
From Drone Images to Point Clouds—All in One Cloud Platform
LRTK Drone
LRTK Drone –
Drone Photogrammetry &
Point Cloud Processing in LRTK Cloud
No High-End PC Needed:
Cloud-Based Drone Photogrammetry
Process drone images into georeferenced point clouds and mapping deliverables entirely in the cloud—no powerful workstation, GPU setup, or complex software required. Upload your data, let LRTK Cloud handle the photogrammetry processing, and get results you can measure, review, and share from anywhere.

Opens a 3D viewer sample in a new tab

Opens a 3D viewer sample in a new tab
Create Point Clouds by Uploading a Drone Image Folder
Upload a folder of drone photos and LRTK Cloud automatically runs photogrammetry to generate georeferenced point clouds and survey-ready outputs. Get consistent results—then move straight into measurement, design comparison, and deliverable creation without extra setup.
Ground Control Points Supported for High-Accuracy Georeferencing
Use Ground Control Points (GCPs) to improve georeferencing accuracy and ensure your drone photogrammetry outputs align with real-world coordinates. With GCP support in LRTK Cloud, you can achieve more reliable point clouds and orthomosaics—especially on large sites or in demanding conditions.


Generate Georeferenced Orthomosaics
Create crisp, georeferenced orthomosaics from your drone imagery—ready for measurement, inspection, and documentation. With LRTK Cloud, you can view results in 2D, share them instantly, and use them as a reliable base layer for surveying and construction workflows.

Opens a 3D Ortho image sample in a new tab
Combine Drone Point Clouds with
LRTK Phone Survey Data
Because both datasets carry absolute, georeferenced coordinates, drone point clouds and LRTK Phone survey measurements align automatically—no manual registration or time-consuming matching. Combine aerial coverage with ground-verified points to build a complete, consistent site model.


Zooming in, you can see that areas hidden in the drone point cloud—such as shadows under trees—are perfectly filled in with point clouds captured by LRTK Phone.


Opens a 3D viewer sample in a new tab
Analyze Point Clouds: Coordinates, Distance, Slope, Area, and Volume
Measure what matters directly on your georeferenced point clouds—coordinates, distance, slope, area, and volume—without complicated tools or workflows. In LRTK Cloud, you can switch between 2D and 3D views, take measurements in seconds, and share results with your team.
Note: The measurement images and videos shown here were captured using point clouds collected with LRTK Phone.

Export Cross Sections as
DXF for CAD Workflows
Generate cross sections from your georeferenced point clouds and export them as DXF for seamless CAD workflows. Quickly create profiles for design review, documentation, and as-built drawings—without manual tracing or time-consuming post-processing.


Create Contours
and Other Survey Deliverables
Create contour lines and other survey deliverables directly from your georeferenced point clouds. Generate outputs such as contours, surface models, and orthomosaics as needed—so you can move from capture to deliverables without extra software or complex workflows.
Store and Share Easily in LRTK Cloud (Unlimited Capacity)
Store your drone and LRTK data in LRTK Cloud with unlimited capacity, so you never have to worry about file size or local storage. Share projects with your team or partners in seconds, keep everyone working from the same up-to-date data, and access your deliverables anytime, anywhere.

