• What is AR as-built inspection

• Benefits of introducing AR

• Case studies of AR as-built inspection

• Issues and countermeasures to consider when introducing AR

• AR as-built inspection realized by simple surveying with LRTK

• Frequently Asked Questions


What is AR as-built inspection

As-built inspection is a quality control process in civil engineering and construction that verifies whether completed structures and terrain have been constructed according to the design drawings. Traditionally, total stations (TS), levels, and other surveying instruments have been used to measure heights, thicknesses, and other points on site, and then the measurement results were returned to the office to be compared with the design drawings for pass/fail judgment. However, with this approach there is often a time lag between site measurement and the discovery of problems, which can lead to unnecessary work progressing during that interval and cause rework. Accurate inspections also require skilled survey technicians, and many tasks are performed by two-person teams, so with labor shortages and an aging workforce there have been concerns about operational inefficiencies.


A new solution attracting attention to solve these problems is AR (Augmented Reality) technology. AR overlays digital information (3D models, drawings, etc.) onto real-world images, and thanks to improvements in smartphone and tablet performance, it can now be easily used on site without special equipment. In fact, as the industry-wide DX (digital transformation) is being promoted through initiatives such as the Ministry of Land, Infrastructure, Transport and Tourism–led [I-Construction](https://www.mlit.go.jp/tec/i-construction/), AR as-built inspection is increasingly expected to be a powerful means of simultaneously improving on-site quality and efficiency.


Benefits of introducing AR

Introducing AR technology into as-built inspections provides many on-site benefits not available with conventional methods. Here are some of the main effects.


• Immediate detection of issues: Because construction defects or deviations from the design can be identified on the spot, corrective measures can be taken immediately. For example, in paving works, if areas with insufficient thickness are color-coded in the AR view, additional paving or corrective milling can be performed immediately after construction. Being able to run PDCA on site minimizes rework and prevents leaving quality defects unaddressed.

• Reduced work time and labor savings: Since the as-built condition of a wide area can be visualized at once, inspections that used to take a full day can be greatly accelerated. Tasks that involved measuring point by point with paper drawings and surveying instruments can be replaced by intuitive checks simply by holding up a tablet, which can significantly shorten inspection time. Because a single person can perform measurements and records, staffing logistics are simplified and labor is reduced.

• Reduced reliance on skilled technicians: AR app operations are simple, and anyone can complete inspection tasks by following on-screen prompts. This means on-site personnel can evaluate as-built conditions without relying on specialized surveyors or veteran technicians. Being easy to handle without special skills prevents personalization of knowledge and allows less experienced staff to participate in measurement and checks.

• Cost reduction: AR using smartphones or tablets eliminates the need to purchase expensive TS or GNSS surveying equipment. Typical surveying instruments can require initial investments of several million yen, but recently it has become possible to build centimeter-level positioning environments at low cost by combining commonly owned mobile devices with relatively inexpensive GNSS receivers. Maintenance and transportation costs for equipment can also be reduced.

• Improved measurement accuracy and reliability: AR reduces measurement errors and recording mistakes caused by manual processes. There is no need to transcribe numbers taken on-site, and because measurement data can be compared digitally, human error can be eliminated. Moreover, when combined with high-precision positioning such as RTK-GNSS, measurement results can consistently achieve centimeter-level accuracy (half-inch accuracy), based on public coordinate systems, enabling inspections with higher reliability than before.

• Streamlined recordkeeping and reporting: With AR, as-built inspection results can be saved as intuitive visual materials. For example, screenshots of AR screens or heatmap images showing color-coded differences from the design can be attached to reports, making explanations easier to understand than lists of numbers alone. In fact, Ministry of Land, Infrastructure, Transport and Tourism field demonstrations have confirmed that AR can simplify as-built documentation (inspection paperwork). Because all data are digitally stored, follow-up verification is easier and the burden of reporting is reduced.

• Improved consensus building and communication: The visualization provided by AR helps with consensus building between contractors and clients. Sharing completion images and inspection results via a tablet enables everyone to intuitively understand on-site conditions. For example, if deviations from the design are shown in AR, the client can immediately grasp the as-built condition and more quickly agree on the need for corrective action. This kind of visual communication reduces unnecessary disputes and communication gaps, improving overall on-site coordination.


Case studies of AR as-built inspection

In actual field applications, AR as-built inspection is beginning to be used in a variety of ways. Here are representative use cases and the benefits that field teams reported experiencing.


• Immediate correction of rebar placement errors: By using AR for rebar placement inspections before concrete casting, you can instantly confirm whether the rebar is placed according to the drawings. For instance, when checking for misalignment of column or beam reinforcement positions, displaying the rebar design in AR on the spot and comparing counts and spacing eliminates the need for measuring with a tape measure. On one site, this AR verification reportedly allowed rebar placement errors to be detected early, reducing rework and material loss. Because even small misalignments can be detected, AR helps maintain quality while progressing construction.

• Zero rework in paving thickness and gradient inspections: In road paving, combining AR with smartphone LiDAR point cloud measurements enables planar inspections over wide areas. Scanning the pavement immediately after paving to obtain high-density point cloud data and overlaying it on the design model instantly generates a color-coded heatmap of elevation differences. This allows quick determination at a glance whether pavement thickness meets standards and ensures no unevenness or insufficient thickness is overlooked. In one project, the as-built heatmap enabled repairs of abnormal areas the same day, achieving zero rework later, streamlining inspections compared with traditional sampling tests that took days and improving quality control.

• AR visualization of buried pipes for future management peace of mind: AR can “see through” to confirm pipes and cables buried underground that are no longer directly visible after construction. For example, in sewer construction, if pipe locations and depths are 3D-scanned and saved to the cloud before backfilling, anyone can later hold up a smartphone and understand the underground routing and depth of pipes even after they have been buried. This can eliminate immediate post-installation marking tasks and allow safe excavation in future maintenance by accurately avoiding buried assets with AR. The ability to visualize what is not visible is a major advantage of AR as-built inspection.

• Using point cloud comparison and AR for slope works: For steep-slope slope protection works and large-scale earthworks, combining 3D scan as-built data with AR display enables both safety and efficient construction management. If a slope is scanned before construction to obtain baseline data and scanned again after construction for comparison, the increase or decrease in collapsed material or fill can be computed instantly. In one case, earthwork quantity calculations that used to take days were completed in minutes on site, aiding rapid as-built evaluation and restoration planning. Overlaying the acquired slope point cloud model onto the actual scenery with AR allows all workers to intuitively share areas at risk of collapse or locations needing reinforcement. Wide-area and high-elevation as-built management and disaster inspections are becoming safer and more reliable thanks to AR technology.


Issues and countermeasures to consider when introducing AR

While AR as-built inspection offers many benefits, there are several issues to be aware of during introduction and operation. Here are the main issues to consider and their countermeasures when using AR on site.


• Concerns about measurement accuracy: There are often questions like “Can AR really measure accurately?” Indeed, if the on-app model and the real object are misaligned, it can lead to incorrect judgments, so accuracy management is important. As a countermeasure, combining GNSS-based RTK corrections with calibration using known points can minimize the mismatch between the digital model and real space. Linking high-precision GNSS rovers with AR allows design data to be overlaid exactly on the as-built in front of you. With proper operation, it has been demonstrated that checks can be made with accuracy comparable to conventional surveying—errors within a few centimeters (within a few inches) in both horizontal and vertical dimensions. In the initial phase of introduction, it is advisable to verify errors at key points by using conventional methods in parallel to ensure accuracy.

• Effort required to prepare data: Using AR requires comparison 3D models or point cloud data, and preparing these can be time-consuming. Although the creation of 3D design data through BIM/CIM is progressing, in small-scale projects 3D data may still be absent. In such cases, LiDAR scanning of the site to obtain point clouds can provide an ad hoc as-built model. Even projects with only 2D drawings may be able to visualize major lines and surfaces by creating simple 3D models within the app. The ministry’s guidelines also recommend moving to as-built management using 3D measurement technologies, so necessary digital data should become easier to obtain. Once data is prepared, it can be used for later process management and long-term maintenance, so investing effort in digitization at the start is important.

• Devices and site environment: Physical challenges arise when using smart devices outdoors. For example, screens can be hard to see in direct midsummer sunlight, and batteries can drain quickly. Countermeasures include using tablet shades to create shade and carrying spare batteries. Use waterproof cases in rainy conditions and clean camera and sensor areas frequently in dusty sites. If holding a tablet for long periods is difficult, using neck straps or shoulder mounts helps. By adopting accessories and operational methods suited to the site environment, device performance can be fully leveraged and AR effectiveness maximized.

• Psychological resistance from site staff: Some staff resist new technologies, especially veterans who may feel “the traditional way is safer.” The best remedy is to let them experience AR’s effects on site. For example, sharing concrete success stories—inspections that used to take half a day are finished in 30 minutes with AR, or a previously overlooked rebar error is detected on the spot—can change attitudes dramatically. Tools like LRTK that enable “anyone to easily survey alone” can also reduce resistance by showing that two-person surveying tasks can be completed by one person. Modern AR-enabled apps have Japanese interfaces and support systems, and having someone to consult when needed helps promote adoption. ICT adoption on site is an inevitable trend, so it is important to support gradual uptake so everyone on site can learn to use the tools at their own pace.


AR as-built inspection realized by simple surveying with LRTK

One solution gaining attention for realizing AR as-built inspection in a simple yet high-precision manner is “LRTK.” LRTK enables centimeter-level positioning using the RTK method by attaching a compact high-precision GNSS receiver (rover) to a smartphone. Surveying tasks that previously required specialized equipment and skilled operators can be completed by one person using LRTK. It supports correction signals from Japan’s quasi-zenith satellite system “Michibiki” (CLAS) and network RTK, and it can maintain stable high accuracy even in mountainous areas outside of communication coverage. This means that even on sites without veteran surveyors, a single smartphone can handle everything from control point surveying to as-built inspection—one of LRTK’s major strengths.


Furthermore, LRTK integrates seamlessly with AR functionality. By using the high-precision GNSS position information, 2D/3D design data can be overlaid precisely on site, eliminating tedious alignment work and concerns about model drift. For example, simply walking the site with a tablet can accurately indicate virtual stake positions from the design on the actual ground, making target coordinates visible at a glance even from a distance. It is also possible to automatically overlay acquired as-built point cloud data with design models on the LRTK cloud and analyze differences, so you can immediately check on site whether construction is proceeding as planned.


LRTK also offers a cloud platform, so data measured and scanned on site are immediately shared to the cloud. team members in the office can view on their PCs the site’s 3D point clouds and measurement point information in real time, allowing all stakeholders to verify inspection results with the latest data. You can measure distances, areas, and volumes on the cloud, and link photos with position information for one-click listing. This enables integrated collaboration between the site and office, dramatically improving the efficiency of as-built inspections.


LRTK also includes many tools beyond as-built management, such as a “coordinate navigation” feature that guides a single person to stake positions, a function to calculate fill volumes from point clouds acquired by LiDAR scanners, and a feature for sharing high-precision geotagged photos. It is designed so that surveying, as-built inspection, record creation, and as-built reporting—processes that traditionally required multiple instruments and steps—can be completed with a single iPhone. Data acquired on site can also be used and delivered in formats compliant with the Ministry of Land, Infrastructure, Transport and Tourism’s as-built management guidelines. Many construction companies have already introduced LRTK and begun to achieve both labor savings in surveying and inspection and improvements in quality.


If a system of simple surveying plus AR using smartphones allows anyone to easily perform high-precision as-built checks, even sites suffering from labor shortages can realize reduced work time, prevention of human error, and improved communication through a “one device per person” smart surveying approach. The adoption of these cutting-edge technologies will strongly promote DX on construction sites and has the potential to fundamentally change as-built management practices. To succeed with AR as-built inspection, it is important to skillfully incorporate such advanced tools and link them to overall productivity improvements on site. We encourage you to embrace the latest technologies and experience the true value of AR as-built inspections at your sites.


Frequently Asked Questions

Q: What is needed to start AR as-built inspection? A: Basically, you need a smartphone or tablet capable of AR display, a GNSS receiver to improve measurement accuracy, and an AR surveying app that supports them. Modern iPhones and Android tablets with high-performance cameras and LiDAR sensors are suitable for AR use. When accuracy of several centimeters (several inches) is required, a small Bluetooth GNSS rover is used in combination to perform RTK positioning (devices like LRTK that can be mounted on a smartphone are available). Also prepare the design-side 3D model data or point cloud data for comparison. With these components set up, you can immediately try AR as-built inspection on site.


Q: Can the accuracy of AR-based as-built inspection be trusted? A: Yes—if operated properly, high accuracy can be ensured. Systems that use RTK-GNSS position correction can achieve positioning errors on the order of a few centimeters (a few inches) in both horizontal and vertical directions, which is within the accuracy typically required for as-built inspection. When confirming differences in AR, heatmap displays allow you to identify quantitatively “which points are how many centimeters high/low.” The important points are to align AR data with known site or control points beforehand and to verify with conventional methods at key points as needed. By doing so, you can trust AR inspection results with sufficient justification.


Q: Can AR be used on sites without 3D design models? A: Yes, with some creativity. For example, there are apps that import 2D drawing data (DXF, etc.) into AR and visualize major lines and shapes on site. For relatively simple completed shapes, you can mark key dimensions on site before construction and overlay them on AR-captured images as a simple method. However, AR’s true power is realized when 3D models are available. The creation of CIM models (3D design data) is increasing, especially for public works, so consider requesting 3D data from the client or creating a simple model in-house. If you only need to compare measured point cloud as-built data with the design, you can detect differences using point cloud processing software without insisting on AR display. The goal is to allow intuitive on-site confirmation, so choose the best method depending on whether a model is available.


Q: Can AR inspection results be used as official inspection records? A: At present, using AR as the sole basis for official operations is just beginning, but it is gradually being accepted. The Ministry of Land, Infrastructure, Transport and Tourism conducted field demonstrations in FY2023 and confirmed that AR technology can simplify as-built documentation (inspection reports). However, in many cases conventional records (drawings and photo logs) are still required, so AR visualization data are used as supplementary materials to aid inspectors’ understanding. For example, showing via a heatmap that “this part is ○ cm higher/lower than the design” conveys the situation more intuitively than a table of numbers. While AR data itself may be recognized as official deliverables in the future, for now it is prudent to use AR as supporting evidence and perform conventional measurements if necessary.


Q: I’m concerned whether everyone on site, including veterans, can master this technology. A: AR construction support tools are becoming more user-friendly each year, and basic operations are not difficult. Many adopting companies report that staff from young to veteran can use them after short training. If concerns remain, start by having experienced staff demonstrate operations while others observe. People tend to adopt new tools when they see clear benefits with their own eyes. If staff experience that “it’s really faster” or “it’s easy to understand,” resistance will lessen. Modern AR apps offer Japanese interfaces and robust support, making it easy to get help when needed. ICT use on site will continue to expand, so provide gradual, supportive training so everyone can become proficient.


Q: Are dedicated AR glasses (goggles) necessary? A: Currently, smartphones and tablets are sufficient for most cases. AR-capable smart glasses are emerging but are very expensive and often difficult to use with hard hats, creating barriers for site adoption. Smartphones and tablets, on the other hand, can be easily carried in dustproof/waterproof cases and operated by touch. Device resolution and processing power continue to improve, and mobile devices are fully usable in terms of visibility and responsiveness for on-site work. If glasses become lightweight and affordable in the future, their usage will expand, but for now smartphone-based AR is the most practical and cost-effective option. We recommend starting AR as-built inspection with familiar smartphones and tablets and considering future device expansion as needed.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.