire background solely from specific documents, causing misunderstandings.
Another major stumbling block is starting to read without deciding a purpose. When the verification goal is unclear, multiple perspectives—construction, data, deliverables, inspection, policy—come in simultaneously and you cannot tell which information is necessary. Because i-Construction documents are highly interrelated, looking too broadly without a purpose can actually impede understanding.
Also, failing to be conscious of the relevant construction phase causes confusion. Since the initiative covers everything from survey/topography to maintenance/renewal, you must organize which stage you are checking; otherwise, it becomes difficult to distinguish among documents. You need to be clear whether you are looking at construction, inspection, or overall policy.
Another significant mistake is underestimating the importance of 3D data and deliverables. If you try to organize everything only by phase, you may fail to see how data and deliverables are handled and thus miss connections to other documents. In i-Construction, it is important to be aware not only of phases but also of the data and deliverables involved.
These stumbling blocks arise not because beginners are inexperienced but because the i-Construction initiative itself is broad. That is why it is essential to return to the five perspectives: purpose, target work types and construction phases, required 3D data and deliverables, treatment in as-built management and inspection, and relationships to other documents. Returning to these five reduces confusion in document searching considerably.
How beginners should progress through the material without getting lost
When beginners read i-Construction documents, it is important not to chase fine distinctions from the start. First, you need to grasp what i-Construction includes. If you understand it as a productivity improvement initiative covering survey/topography, design, construction, inspection, and maintenance/renewal, the prerequisites for subsequent document searching are in place.
Next, decide why you are looking at the documents. Are you confirming construction, checking 3D data and deliverables, understanding the connection to as-built management and inspection, or grasping the overall policy? You do not have to narrow your purpose to one item at this stage, but at least set an entry point.
Then choose the type of documents to consult first. If you want the overall picture, start with policy documents; for construction confirmation, go to ICT construction guidelines; for data and deliverables, check standards and guidelines for 3D data utilization; and for management and inspection, consult documents on as-built management and inspection. Match purpose to document roles.
When reading, do not try to complete everything with a single document. If questions arise, consider whether they should be supplemented by another document group. For instance, if you understand the policy but not how phases are handled, go to specific guidelines; if you understand phases but not the connection to deliverables or inspection, consult the related standards or management/inspection documents. Link documents in this way.
Also, avoid fixing the reading order too rigidly. For beginners, starting from the overall policy may be easy to follow, but when specific on-site confirmations are needed, starting from specific documents and returning to the policy afterward may be easier to understand. The important thing is that whichever order you choose, you should end up going back and forth between policy and specific documents to build understanding.
The basic approach for beginners is to look broadly first, then narrow down, and after narrowing, expand again to related documents. Once you can do this back-and-forth, i-Construction documents become suddenly easier to read.
The meaning of reading i-Construction 2.0 and DX Action Plan policy documents
Even when reading specific i-Construction documents, it is meaningful to review the i-Construction 2.0 and DX Action Plan policy documents. This is because these policy documents help you understand the direction within which the related guidelines and standards are placed.
The fact memo lists i-Construction 2.0 and the DX Action Plan policy documents among related materials. This indicates that understanding i-Construction requires not only specific operational knowledge but also grasping the overall initiative’s thinking. Guidelines and standards help with concrete confirmations, but to know the underlying rationale you should consult policy documents.
If beginners read only specific documents, they may understand the confirmation items but not see what the initiative as a whole is trying to achieve. As a result, they may fail to place documents in context and struggle to understand relationships when they view other materials. Reviewing policy documents makes it easier to see the whole set of related materials as a single initiative.
Of course, if you only need to confirm practical operational details, you do not always have to read policy documents in depth from the start. However, in terms of reducing confusion and stabilizing how you search documents, it is valuable to touch policy documents. For beginners, the major advantage is that it helps them understand “what kind of documents these are for.”
How to decide which documents to use on site
On site, when deciding which i-Construction documents to use, it is more important to think in terms of perspectives to be confirmed than to memorize document types. The perspectives you should hold are purpose, target work types and construction phases, 3D data and deliverables, as-built management and inspection, and relationships to other documents. The fact memo’s organization serves directly as the basic method for using and distinguishing documents.
First, from the purpose viewpoint, clarify what you want to know. The entry point changes depending on whether you want to know overall policy, phase handling, data and deliverables, or management and inspection. Next, from the target work types and phases viewpoint, confirm which stage you are currently checking. This makes it easier to narrow down the necessary document groups.
Then, by adopting the 3D data and deliverables viewpoint, you can see connections that are not apparent from phase documents alone. Adding the viewpoint of as-built management and inspection allows you to consider not only intermediate phases but also how things will be handled later. Finally, thinking about relationships to other documents lets you supplement what one document lacks with another.
With this approach, using documents on site is no longer difficult. In practice, you will view construction documents while being conscious of data and deliverables, proceed to management and inspection documents as necessary, and return to policy documents to understand the whole picture. The important thing is to move between documents according to the perspectives you need to confirm rather than reading each document in isolation.
Because i-Construction is a productivity improvement initiative that spans many phases, deciding which documents to use on site starts with organizing where in the overall picture you are looking. Once this approach is internalized, even beginners can more easily reach the documents they need.
Points easily lost sight of when searching for documents
When searching i-Construction documents, you can lose track of what you are looking at midway. The most easily lost point is a mismatch between your purpose and the role of the documents you are viewing. If you want to know policy but are only following specific documents, or you want practical handling but are only looking at policy documents, your understanding can spin its wheels.
The breadth of the phases is also easy to lose sight of. i-Construction includes survey/topography, design, construction, inspection, and maintenance/renewal. If you forget this breadth, you may not know which phase the confirmation you need belongs to, making document searching fuzzy.
Furthermore, if you read without the viewpoint of 3D data and deliverables, you can lose sight of how documents connect to each other. When you think only in terms of phases, it becomes less clear why you must consult other documents. Because i-Construction connects phases, data, deliverables, management, and inspection, reading from a single axis runs into limits.
Postponing consideration of how as-built management and inspection handle matters is another common way to lose your way. If you are satisfied with confirming intermediate phases, you will not see the connection to final handling and your practical understanding will be weak. Always bear in mind that document searching requires the perspective of final management and inspection.
Above all, ignoring relationships with other documents is the biggest way to lose your bearings. Related i-Construction documents exist to complement each other. Attempting to complete everything with one document tends to generate more questions. When questions arise, rather than thinking your reading method is wrong, it is better to consider that you have reached the stage where you should look at the relationships to other documents.
The overall picture you should hold when reading i-Construction documents
There is not a single related document. There are guidelines related to ICT construction, standards and guidelines for 3D data utilization, documents on as-built management and inspection, and policy documents such as i-Construction 2.0 and the DX Action Plan, each with different roles. When searching documents, do not view these in parallel; choose them according to what you want to confirm and move between them as necessary.
When searching, be conscious of purpose, target work types and construction phases, required 3D data and deliverables, how as-built management and inspection treat them, and relationships to other documents. These five perspectives are like a map for document searching. If you lose track of where to look, returning to these five will help you organize what you should be searching for.
For beginners, the important point is not to try to understand everything at once. First grasp the overall picture, then choose document types according to your purpose and expand to related documents as necessary. Repeating this flow gradually makes i-Construction documents easier to read. Do not view the abundance of documents itself as a difficulty; understand that different documents exist to support a broad initiative—this is the first step.
Summary
As entry points, there are guidelines related to ICT construction, standards and guidelines for 3D data utilization, documents on as-built management and inspection, and policy documents such as i-Construction 2.0 and the DX Action Plan. Which to consult depends on purpose, target work types and construction phases, required 3D data and deliverables, how they are treated in as-built management and inspection, and relationships to other documents.
For beginners, it is effective to first grasp the overall picture. i-Construction is not only about construction; it is a productivity improvement initiative across all phases whose background goal is to build a system that enables small teams to safely and sustainably carry out high-quality infrastructure construction and management. With that overall picture, narrowing down to the necessary documents makes document searching far easier.
When in doubt, do not try to conclude the answer with a single document. Policy documents and specific documents, phase documents and management/inspection documents, and documents about 3D data and deliverables each have different roles. Reading while being aware of relationships among documents will reveal that i-Construction guidelines are not merely a collection of documents but linked information supporting the overall initiative.
The most important thing when searching i-Construction documents is not memorizing document names but organizing why, which phase, and which confirmation you want. With that organization, even many related documents will not confuse you and you can approach the necessary information more easily. For beginners, the flow of looking broadly first, narrowing, and then expanding to related documents is the shortcut to correctly interpreting i-Construction documents.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.