On-site Voices: How Introducing AR in Civil Engineering Changed the Worksite
By LRTK Team (Lefixea Inc.)
Table of Contents
• Introduction
• On-site Voice 1: Smartphone AR surveying dramatically improved stake-setting work
• On-site Voice 2: AR made sharing the completed-image smoother
• On-site Voice 3: Visualizing buried utilities with AR improved safety
• On-site Voice 4: AR supports training of newcomers and streamlines transfer of skilled techniques
• Conclusion
• FAQ
Introduction
In recent years, the construction and civil engineering industries have been undergoing major changes in how worksites operate due to the promotion of ICT and DX (digital transformation). However, many tasks on site—such as surveying, as-built (post-construction) confirmation, and comparing drawings—still rely heavily on manual work, consuming significant time and effort. Labor shortages and the aging of skilled technicians are also serious issues, increasing the need to complete work efficiently with limited personnel. Furthermore, from 2024 the upper limits on overtime work are being applied to the construction industry (the so-called "2024 problem"), making it imperative to reconsider traditional long-hours approaches.
As a new solution to these challenges, the introduction of AR (augmented reality) technology to the worksite is attracting attention. AR is a technology that overlays CG models or textual information onto real-world images via smartphones, tablets, or dedicated goggles. This makes it possible to directly "visualize" and share information in the actual site space that was previously dependent on drawings or craftsmen’s intuition. Recently, user-friendly AR solutions using smartphones and tablets have been emerging, raising expectations because anyone on site can intuitively use them.
If you combine RTK positioning—using a smartphone with a high-precision GNSS (Global Navigation Satellite System) receiver—with AR, you can overlay virtual models and survey points onto real space with an accuracy of several centimeters (cm-level accuracy (half-inch accuracy)). A smartphone literally becomes an "all-purpose surveying instrument," enabling the digitization-driven efficiency and labor-saving of tasks that previously relied on experienced personnel. In practice, introducing AR technology to civil engineering sites can be expected to produce significant time savings and error reduction in surveying and construction management.
This article uses fictional site case studies under the theme "How Introducing AR in Civil Engineering Changed the Worksite" to concretely show the changes AR introduction brings to the field. From improved surveying efficiency to smoother consensus-building, enhanced safety management, and personnel development, we’ll look at the effects alongside real voices from the field. Finally, we touch on "simple surveying," a new surveying style opened up by AR×RTK, and explore hints for future construction management reform.
On-site Voice 1: Smartphone AR surveying dramatically improved stake-setting work
At a tunnel road construction site, AR technology was used for setting reference stake positions under the harsh condition of steep rock slopes. Traditionally, this task required the surveying team to install stakes on site based on coordinates from drawings, involving repeatedly traversing dangerous slopes with several people and taking a long time. In addition, the ground was often too hard to temporarily place stakes, making it difficult to identify exact points.
So, site manager Tanaka tested a AR stake-setting system using a smartphone. Coordinate data for the stake positions defined in the design were pre-registered in the cloud, and when looking around the site through the smartphone camera, virtual stake markers are displayed on the screen in real time at the installation positions. By targeting those markers and marking the spot, it becomes possible to accurately mark points even where physical stakes cannot be placed.
As a result, the stake-positioning work that previously required a multiple-person operation of a surveyor and assistants can now be completed by Tanaka alone in a short time. Because he simply moves along the targets that appear on the smartphone screen one after another, he can consecutively survey stake positions over a wide area, allowing the work to proceed at overwhelmingly higher speed than before. Also, because an assistant is no longer needed in locations with poor footing, the safety risk has been reduced. "Thanks to AR, I can smoothly set stakes alone even on dangerous slopes, which is a big help," Tanaka says. Furthermore, if a site supervisor issues an urgent change in installation, new coordinates can be measured on the spot and immediately displayed via AR, so miscommunication and recognition gaps have become almost nonexistent.
On-site Voice 2: AR made sharing the completed-image smoother
At a road widening site, AR was used for briefings to local residents and for sharing construction plans within the company. Site superintendent Suzuki used a tablet camera to overlay the image of the completed road and sidewalks onto the actual scenery and showed it to stakeholders. Projecting the finished form onsite with AR made it possible to intuitively confirm, right there, how much the road width would expand and how pedestrian safety routes would change, and residents said, "I see—it’s easy to understand what it will look like when finished." Parts that were difficult to convey with drawings alone became immediately clear, and explanations and negotiations proceeded smoothly, significantly shortening the time required for consensus building.
"Being able to show the post-completion appearance with AR made explanations much easier to understand," Suzuki says, feeling the effect. At this site, the construction team also used AR to compare the design model with the actual site to check for construction errors or interferences. For example, by projecting the design position of a structure in AR, they noticed early on that a piece of equipment’s location differed from the drawings and were able to correct it immediately. Because AR allowed issues to be visualized on site instantly, rework afterward decreased and alignment of understanding among stakeholders became easier.
On-site Voice 3: Visualizing buried utilities with AR improved safety
In an urban project replacing aging buried pipes, AR-based safety measures proved powerful. The site contained a tangle of existing gas pipes and cables underground, and even when positions were marked in advance based on drawings, there was always a risk of accidentally damaging them during excavation. Safety manager Sato introduced an initiative to 3D-model the positions of buried utilities and display them in AR on site. When workers hold up a smartphone or tablet, piping and cable routes that should be invisible underground appear on the ground as colored translucent models. Because information like "a gas pipe runs 1 m (3.3 ft) below here" or "a communications cable is directly below this spot" can be seen at a glance, heavy machinery operation can be performed with greater caution.
Sato says, "Before, we had to stare at drawings and dig carefully, which was nerve-wracking, but with AR showing the location of buried utilities, the sense of security is completely different. Accidents involving accidentally cutting pipes have dropped to zero," confirming the effectiveness. On Sato’s site they also simulated heavy machinery work radii and delivery routes in AR beforehand to check for interference with other tasks or hazardous spots. This allowed them to identify issues during the layout planning stage and take safety measures before construction. The use of AR is thus a good example of a new tool enhancing on-site safety management.
On-site Voice 4: AR supports training of newcomers and streamlines transfer of skilled techniques
As a response to labor shortages, AR is beginning to be used for on-site training and skills transfer. At one construction company, new employee Yamada learned senior workers’ tasks via AR. When holding a smartphone up at key spots on the site, AR markers showing work procedures and precautions appear. For example, during rebar inspection, arrows and text overlay rebar photos saying "measure here" or "check this joint," so even beginners can instantly see what to check. Yamada says, "It’s reassuring, like having a veteran senior instructing me beside me. I understand faster than just reading a manual, and I can check at my own pace repeatedly, which helps."
At another site, they recorded skilled workers’ procedures on video and placed those videos in AR space. By allowing demonstrations of dangerous tasks or construction tips to be replayed on a smartphone on site, they are aiming to make tacit knowledge visible and use it for newcomer training. Skills that were traditionally taught orally based on a craftsman’s intuition can be preserved in a visually shareable form via AR, so it is expected to greatly contribute to more efficient skills transfer. For newcomers, AR learning materials that provide experiential learning are easier to understand and lead to faster retention. The push for on-site DX is creating an environment where even less-experienced personnel can become productive sooner.
Conclusion
We have seen the effects that AR technology brings to the worksite from various angles—productivity improvement, safety assurance, and personnel development. In the face of severe labor shortages and the need to respond to workstyle reform, AR can be a powerful tool to advance on-site DX. Tasks that previously had to rely on experience and intuition can be standardized and made more efficient with digital technology so that anyone can execute them with high precision. This will, in turn, reduce rework and improve efficiency, contributing to better workstyles and higher profit margins.
One particularly noteworthy approach is the new method of "simple surveying," which combines AR with high-precision positioning. This approach enables anyone to easily perform surveying and as-built management using familiar devices like smartphones without expensive dedicated equipment or advanced expertise. For example, by attaching a small GNSS receiver to a smartphone and launching a dedicated app, tasks that once required surveying instruments and specialist technicians can be completed by one person in a short time. Using smartphone RTK×AR solutions such as LRTK, virtual models can be overlaid on physical objects with positioning accuracy of several centimeters (cm-level accuracy (half-inch accuracy)), allowing intuitive on-site layout and verification. If work that previously required external surveyors can be completed by in-house staff, outsourcing costs and schedule coordination efforts can be reduced. The idea of "simple surveying" is likely to spread further and may become a new norm on sites.
AR technology truly holds the key to a productivity revolution in civil engineering sites. As the on-site voices presented here show, many sites are already beginning to see results. Why not consider the benefits of AR introduction at your own site?
FAQ
Q1. Do I need special equipment or advanced knowledge to introduce AR technology on site? A. No. Recently, solutions have emerged that allow AR to be used with just a smartphone, a small GNSS receiver, and a dedicated app. For example, products like LRTK let you attach a small positioning device to your smartphone and launch an app so anyone can intuitively use AR features. The operation is simple, training burden for site staff is small, and in most cases it can be learned with a short training session. There’s no need to carry heavy surveying equipment, and the convenience of handling various tasks with just a smartphone is also appealing.
Q2. Can smartphone AR displays really align positions accurately? A. Yes—if the appropriate system is used. Standard smartphone built-in GPS can have errors on the order of several meters, but by combining it with high-precision positioning technology called RTK, accuracy can be improved to the level of several centimeters (cm-level accuracy (half-inch accuracy)). For example, systems like LRTK that correct smartphone positioning with RTK-GNSS can reduce discrepancies between design positions on drawings and AR displays on site to a barely noticeable level. On actual construction sites, it has been confirmed that models displayed in AR align closely with as-built results, providing sufficient accuracy for practical use.
Q3. Is AR positioning possible in places where satellite positioning is unstable or indoors? A. High-precision AR positioning becomes difficult in environments where satellite signals are hard to receive. In areas such as streets of high-rise buildings or under trees, errors may temporarily increase or positioning may be interrupted. In such places, it is possible to perform calibration in a sightline area and then continue short-duration tasks while supplementing with the smartphone’s inertial sensors (gyros) and camera-based markers. However, in indoor or underground spaces where GNSS signals are completely blocked, accurate AR alignment with current technology is difficult. In those cases, it is necessary to rely on conventional measurements like total stations or wait for future technological advances. Note that LRTK supports Japan’s Quasi-Zenith Satellite System (Michibiki) high-precision augmentation signals, so in some environments such as mountainous areas it can position as long as satellites are visible, offering relatively broad usability.
Q4. Are there benefits to introducing AR even on small or short-term projects? A. Absolutely. In fact, small projects with limited personnel can gain the most from AR’s ability to let one person perform surveying and as-built management. For example, tasks that previously required outsourcing to surveying companies for short-term as-built measurements can be completed by in-house staff in a short time using AR surveying. Reducing outsourcing cuts costs and eliminates waiting times, so the overall schedule progresses more smoothly. Even on sites with only a few days of work, using AR for daily progress checks allows immediate capture and recording of the current state, facilitating coordination with subsequent processes. AR technology contributes to efficiency and quality improvement regardless of project scale, so small sites in particular should actively consider adoption.
Q5. Is it also possible to use AR glasses (smart glasses) instead of a smartphone? A. There are cases reporting the use of transparent AR glasses or helmet-integrated displays. However, dedicated glasses tend to be expensive, have narrow fields of view, and may require skilled operation, which makes widespread use on sites challenging. Using smartphones or tablets lets you leverage devices many people are already familiar with and keeps introduction costs relatively low. In practice, LRTK is designed as a smartphone-utilization solution that balances RTK-level precision with the convenience of smartphone AR. It is realistic to start with familiar smartphone AR and then consider other devices as needed.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.