
LRTK LiDAR
Markerless 3D Scanning
with Survey-Grade Coordinates

LRTK LiDAR–
Markerless 3D Scanning with
Survey-Grade Coordinates
Automatic Coordinate Tagging Without Markers
Skip time-consuming marker placement and start scanning right away. LRTK LiDAR automatically tags your scans with survey-grade coordinates as you capture them, delivering centimeter-level positioning and dramatically reducing on-site setup time—so you can focus on collecting usable 3D data, not preparing the site.

High-Resolution Scanning of Structures Up to 500 ft (150 m) Away
Capture high-resolution point clouds of distant structures from up to 500 ft (150 m) away—without getting close or setting up targets. This long-range capability lets you scan bridges, slopes, facades, and other hard-to-access assets safely and efficiently, while keeping your data tied to real-world coordinates for reliable measurement and documentation.

Capture Power Lines as Clean Point Clouds
Power lines are thin, complex features—yet they’re critical for inspection and clearance checks. LRTK LiDAR makes it easy to capture overhead cables and utility corridors as clean, usable point clouds, so you can review geometry, verify clearances, and document surrounding conditions (like vegetation proximity) with confidence.

Opens a 3D viewer sample in a new tab
Zero Missed Scans:
Verify Coverage On Site While Scanning
See what you’ve captured as you scan. LRTK LiDAR provides live, on-site feedback so you can verify coverage in real time, spot gaps immediately, and rescan before leaving the jobsite. This reduces rework and return visits—helping you deliver complete, reliable point clouds with confidence.
Automatic Absolute Coordinates:
Multiple Scans Align Perfectly
Because each scan is automatically tagged with absolute, georeferenced coordinates, multiple point clouds can line up in the same real-world reference frame with minimal manual registration. That means you can capture separate passes from different positions—or on different days—and still get a consistent, unified dataset you can trust for measurement, comparison, and documentation.

Opens a 3D viewer sample in a new tab
Survey Several Hectares per Hour
—even in Urban Areas
Cover more ground in less time—even in dense urban environments with narrow streets, tight access, and complex structures. LRTK LiDAR lets you capture survey-grade point clouds fast (often several hectares per hour, depending on site conditions), helping you complete surveys in hours instead of days and reducing costly return visits by confirming coverage as you work.
Store and Share Easily in LRTK Cloud (Unlimited Capacity)
Store your LRTK data in LRTK Cloud with unlimited capacity, so you never have to worry about file size or local storage. Share projects with your team or partners in seconds, keep everyone working from the same up-to-date data, and access your deliverables anytime, anywhere.

