Wouldn't it be convenient if, on site, you could simply point a smartphone or tablet camera and see drawings or 3D models overlaid on the real scenery? It could greatly reduce the effort of measuring with a tape or driving stakes for layout. In recent years, the use of AR (augmented reality) technology for as-built management on construction sites has been spreading. By overlaying the design model onto the site through the camera, you can intuitively check whether the finished shape matches the drawings, and it promises to improve the efficiency of as-built management.


However, when actually using AR you will often feel that “the virtual model display is slightly offset from reality…?” In some cases, a virtual line or structure model displayed will appear to be offset from the real object's position by tens of centimeters. This problem of AR drift (the drifting of AR displays) has become a major barrier to full-scale use of AR in as-built management.


Digital transformation (DX) in the construction industry, promoted by initiatives such as the Ministry of Land, Infrastructure, Transport and Tourism’s *i-Construction*, has accelerated, and efforts to utilize digital data on site are active. AR is attracting attention as a means to reduce labor and provide quick as-built checks, but due to positioning accuracy issues it has traditionally been limited to experimental or “novelty” use. Recently, however, combining smartphone AR with high-precision GNSS positioning (RTK technology) is becoming able to solve this issue. This article explains the AR drift phenomenon and its main causes, the impact on as-built management, and the points for ensuring accuracy. It also introduces how to overcome the problem using high-precision AR with RTK and gives an example application of the latest solution, LRTK, for simple surveying.


What is AR drift

When virtual objects are overlaid on real space via a smartphone or tablet, there is a phenomenon in which the position gradually shifts over time or as the device moves. For example, a design line that should be displayed along the ground may appear to float 30 cm (11.8 in) above the actual ground, or a virtual equipment model may gradually appear to shift sideways from its intended installation position. This phenomenon, in which the position of the real and virtual objects does not precisely match and the discrepancy accumulates over time, is also referred to in the industry as drift. If the offset becomes large, the AR display content becomes unreliable, and the AR information becomes useless for on-site verification or work.


Main causes of AR drift

The causes of display offsets (AR drift) that occur in current smartphone AR mainly include the following:


• GPS accuracy limits: Built-in smartphone GPS commonly has errors of several meters. With an offset of several meters, virtual models cannot be placed precisely at their intended positions. If the position information is incorrect, the AR display will appear offset from reality by the same amount.

• Errors in heading sensors: Smartphone electronic compasses (magnetic sensors) and gyroscopes include small errors and drift. Even a slight error in heading can produce larger display offsets for more distant objects (for example, if the heading is off by 2°, at 10 m (32.8 ft) ahead this can result in a positional offset of tens of centimeters).

• AR mapping errors: AR estimates device motion by tracking feature points in the camera image, but if this mapping processing is not perfect, the positions of virtual objects will slowly drift. When the movement range is wide or the scene has few features, such as plain walls or flat ground, visual tracking becomes unstable and causes gradual display offsets.

• Environmental factors and coordinate inconsistencies: Magnetic disturbances from the surroundings or large steel structures can throw off the compass (heading). Also, be careful if the coordinate system of the design data used does not match the site survey coordinates. For example, if a drawing’s reference point is set incorrectly, the AR display can be offset from the site by several meters.


As described above, due to the positioning accuracy and attitude sensor accuracy of smartphone devices and the characteristics of AR engines, some degree of offset (drift) inevitably occurs using conventional methods.


Impact of AR drift on as-built management

If AR displays remain offset, various problems arise when applying them to as-built management. First, the reliability of the display is undermined, so site personnel may not trust the AR information provided and will end up relying on traditional measurement or visual checks. For example, even if construction has actually been performed correctly according to the drawings, if the model appears offset in AR, site staff may worry “is there some construction error?” and suspect unnecessary rework. Conversely, there is the risk of overlooking actual construction offsets because of AR display drift.


Also, low-accuracy AR is unusable in practice, so even if introduced, the site will require confirmation work with tape measures or surveying instruments as before. If the position is off by several meters, it’s out of the question, but even errors of several tens of centimeters are unacceptable for as-built management that requires high-precision alignment. In practice, opinions include “AR that is off by several meters is only good for play, but if the error is within a few centimeters it can be used for on-site checks.” In other words, if AR drift can be suppressed to below a few centimeters, it can become a practical tool.


Thus, solving AR drift and improving display accuracy is the key to fully leveraging AR in as-built management.


Conventional countermeasures for AR drift and their challenges

So, before high-precision GNSS methods became available, how did sites cope with AR offsets? The main conventional countermeasures were the following:


• Sensor calibration: Calibrating the smartphone’s electronic compass before use or placing it on a level surface to let the gyroscope drift reset. Procedures such as waving the device in a figure-eight motion or aiming the device at a reference line to fine-tune reduce attitude sensor errors as much as possible. However, this does not completely eliminate offsets, and errors will accumulate again after prolonged movement or environmental changes.

• Alignment using markers or reference points: Installing QR code markers or signboards on site and reading them with the camera to correct the virtual model’s position. Alternatively, manually adjusting the virtual model to correspond to known points on site is also done. This can correct the initial offset, but when moving over a wide area, other places may experience offsets again, and placing markers for each area is labor-intensive.

• Combining with simple surveying: Rather than relying solely on AR displays, measuring key coordinates with a total station or GNSS and offset-adjusting the AR model accordingly is another method. For example, surveying a particular point in the design data on site and inputting the difference into the app to correct overall alignment. This can provide a certain level of accuracy, but once surveying work is required, it can no longer be called “easy AR.”


Each of the above countermeasures has some effect but is not a fundamental solution. Manual adjustments and marker placement are time-consuming, and it is difficult for device sensors alone to maintain stable accuracy over long periods and wide areas. They are symptomatic measures of “trying to avoid drift as much as possible,” and insufficient to completely eliminate AR drift.


Eliminating AR drift with high-precision GNSS (RTK)

A trump card for fundamentally solving the AR drift problem is the use of high-precision GNSS positioning. Among them, the RTK (Real Time Kinematic) method enables centimeter-level positioning by correcting satellite positioning errors in real time. While regular smartphone GPS has errors of several meters, using RTK allows positioning with very high accuracy — for horizontal position on the order of ±1–2 cm (±0.4–0.8 in), and vertical accuracy also within a few centimeters.


If precise self-positioning is obtained via RTK, aligning virtual objects to actual coordinates becomes dramatically easier. Because the smartphone can almost perfectly determine its absolute position, as long as coordinate data from design drawings or BIM/CIM models are available, the AR display can make the virtual model and the real scenery match almost perfectly. This enables meeting the demand that was previously difficult: “overlaying drawings onto the site scenery with no deviation.”


Furthermore, high-precision positioning from RTK also helps suppress the AR engine’s drift (gradual offset). By continuously feeding absolute coordinates obtained from RTK into the AR system, minor tracking offsets are automatically corrected. As a result, users can get stable displays where the virtual model does not float or shift while walking around, without needing to re-adjust placed virtual objects repeatedly.


Recently, “smartphone RTK” solutions that make RTK technology easy to use on smartphones have appeared. For example, LRTK is one such solution, providing centimeter-level positioning simply by combining a small RTK-capable GNSS receiver that attaches to a smartphone with a dedicated app, enabling even non-specialists to achieve centimeter-class positioning. Using such smartphone RTK, high-precision AR can be deployed on site immediately without complicated preparation or manual steps.


Key points for ensuring accuracy in as-built management

Based on the above, the following points summarize how to ensure accuracy when using AR technology for as-built management.


• Use high-precision positioning technologies: If possible, introduce centimeter-level positioning technologies such as RTK-capable GNSS to correct the AR display’s reference position with high accuracy. Managing by absolute coordinates can dramatically reduce AR drift.

• Properly adjust device sensors: Calibrate the smartphone or tablet electronic compass before use to minimize attitude sensor errors. Calibrating on a level surface in a location with minimal magnetic interference is important to prevent heading drift.

• Align coordinate references in design data: Confirm that the coordinate system of the drawings or 3D models used matches the site survey coordinates. If reference points do not match, even very accurate positioning will produce offset AR displays. Verify model positions against known points beforehand and correct as needed.

• Use alternatives where GNSS is unavailable: In places where satellite positioning is not possible, such as indoors or in tunnels, consider placing AR models using local coordinates based on pre-measured known points. Aligning the model each time to locally set reference markers allows limited but high-precision AR displays.

• Maintain an environment suitable for AR operation: During AR use, keep tracking conditions as stable as possible. Poor lighting reduces camera tracking accuracy, so for night work use floodlights or devices with LiDAR sensors. For long sessions, consider restarting the app periodically to reset mapping errors.

• Perform on-site accuracy verification: Make it a habit to check AR accuracy against on-site known points or recognizable structures. For example, verify discrepancies at key points and re-adjust on the spot if necessary. Even with some error, by continuously verifying and correcting you can maintain practical accuracy and reliability for field work.


Simple surveying with LRTK

LRTK, which enables high-precision AR displays, is not only useful for overlay-checking design data but also serves as a simple surveying tool on site. With a smartphone and LRTK, a new workflow called “smartphone surveying” becomes possible, allowing one person to intuitively perform surveying and checks that previously required multiple people.


For example, in pre-construction stake driving, you can use LRTK’s coordinate navigation function to display the distance and direction to a specified coordinate on the smartphone screen and move accordingly to reach the stake position accurately even when working alone. By following on-screen arrows or virtual stake markers, you can arrive at the designated position within a few centimeters, so even inexperienced workers can perform the task with confidence.


In as-built management settings, if the planned 3D model is displayed in AR in advance, you can immediately check on site whether the finished work matches the drawings. Whether an embankment’s height has reached the design value becomes obvious from the smartphone camera view. If needed, you can scan the surroundings with LRTK and compare the acquired point cloud data with the design model in the cloud to perform quantitative verification on the spot.


LRTK also has a feature called positioned photos, which tags the high-precision coordinates and the camera orientation to photos taken with a smartphone and saves them to the cloud. If you return to the same location later, icons representing past photos appear in AR space, making it easy to understand changes over time or identify repair locations. Site management, which used to rely on human memory and paper records, can be greatly streamlined and enhanced with such features.


Thus, LRTK is an all-in-one site DX tool that combines AR visualization with high-precision positioning. By eliminating the stress of “positional offset” through high-precision AR and enabling seamless surveying, as-built verification, and inspection recordkeeping, it is expected to dramatically improve on-site productivity and accuracy. If you are interested, consider experiencing this new form of surveying and construction management with LRTK.


Frequently Asked Questions (FAQ)

Q: What equipment is required for high-precision AR displays? A: Basically you need a smartphone, a high-precision GNSS receiver (RTK-capable), and an AR display app that supports them. A representative solution is something like LRTK, which combines an RTK antenna that attaches to a smartphone with a dedicated app. The smartphone itself does not have to be the latest high-end model, but it should support AR functions (iOS ARKit or Android ARCore). For long continuous use, it’s also advisable to prepare power supplies like mobile batteries.


Q: Can people unfamiliar with smartphones use it? Is special training required? A: Compared to conventional surveying instruments, it is more intuitive to operate, but we recommend basic training beforehand. Learning app operation, basic RTK knowledge, and operational precautions reduces the risk of confusion on site. The system is designed so that non-surveying specialists can handle it, and there are cases where site supervisors and construction managers have learned the ropes through a few hours of training and trial use. Initially, compare results with veteran surveyors’ measurements experimentally and gradually expand use for smooth adoption.


Q: Do you need to set up an RTK base station every time? Can it be used at sites without communications? A: It depends on how you obtain RTK correction data. If there is a nearby public control station and the site has internet access, you can use services like the Geospatial Information Authority of Japan’s VRS (Virtual Reference Station) from your smartphone, enabling centimeter-level positioning without installing your own base station. This requires the smartphone to have network connectivity. In remote areas with poor communications, you can set up a simple mobile base station and transmit correction data by radio. In Japan, you can also use CLAS (Centimeter Level Augmentation Service) provided by the quasi-zenith satellite system Michibiki to receive correction data without the internet on compatible receivers. LRTK supports multiple methods, allowing flexible positioning operation according to site conditions.


Q: In practice, how closely do AR displays match reality? I’m worried about errors. A: Under good conditions, errors are typically about 1–2 cm (0.4–0.8 in) horizontally and within a few centimeters vertically. In most cases, you won’t perceive any visual offset. However, this assumes RTK maintains a stable “Fix” solution and the device’s attitude sensors are properly calibrated. In environments where satellite reception is unstable, such as forests or high-rise building canyons, accuracy degrades, and compass errors on the device also affect the display. While perfect millimeter-level alignment cannot be guaranteed at all times, practical, usable accuracy is achievable in normal outdoor environments. The important point is to verify AR accuracy against on-site known points or markers and use it with periodic checks and corrections; even with minor offsets, operational reliability can be secured in practice.


Q: Can AR overlays be used in dark places or at night? A: GNSS positioning itself does not lose accuracy at night. However, in dark conditions AR objects may be hard to see in the camera image, and the device’s visual tracking will struggle to maintain accuracy. For night or dark use, provide sufficient lighting on site or use devices equipped with LiDAR sensors to improve stability in low light. From a safety perspective, though, it is preferable to perform surveying and AR checks during daylight when possible. In dark sites, instead of relying on camera overlays, switching to high-precision positioning guidance (numeric navigation) is also an effective option.


Q: What about places where GNSS cannot be used, such as indoors or underground? A: In environments where satellite positioning is not possible, RTK absolute positions cannot be obtained. In that case, you can operate AR using local coordinates based on known points. For example, by pre-measuring multiple indoor points and using them as references to manually place the AR model, you can achieve high-precision overlays in a limited area. The idea is to match virtual markers to site reference points and adjust the model at each location. However, covering a wide area is laborious, so indoors it is often more practical to record and verify as-built conditions using 3D scanners or photogrammetry. On the other hand, in semi-outdoor situations where GNSS signals are temporarily blocked, LRTK’s high-precision positioning combined with device inertial navigation and AR mapping functions can sometimes maintain positioning for short periods. Choose and combine these methods according to site conditions.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.