AR Civil Engineering Implementation Guide: Key Points for Bringing Augmented Reality to the Field

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Table of Contents

• What AR civil engineering is

• Benefits of introducing AR to civil engineering

• Key points for implementing AR in civil engineering

• Simple AR surveying starting with LRTK

• FAQ


What AR civil engineering is

AR (augmented reality for civil engineering) is a technology that overlays digital information onto real-world imagery. By viewing a site through a smartphone or tablet camera and overlaying 3D design models and construction information on that screen, you can intuitively align the field with the plans. In the civil engineering industry, integrating AR technology into construction sites is being promoted as a way to visualize work that previously relied on plan drawings and experience, enabling greater efficiency and improved accuracy.


This “AR civil engineering” is attracting attention as a solution to the construction industry’s serious problems such as labor shortages and the need to boost productivity. In fact, chronic labor shortages at construction sites in Japan are a major issue, and some estimates suggest that by around 2025 roughly 900,000 workers could be missing. Traditional construction relying only on paper or 2D drawings also makes it difficult for stakeholders to share a completed-image, and many say “you only find out after it’s finished.” As a result, mismatched understandings lead to rework and mistakes, which reduce productivity. Moreover, the so-called “2024 problem,” with labor-related workstyle reform laws for construction coming into full enforcement in 2024, is imminent, increasing the demand for digital technologies to manage sites efficiently with limited personnel.


Introducing AR technology at sites has the potential to address these problems. For example, simply pointing a tablet can display the future completed form on the spot, allowing everyone from clients to workers to share the same vision of the outcome. Complex drawings overlaid as 3D models on site enable less experienced staff to intuitively understand the work. AR use is also expected as part of the Ministry of Land, Infrastructure, Transport and Tourism’s promotion of “construction DX (digital transformation),” aligning with the industry-wide trend of ICT utilization. The ministry’s i-Construction initiatives also encourage the use of 3D models and AR technology, and companies are beginning efforts as part of site DX.


Benefits of introducing AR to civil engineering

What concrete benefits can be gained by actually introducing AR to civil engineering sites? Here are the main advantages.


• Real-time visualization of construction progress: By overlaying design models and schedule information onto the current site with AR, construction progress can be understood at a glance. For example, displaying an AR model of the expected completed structure on an in-progress structure allows immediate on-site confirmation of deviations from the plan, enabling rapid decisions on schedule revisions and resource allocation.

• Prevention of construction errors and quality improvement: By directly overlaying 3D design data onto the actual site and comparing them, surveying deviations and construction errors can be detected early. Differences in rebar spacing or dimensional errors in structures can be checked with AR during construction, reducing “discovering mistakes after building” and cutting rework and material waste. As a result, ensuring as-built quality becomes easier and inspections proceed more smoothly. For example, a major general contractor combined BIM data and AR to develop an automated inspection system for concrete placement as-built, achieving major speedups and accuracy improvements in inspection tasks.

• Facilitating consensus building and communication: Because everyone can share the real scene and the completed image through a tablet, communication between clients and contractors improves dramatically. Parts that were hard to convey with drawings or words can be understood intuitively via AR, narrowing recognition gaps. Remote stakeholders can also join online meetings using AR models, making it possible to grasp and discuss site conditions without visiting in person. Remote construction management trials are also beginning, where veteran technicians overlay arrows and annotations on AR footage remotely to support less experienced workers. For pre-construction explanations to nearby residents, showing a life-size model on site via AR makes it easier to gain understanding and cooperation.

• Contribution to safety management: AR use is also promising for safety measures. For instance, if workers use AR glasses or tablets, hazardous areas can be visualized with virtual fences or lines while they work. Trials are underway to display excavation no-go zones on heavy equipment operators’ view, helping reduce near-miss incidents caused by human error. A future in which construction managers can simultaneously check safety conditions while viewing the whole site in AR is within reach.

• Efficiency in surveying and as-built management: Surveying work that once required total stations and multiple staff can increasingly be done single-handedly and easily with one AR-capable smartphone. If a smartphone’s camera and LiDAR scan the site and the obtained point cloud data can be overlapped and confirmed with the design model on the spot, deviations in as-built can be identified immediately. Especially when combined with high-precision GNSS (RTK) corrections, the captured point clouds and measurements can be immediately georeferenced, allowing design comparisons and quantity calculations without post-processing. In other words, instead of “measure and be done,” workflows are emerging where measured data are used on-site.


Thus, introducing AR offers benefits across civil engineering sites—from visualizing progress to ensuring quality, improving communication, enhancing safety, and streamlining surveying.


Key points for implementing AR in civil engineering

When introducing AR to the field, there are several key points to keep in mind. To effectively embed this new technology, consider the following.


• Clarify the purpose and goals of introduction First, make clear “why” you are introducing AR. Is the goal consensus building through visualization, efficiency in surveying, or reduction of construction errors? Define specific quantitative and qualitative goals that follow from the purpose. Clear objectives make it easier to obtain internal understanding and budget approval, and to set KPIs for post-introduction effect verification. For example, set concrete goals like “reduce rework in as-built inspections to zero” or “halve surveying time.”

• Prepare a 3D data environment AR requires underlying digital information—especially 3D design data and terrain models. If drawings are still mainly 2D, take this opportunity to consider building a foundation for using 3D models such as BIM/CIM. If you prepare 3D data from the design stage, it can be used for AR review before construction and for comparing current conditions during construction. It is also important to unify the coordinate systems of design data and the field. Aligning survey coordinates (control points) with the model coordinates minimizes AR display offsets. As an enabling technology, set up cloud-based management and sharing of drawings and point cloud data to smooth data linkage between site and office.

• Start with small pilot deployments Rather than deploying AR across all sites and phases at once, begin with a pilot case—a small site or limited use—to test. For example, try AR on a specific surveying task or a single work section to evaluate effectiveness and issues. Starting small helps you gauge on-site staff reactions and technical hurdles, and makes corrective action easier. Share successful cases internally and gradually expand application scope. Rolling out gradually by site scale and project characteristics controls risk while building internal understanding and know-how.

• Choose AR tools that are easy to operate Select tools that are simple and intuitive to operate on site. While there are advanced AR glasses and specialized devices, it’s prudent to start with AR apps that run on familiar smartphones and tablets. Recently, mobile AR apps developed for construction have appeared that can display 3D models on site by following on-screen prompts. Smartphones are portable and facilitate movement between sites. When selecting tools, check usability in field conditions—e.g., readability under outdoor sunlight and operability while wearing a helmet. Also select a trustworthy solution including support structure and update policies.

• Ensure accurate alignment methods High-precision alignment is essential to overlay 3D models exactly on the real object. Smartphone-only GPS has errors of several meters, which is insufficient for aligning structures. As countermeasures, calibration using markers or control points (placing markers at fixed locations and aligning them in AR) and utilizing high-precision GNSS (RTK) are effective. With RTK-enabled systems, model placement errors can be reduced to the order of a few centimeters (a few in), allowing AR displays that match survey drawings to within fine tolerances. By securing alignment accuracy, you can avoid situations where “it looked right but was actually off” and confidently use AR for construction management.

• Provide training for field staff and build an operational system To embed new digital tools on site, training and support are indispensable. Conduct hands-on training when introducing AR, carefully explaining app operation and precautions to workers. Initially, it is ideal for younger digital leads or technicians to support on-site use and gradually expand usage to others. Also define roles and operational rules for AR use on site—e.g., who prepares and updates 3D data, where to store and share captured point clouds and photos. Establish an operational system and improve manuals based on field feedback to create a user-friendly workflow.

• Consider safety and establish rules Pay full attention to site safety when using AR. Establish safety rules for use so that focusing on a tablet screen does not prevent awareness of nearby hazards. For example, publicize guidelines such as “do not approach for AR checks while heavy equipment is operating” and “do not view AR screens while walking in unstable footing.” When using AR glasses, instruct users not to neglect surrounding checks due to a narrowed field of view. At the same time, AR itself can support safety management—e.g., displaying hazardous areas in AR or marking buried utilities with AR markers—to balance safety and productivity. It is important to use AR under a safety-first mindset.


Simple AR surveying starting with LRTK

There is a solution that can largely solve common challenges in AR civil engineering adoption, such as the “hassle of alignment” and “difficulty of surveying.” It is LRTK, provided by Reflexia, a startup originating from Tokyo Institute of Technology. LRTK is a system consisting of a compact high-precision GPS receiver that attaches to a smartphone (such as an iPhone) and a dedicated app, integrating RTK positioning and AR functions. Using the LRTK device and smartphone app on site allows you to display a 3D design model directly over the real location in AR without complicated coordinate alignment work.


Specifically, LRTK determines the smartphone’s position with centimeter-level position accuracy (inch-level position accuracy) and, by scanning the site with the phone’s built-in LiDAR scanner or camera, assigns accurate coordinates to all captured point cloud data. This enables anyone to perform one-handed 3D surveying on site, and to immediately compare that data with the design model or measure distances, areas, and volumes. Tasks that previously required skilled survey technicians and time can be completed quickly with LRTK, and results can be checked on the spot, greatly speeding up the PDCA cycle of construction management. Furthermore, point cloud data and records captured on site can be instantly shared via the LRTK cloud, allowing offices to confirm 3D site conditions remotely and issue swift instructions.


LRTK is truly a tool that lowers the barrier to AR adoption on site. Because a smartphone and a compact receiver enable a high-precision AR experience, small-to-medium sites and small teams can start using it easily. If you are considering introducing AR civil engineering, beginning with simple surveying using LRTK will let you experience its effects and potential.


FAQ

• Q: What equipment is needed to introduce AR? A: Basically, you can start with a smartphone or tablet that supports AR display. Modern smartphones come with capable cameras and sensors, and installing an AR app is often enough to overlay 3D models on site. If you want higher accuracy, using a high-precision GNSS receiver (RTK-capable device) that attaches to a phone enables AR with minimal position drift. There are dedicated AR glasses, but starting with familiar mobile devices is the most practical approach.

• Q: Can workers who are not good with IT use it? A: Yes. With proper training and by choosing user-friendly tools, even veteran workers or those uncomfortable with IT can make use of AR. AR is an intuitive “what you see is what you get” technology, so once basic operations are learned, older site workers can check the completed image with their own eyes and more easily understand instructions. In the early stages, assign support staff to operate alongside workers on site so they can become comfortable. Once they experience the benefits, many will use it proactively.

• Q: Is AR display accuracy reliable enough? A: It depends on the use case, but with appropriate setup and equipment you can achieve sufficiently practical accuracy. Standard smartphone AR can typically achieve accuracies on the order of tens of centimeters (tens of inches), but for surveying or precise structure alignment you can push accuracy to an error of a few centimeters (a few in) by using RTK-GNSS or combining markers. In practice, RTK-capable systems like LRTK can project 3D models onto the site with only a few centimeters’ error, enabling their use in as-built management. Thus, with the right measures, AR display accuracy can be robust enough for field construction.

• Q: How much does introduction cost? A: It varies with scale and chosen system, but recently there are more cases where you can start at a relatively low cost. If you use existing smartphones or tablets within the company and only acquire necessary apps and receivers, costs can be lower than purchasing large survey instruments. Systems that leverage smartphones, like LRTK, offer affordable investment for high-precision positioning and AR functionality compared to dedicated equipment. Considering reductions in rework and labor costs due to AR, returns can exceed the investment. Also look into national or municipal ICT adoption support (subsidies, etc.). It is wise to introduce on a small scale first and expand investment step by step based on observed effects.

• Q: Will AR technology continue to advance? A: Yes. AR will steadily evolve in combination with other advanced technologies. For example, using high-precision RTK positioning to control construction machinery and displaying virtual guidelines or excavation ranges on AR to assist heavy equipment operation points toward applications in robotic construction. Remote support, where remote veteran technicians give real-time instructions via the video feed from AR devices worn by field workers, is also becoming feasible. Combining continuous 3D scanning by drones or pedestrians with AR could enable real-time as-built verification during construction and immediate feedback. In this way, AR + RTK technology will become more than a gadget and is likely to become an indispensable new norm in civil construction in the near future.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.