Smartphone × AR construction for pile-driving DX! No layout marking required, labor saving, and high-precision guidance enable anyone to perform precision construction

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Table of contents

• Challenges of traditional pile-driving and layout marking work

• What is pile-driving guidance using smartphone AR

• How to use AR pile-driving guidance

• Benefits of pile-driving DX achieved with AR

• What is simple surveying using LRTK

• Frequently asked questions


In recent years, a new construction method using smartphones and AR (augmented reality) technology has been attracting attention in construction and civil engineering sites. This approach, often called "AR construction," has dramatically improved the efficiency of position-setting work that previously relied on skilled surveyors. In pile-driving work, which forms the foundation of structures, AR can replace drawing-based layout marking (position marking), making layout marking unnecessary and enabling anyone to determine pile positions accurately. With just a smartphone in hand and following digital guidance, precision construction becomes possible, achieving measures against labor shortages through labor saving and quality improvement through high-precision guidance. This article explains in detail the benefits of pile-driving DX (digital transformation) using smartphone × AR, comparisons with traditional methods, on-site use cases, and ease of introduction. At the end, we also introduce the notable tool "LRTK," which can perform surveying and point-cloud scanning with centimeter-level precision (cm level accuracy (half-inch accuracy)).


Challenges of traditional pile-driving and layout marking work

In civil engineering and construction, the processes of accurately installing piles at positions indicated on the design drawings ("pile-driving") and indicating column positions and the like on site ("layout marking" or "position setting") are indispensable. If the foundation position shifts by even a few centimeters (a few inches), it can affect the structure, making this a critically important process that determines construction accuracy and safety. However, producing accurate pile positions on site using conventional methods is by no means easy.


Generally, a team of multiple people including a surveyor uses a total station (an optical surveying instrument) and measuring tapes to measure distances and angles from reference points and mark the ground with pile markers or chalk. Even to identify the position of a single pile requires multiple surveying steps, and when placing dozens of piles on a large site, it is not uncommon for the positioning work alone to take an entire day. Moreover, as long as the work is primarily manual, the risk of human error cannot be avoided. Slight measurement mistakes or marking errors can shift pile positions, potentially causing rework or construction errors in later stages.


In addition, there are challenges in terms of efficiency and safety. For example, when surveying and layout marking on steep slopes or muddy ground, poor footing can put workers at risk and extend work time. Having surveying staff approach pile positions to mark them in areas where heavy machinery is operating can also lead to potential collisions with equipment. There are also places where layout marking itself is difficult, such as when the ground is hard concrete and nails cannot be driven, or when it is physically impossible to mark on the side of a cliff. In such cases, workers have had to compromise with approximate positions, resulting in variability in construction accuracy.


In short, traditional pile-driving and layout marking work required advanced skills, a great deal of manpower and time, and still left concerns about accuracy management and safety. To solve these on-site problems, a new method of pile-driving position guidance using smartphones and AR has emerged in recent years.


What is pile-driving guidance using smartphone AR

"AR pile-driving guidance" is a system that overlays digital information onto the camera image of a smartphone or tablet and navigates the worker to the specified coordinates. It’s similar to the feature in map apps that displays arrows on the camera view to guide direction, but applied to guiding pile positions on construction sites. By preloading the coordinate data from the drawings into the app, when a worker holds up a smartphone on site the target point marker or navigation information indicating "drive a pile here" is displayed on the real view.


The key to realizing this system is linking with high-precision positioning technology that allows the smartphone to determine its current position within a few centimeters (a few inches) of error. The built-in GPS of ordinary smartphones has errors on the order of meters and is insufficient for displaying precise pile positions in AR. What is used instead is high-precision GNSS positioning such as the RTK method, which drastically reduces satellite positioning errors by using correction information from base stations. In Japan, the quasi-zenith satellite "Michibiki" provides the centimeter-level positioning augmentation service (CLAS), and an environment is being established where RTK positioning can be used without installing dedicated base stations. By attaching an external high-precision GNSS receiver to a smartphone to enable RTK, it is possible to measure the current position with accuracy comparable to that of a traditional total station.


By combining high-precision current position information with AR display, pile-driving guidance has evolved into a true "construction-site car navigation." The direction and remaining distance to the target point are displayed in real time on the smartphone screen over the actual scenery, and the worker can reach the target simply by following those instructions. For example, if you select the desired pile number in the app, navigation such as "5 cm east" and "10 cm north" will be displayed on the screen. By moving a few steps according to the instructions, your position will align with the design point; when you reach the target, a virtual pile (AR marker) will pop up on the ground in the camera view. Because the ground viewed through the smartphone shows the marker indicating "this is the pile tip position," even inexperienced staff can unerringly identify the exact point.


How to use AR pile-driving guidance

When actually using smartphone AR for pile-driving position guidance, the basic workflow is as follows.


• Prepare the design data: Pre-register the design coordinate data for the piles to be installed in the app or cloud. Uploading CAD drawings or a coordinate list (CSV, etc.) completes the data preparation for on-site surveying.

• Set up the device: On site, attach an RTK-capable high-precision GNSS receiver (e.g., a compact LRTK device) to the smartphone and launch the guidance app. The receiver acquires correction information to improve the smartphone’s positioning to centimeter-level accuracy (cm level accuracy (half-inch accuracy)), and positioning readiness is achieved in several tens of seconds.

• Navigate to the pile position: Select the target pile number or point in the app and the navigation feature will display on the screen. Follow the arrow-like indicators or numeric guidance like a compass and you will approach the target position without getting lost. For example, follow a display such as "5 m (16.4 ft) ahead to the northeast" and as you get closer the guidance switches to finer instructions like "remaining 20 cm (7.9 in)" and "remaining 5 cm (2.0 in)". With slight movements you can arrive exactly at the correct spot.

• Confirm position and mark: When you reach the instructed point, compare the real scene on the smartphone screen with the AR pile marker to confirm. If the virtual pile marker and the ground align without offset, it proves you are at the design-correct position. Mark the point with spray paint or chalk, or signal the heavy equipment operator to install the pile using a pile driver. Even on large sites, the AR marker serves as a landmark so you won’t lose sight of your intended point.

• Save construction records: After driving the pile, take on-site photos with the smartphone to keep records. The photos are automatically tagged with the positioning coordinate data and uploaded to the cloud immediately. Later, from the office PC you can check at a glance how many centimeters each pile was off from the design values, which helps in creating as-built diagrams and quality reports.


As described above, by using an AR guidance system that combines a smartphone and high-precision GNSS, even those without surveying expertise can obtain precise pile positions simply by following on-screen guidance. Imagine that what used to require two to three people pulling measuring tapes can now be completed as a one-person operation with a smartphone—the impact on efficiency is readily apparent.


Benefits of pile-driving DX achieved with AR

Introducing smartphone AR pile-driving position guidance on site delivers major effects in accuracy, efficiency, safety, and more. The main benefits are summarized below.


• Improved accuracy: Centimeter-level guidance (cm level accuracy (half-inch accuracy)) virtually eliminates pile position deviations. Because piles can always be installed at the exact design positions, rework or critical construction errors due to pile center offsets are prevented. This technology is powerful for projects requiring stringent accuracy management such as high-rise buildings and bridges, removing concerns about quality.

• Dramatic improvement in work efficiency: The time required for surveying and positioning is greatly reduced. For example, there are empirical cases where replacing conventional total station methods requiring several people with AR navigation shortened the work time to about 1/6 of the conventional time. Because each person can move according to digital guidance, tasks that used to take multiple people can be carried out in parallel by the minimum number of personnel.

• Labor saving and skills equalization: The number of surveyors and assistants can be reduced, lowering labor costs and addressing labor shortages. The system can be operated by non-experts, so even sites staffed only by younger workers or teams with varying experience levels can achieve stable results. Since the equipment centers on smartphones and compact devices, initial introduction costs are relatively low and one device per person is realistic. The ability to operate the site without relying on specialized technicians contributes to overall work standardization.

• Improved safety: There is no need for people to perform surveying and layout marking in dangerous locations. Thanks to AR displays, target positions can be confirmed from a safe distance. Reducing work at heights, on steep slopes, or in areas where heavy machinery is operating lowers the risk of falls and collisions with equipment. Workers’ physical burden is also reduced, contributing to safety-first site management.

• Enhanced quality control and record accuracy: Digital positioning data and photo records are accumulated in the cloud, making post-construction as-built inspections and reporting tasks much easier. Because a history remains of which pile was installed at which coordinates, there is no need to remeasure or compare with drawings later. This objective evidence can be presented in reports to clients or supervisory authorities, enabling highly reliable quality verification.

• Expansion to multiple uses: AR-based position guidance and visualization can be applied beyond pile-driving. For example, foundation layout marking can be streamlined using the same method, or positions of underground utilities (pipes and cables) can be pre-scanned and registered so that invisible obstacles are visualized during excavation via AR display. Also, 3D design models can be overlaid on the site scenery to intuitively share the finished image between clients and contractors. In short, wherever it is necessary to "indicate accurate positions on site," smartphone AR can be a powerful solution. The adoption of these digital technologies aligns with the Ministry of Land, Infrastructure, Transport and Tourism’s initiative *i-Construction* (aimed at improving site productivity) and serves as a tailwind for industry-wide DX (digital transformation).


What is simple surveying using LRTK

An all-in-one site DX tool developed to easily realize the RTK + AR pile-driving guidance described above is LRTK. LRTK consists of a compact RTK-GNSS receiver that can be attached to a smartphone, a dedicated app, and cloud services. Simply attach the palm-sized receiver to a smartphone (e.g., an iPhone or Android device) and you can achieve real-time centimeter-level high-precision positioning (cm level accuracy (half-inch accuracy)), and immediately perform AR display navigation and marking based on that position information. Unlike the previous segmented workflow of "surveying → layout marking → construction records → as-built inspection," LRTK allows you to perform the entire process with a single smartphone.


No advanced operation or specialist knowledge is required; even those without surveying experience can derive accurate pile positions by following the smartphone screen instructions. It is truly an innovative tool that makes "pile-position setting anyone can do" a reality. By leveraging simple surveying with LRTK, tasks that previously required many people and long hours are dramatically streamlined, and accuracy management is greatly improved. As a reliable ally that powerfully supports on-site digitization, LRTK is sure to attract increasing attention.


Moreover, LRTK offers not only pile-driving guidance but also smartphone-based measurement and point-cloud scanning functions. For example, by using the LiDAR scanner or cameras found in the latest iPhones and tablets and walking around the site to capture data, you can acquire high-precision 3D point cloud data. The acquired point clouds, which include absolute coordinates, are uploaded to the cloud and can be overlaid with 3D design models to color-code differences between as-built and design, supporting quality management. With point-cloud scans and photogrammetry data centrally managed and shared in the cloud, information linkage between the site and office becomes smoother, streamlining report creation and planning for additional work.


Thus, by introducing LRTK, you can perform positioning, guidance, measurement, and recording with high precision using a single smartphone, dramatically improving site productivity. If you are interested, please visit the [LRTK official site](https://www.lrtk.lefixea.com) for detailed information and case studies.


Frequently asked questions

Q. What equipment and environment are required to use AR pile-driving guidance? A. Basically, you need a smartphone (or tablet) with the AR guidance app installed and a centimeter-class high-precision GNSS receiver (RTK-capable). In addition, a communications environment (internet connection) to receive correction information for high-precision positioning and an outdoor environment with sufficient satellite reception are prerequisites. With these in place, you can smoothly use AR navigation on site.


Q. Can accurate pile-position setting be done with only the smartphone’s built-in GPS? A. Unfortunately, the accuracy of typical smartphone built-in GPS (standalone positioning) has errors on the order of meters and is not suitable for precise pile position identification. Achieving centimeter-level accuracy requires RTK-GNSS corrections, so dedicated high-precision GNSS devices and correction services (base station information delivered over the network or augmentation signals from satellites) are necessary. In other words, the true value of AR guidance can be realized only by using a solution like LRTK, not with the smartphone alone.


Q. Can people without surveying experience operate it? A. Yes, it can be used without problems. AR pile-guidance apps are designed with intuitive user interfaces, making them easy to operate even without specialized surveying knowledge. You only need to move and confirm according to the on-screen guidance, so there is no need for difficult calculations or advanced settings. Once you learn the basic operations, even non-veterans can achieve high-precision position setting on site. In fact, some sites have begun to perform position setting, which previously required surveyors, using only younger staff.


Q. Do weather or radio conditions affect the work? A. Generally, the system can be used outdoors regardless of weather. Extreme weather such as heavy rain or snow does not directly cause major impacts on positioning accuracy (although satellite acquisition may take longer). However, high-precision GNSS positioning requires an open sky, so locations surrounded by tall buildings, tunnels, or indoor environments where satellite signals cannot reach are not usable. If network-based RTK corrections are used, you also need to be within a communication coverage area. In remote mountainous sites where internet connectivity is unstable, augmentation signals that can be used offline, such as the quasi-zenith satellite Michibiki (CLAS), may be utilized. Also, although AR markers themselves can be displayed on screen at night, a certain level of lighting is required because the camera must capture the real scene.


Q. Can this technology be used for applications other than pile-driving? A. Yes, the range of applications extends beyond pile-driving. On building and civil engineering sites, layout marking for foundations can be performed with AR, or the positions for installing steel frames and equipment can be projected on site to verify installation accuracy. You can also register information about underground pipes and cables in advance and visualize them with AR before excavation to reduce excavation risks as a safety management application. Furthermore, overlaying 3D design model data onto actual site footage to share the construction image among stakeholders—so-called AR construction management—is another area of application. In short, wherever it is necessary to "indicate accurate positions on site," smartphone × AR visual guidance demonstrates powerful utility.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.