How AR Civil Engineering Changes As-Built Management: Check Construction Deviations On the Spot

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Table of Contents

• What is AR civil engineering?

• Conventional as-built management and the risks of construction deviation

• Immediate checking of construction deviation with AR

• The necessity of high-precision positioning (RTK)

• How AR is changing as-built management on site

• Use cases and examples of AR civil engineering

• Many benefits brought by AR utilization

• On-site DX and future prospects

• What is simplified surveying with LRTK?

• FAQ


What is AR civil engineering?

In recent years, the use of AR (Augmented Reality) technology has been advancing at construction sites as well. AR civil engineering refers to the initiative of incorporating augmented reality technology into the civil engineering field to digitalize and enhance processes such as construction management, surveying, and as-built management. By overlaying digital information such as design drawings and 3D models onto real-world images via a smartphone or tablet, it becomes possible to directly verify and measure things on site. For example, if a model of the completed structure is displayed in AR on the site, you can compare the current construction state with the final form. Such intuitive AR that lets you compare design and site directly is expected to have a major effect in preventing construction mistakes and improving workflow efficiency.


AR is bringing a revolutionary change particularly to the important civil engineering process of as-built management (as-built verification). As-built management is a quality control process to confirm that the completed structures or terrain match the design dimensions and shapes. Traditionally, these checks were usually performed after construction by measuring various points with surveying instruments and comparing them with drawings. However, with AR, you can overlay the design data onto the actual object on site and check the as-built condition directly during construction. In other words, tasks that once involved tracking numbers on paper drawings can now be done on site while viewing the real object and digital information simultaneously. This allows even less-experienced engineers to intuitively spot deviations, enabling high-precision construction verification without the need for veteran intuition.


Conventional as-built management and the risks of construction deviation

First, let’s review the issues inherent in conventional as-built management methods before AR adoption. On civil engineering sites, even a slight misalignment between the finished works and the design drawings can lead to major problems in later processes. However, those small construction deviations are often hard to see during site work and tend to be discovered late. For example, even if the foundation position is off by a few centimeters, it may be hard to notice at a glance, and such mistakes may only be discovered during post-completion inspections or as-built measurements when it’s found that “the foundation position does not match the design” or “the height is insufficient.” If the error is discovered later, rework becomes necessary, resulting in extra cost burdens and schedule delays. Even skilled workers cannot perfectly guarantee construction accuracy by sight and intuition alone; invisible risks always lurk on site.


In conventional as-built management, surveyors or site supervisors would perform checks at key points using total stations (TS) or levels to reduce such risks. However, it is not realistic to measure and manage every construction step at high precision continuously, so many tasks have to rely on craftsmen’s experience and intuition. As a result, the situation of “it looks fine but is actually misaligned” could not be completely prevented.


An even more serious issue is the time lag in rework occurrence. Even if measurements are taken on site, the problem cannot be noticed until the results are brought back to the office and compared with the drawings, so discovery of mistakes is inevitably delayed. For example, if concrete thickness is insufficient, finding out only in inspections on the following day or later may mean hardening has progressed and rework becomes very troublesome. This tendency for problem detection to lag is a weakness of traditional methods. Surveying also requires advanced skills, and with chronic labor shortages and an aging workforce, it is becoming difficult to assign sufficient experienced personnel to each site. Many surveying tasks are performed by teams of two, hindering labor savings. Surveying equipment and specialized tools are also expensive, placing a heavy burden on small and medium enterprises for acquisition and maintenance. Human error due to manual work (recording mistakes or missed measurements) is unavoidable, leading to inefficiencies such as having to revisit the site later. Thus, traditional as-built management has limitations in efficiency and accuracy, and the risk of overlooking small construction deviations was always present.


Immediate checking of construction deviation with AR

A promising new solution to these issues is on-the-spot checking of construction deviation using AR technology. By using an AR app that overlays design data in real time onto the site image from a smartphone or tablet camera, small differences between the design and reality can be visualized instantly. For example, if a 3D model of the completed structure is displayed in AR on the partly constructed object, it becomes immediately clear whether the shape matches the design plan. If the construction protrudes beyond or lacks material compared to the plan, the deviation will be displayed on the screen, enabling immediate awareness. AR’s strength is replacing post-construction surveying checks with in-construction real-time verification.


There are practical reports showing that overlay checks with AR allowed early detection and correction of construction mistakes, drastically reducing rework. For example, in rebar work, overlaying the rebar layout on AR enables real-time detection of missing bars or incorrect spacing during operations. Buried pipes and cables can be displayed in AR as if seen through the ground, making it easier to grasp underground layouts that are hard to understand from drawings alone, thereby reducing the risk of excavating the wrong location. In short, AR visualization digitally complements areas that previously relied on human perception, becoming a powerful ally that checks even millimeter-level errors without oversight.


The necessity of high-precision positioning (RTK)

However, to fully utilize AR on civil engineering sites, high-precision alignment is essential. Standard smartphone GPS can have errors of several meters, which is insufficient for overlaying models at their design positions. The key technology here is RTK-GNSS (Real-Time Kinematic positioning), a centimeter-level high-precision positioning technique. RTK reduces errors to the order of several centimeters by applying correction information to satellite positioning. Especially with recent solutions like LRTK, users can achieve RTK positioning simply by attaching a compact dedicated antenna to a smartphone or tablet to receive correction data. This enables constant position accuracy within a few centimeters, allowing design models to be matched to the real world without special markers or alignment work on site.


When AR is combined with high-precision GNSS, simply pointing the camera at the site will automatically align the coordinates of the design data with those of the real space. Traditionally, complex alignment work was required—setting up equipment to local control points, marking benchmarks with stakes or chalk, etc.—but RTK-capable systems eliminate such hassle. High-precision positioning also ensures AR displays remain stable even when users walk around the site. Even over wide areas, AR models do not slide or float away from the real object, remaining fixed at accurate positions. This allows AR to maintain precision even on large civil engineering sites, making it reliable for applications such as giving instructions from a distance to heavy equipment operators. In short, centimeter-class positioning provided by RTK is the eyes and foundation of AR civil engineering, supporting precise on-site visualization.


How AR is changing as-built management on site

The combination of AR technology and high-precision positioning means the way as-built management is conducted is set to change dramatically. Traditionally, after construction completion a survey team would cut cross-sections to measure heights and prepare as-built management charts for client inspections. With AR, you can immediately confirm cross-sectional shapes and finished heights on site during construction. For example, in road embankment work, the design cross-section line can be overlaid in AR on the embankment, making it possible to visually identify in real time which areas are higher or lower than the design. Heatmap-style overlays that color-code as-built errors have appeared, making it easy to identify excesses and shortages at a glance. This enables on-site decisions such as adding compaction where insufficient or cutting back areas that are overfilled, greatly reducing later rework.


Modern smartphones and tablets are equipped with LiDAR scanners and high-performance cameras; combining these features with RTK positioning allows rapid acquisition of current 3D point cloud data and on-the-spot volume calculations and as-built difference checks. Previously, earthwork calculations and as-built evaluations took time, causing a lag between field measurement and report preparation. Now, measurement to visualization can be completed on site, enabling immediate decisions like “how many more cubic meters of fill are needed” or “to what extent was excavation excessive” right after measurement. The Ministry of Land, Infrastructure, Transport and Tourism is also promoting efforts under the productivity improvement initiative “i-Construction 2.0” to utilize 3D data acquired on site in AR for as-built management and streamline inspections. Trial projects have publicly demonstrated as-built inspections performed by overlaying design models and current conditions on a tablet AR screen, suggesting that AR could simplify the as-built management documentation traditionally submitted. Once guidelines are established, the style of confirming and sharing as-built information on tablets may become standardized, and as-built management could become routinely “visualized” in real time. A time when site supervisors, craftsmen, and clients all share the same information simultaneously is just around the corner.


Use cases and examples of AR civil engineering

AR technology is being applied beyond as-built management to various civil engineering scenarios. Here are some main use cases of AR civil engineering.


• Heavy equipment operation support: In slope works, for example, design slope lines can be projected in AR on the slope so that excavators and other operators can perform excavation and embankment work while viewing the screen. Even without temporary chalk lines, operators can use a virtual guideline as a reference to achieve accurate work, improving efficiency and quality.

• Simplifying surveying and layout: At foundation construction sites, virtual stake pins corresponding to design positions can be displayed in AR, allowing layout to be completed without physically driving stakes. From a distance and in a safe location, supervisors can indicate “this is the reference point” through the screen, eliminating the need for personnel to work in hazardous areas. Surveying and layout that once required two people can be completed by one, contributing to labor savings and improved safety.

• Interference checks for structures: It is increasingly common to verify on site with AR whether rebar, piping, and other elements match the design. For example, displaying column and beam rebar placements in AR enables checking the number and spacing, or checking in advance with AR whether MEP piping will interfere with other structures. AR can visualize invisible spaces such as ceiling voids and underground areas, helping to prevent rework caused by construction mistakes.

• Visualizing and sharing progress: AR is also effective in construction progress management. By overlaying the current progress status and the area for upcoming work in AR at the site, all stakeholders can intuitively grasp the current situation and upcoming plans. Sharing site video with remote supervisors and letting them view AR overlays via the cloud allows appropriate instructions and confirmations even when not physically present.

• Explanations to clients and residents: There are use cases where a life-size completion image is displayed in AR at the site for clients or nearby residents. Because it is difficult to convey post-completion appearance with drawings or perspective images alone, showing it on site makes consensus-building smoother. Merging AR models into site photos for regular meetings or conducting on-site AR checks with clients in attendance clarifies the “intent of construction” and the “expected completed form,” making it easier to gain understanding and agreement. Projecting the expected completion image on site is also being used at residents’ briefings and is attracting attention as a way to gain local cooperation.


These examples show that AR civil engineering has a wide range of use cases, but the common theme is “visualizing information intuitively on site to speed decision-making and reduce mistakes and waste.” Because everyone on site can proceed with the same AR image, differences in drawing interpretation and communication errors are reduced, strengthening overall project coordination.


Many benefits brought by AR utilization

As described above, using AR technology brings various benefits to construction sites. The main advantages are as follows.


• Prevention of construction mistakes: AR can detect millimeter-level deviations on the spot, greatly reducing mistakes where work continued without awareness. Early correction becomes possible, reducing rework and material waste.

• Improvement in quality and efficiency: As-built verification tasks that traditionally required time and effort can be performed in real time, dramatically accelerating the speed from measurement to decision. Skipping the step-by-step measuring and recording process streamlines inspections and contributes to shortening the overall construction period.

• Labor reduction and skill transfer: With AR systems and high-precision positioning, surveying performed by two people can often be completed by one, enabling labor reduction and work simplification. Young, less experienced staff can use these tools intuitively, achieving high-precision construction management without relying on veteran intuition. This is a major advantage for addressing labor shortages and transferring skills.

• Improved safety: By replacing temporary layout marking and measurements in hazardous areas with AR, opportunities for people to enter danger zones are reduced. If instructions and confirmations can be made remotely via AR displays, risks associated with working at heights or around heavy equipment are lowered, contributing to the prevention of occupational accidents and strengthening safety management.

• Smooth communication with stakeholders: Visual information sharing through AR facilitates communication with clients and inspectors. Being able to show the as-built condition directly on a tablet while explaining makes points that are hard to convey verbally immediately clear. This increases client understanding and acceptance, smoothing inspections and enhancing transparency to improve trust.

• Digital records and proof of quality: Point cloud data and screenshots obtained via AR can be stored and used directly as digital as-built records. Report preparation can be automated and simplified, reducing paperwork burdens. Also, data-based reliable proof of quality can be presented later if construction accuracy is questioned.


These multifaceted benefits make AR adoption notable as a DX tool that simultaneously improves on-site productivity and quality. It can reduce costs through error prevention, improve profitability through efficiency gains, and ensure safety and trust—yielding a variety of expected benefits.


On-site DX and future prospects

ICT and DX are accelerating in the construction industry, and the tools that will become standard on future civil engineering sites are changing. The Ministry of Land, Infrastructure, Transport and Tourism has introduced various advanced technologies such as drone surveying and machine-guided heavy equipment under the i-Construction initiative, but from a site management perspective the most noteworthy tools are those that combine high-precision GNSS and AR. With these, tasks that had site supervisors running around with paper drawings and tape measures could be completed with a single tablet.


Examples of digital tools that could become standard on sites include:


• High-precision positioning equipment: RTK-capable GNSS receivers and electronic control boards that can position and survey with centimeter-level accuracy

• AR-compatible viewers: Smartphone and tablet applications capable of overlaying BIM/CIM models and drawing data on site

• 3D scanners: Laser scanners and photogrammetry tools that can rapidly acquire as-built point cloud data (recently, built-in tablet LiDAR can be used as an alternative)

• Cloud-linked platforms: Services that enable real-time sharing of 3D data and site status between the field, the office, and clients


Combining these tools will enable a workflow where site supervisors themselves can complete measurement, verification, and reporting on the spot. Without needing to call in surveying specialists, teams can handle data acquisition and inspection preparation themselves, so the benefits are especially large for small sites and those with limited personnel. Digital-native younger engineers are more familiar with IT tools and can actively leverage them to bridge skill gaps between generations. The future construction manager may need the ability to flexibly combine long-cultivated field experience with the latest technologies.


What is simplified surveying with LRTK?

Finally, as one concrete solution for realizing the AR and high-precision positioning described so far, we introduce simplified surveying with LRTK. LRTK is an AR-compatible RTK-GNSS system provided by Reflexia, characterized by its ease of use: attaching a small antenna to a commercially available device such as an iPhone or iPad is all that is required. Without carrying around expensive dedicated surveying equipment, attaching an LRTK antenna to a smartphone and launching a dedicated app lets you immediately use centimeter-accuracy positioning and AR on site. It eliminates difficult alignment work and is designed so anyone can intuitively use AR for as-built checks.


With LRTK, as-built and position management can be completed by one person. Survey tasks that previously required a pair of workers or relied on a veteran’s intuition for layout can be performed alone using a smartphone and LRTK. From setting reference points to measuring as-built conditions and recording photos, a single smartphone can handle the workflow, drastically reducing work time and labor costs. LRTK can be called a “new measuring stick” for site construction managers.


Major construction companies and local small-to-medium contractors alike have already begun adopting LRTK as part of on-site DX. The new style of “one person, one smartphone for surveying and AR” could be the trump card for achieving both labor savings and productivity improvements in an aging and shrinking workforce. Considering future standard site tools, consider adding LRTK simplified surveying as one option for preventing construction mistakes and improving efficiency. It can easily realize on-site innovation through AR technology and bring new value and peace of mind to construction management. The day when veteran intuition and the latest technology merge into the new standard for construction management may not be far off.


FAQ

Q: Can the accuracy of as-built management using AR really be trusted? A: Yes. When combined with high-precision GNSS, AR can achieve sufficiently reliable accuracy. Standard smartphone GPS has errors of several meters, but RTK correction can reduce errors to the order of several centimeters. In fact, LRTK simplified surveying has confirmed horizontal positioning accuracy of about 1-2 cm (0.4-0.8 in), comparable to conventional first-class surveying instruments. Design models and real objects overlay correctly on AR, so steps and gaps of a few centimeters can be reliably detected. For critical areas, combining AR results with acquired point cloud data allows millimeter-level accuracy verification.


Q: Can AR-based as-built checks be used for official inspections in public works? A: Currently AR usage is not explicitly specified in official procedures, but the Ministry of Land, Infrastructure, Transport and Tourism is evaluating the effectiveness of AR within ICT construction and 3D as-built management, and adoption on sites is gradually increasing. Demonstration experiments have shown attempts to confirm as-built conditions by overlaying design models and current conditions on tablet AR screens, and in some cases performing AR-based as-built inspections has allowed the omission of traditional as-built management document submissions. If guidelines are developed in the future, AR-based as-built confirmation may become recognized as part of official inspection methods.


Q: Is operating AR systems difficult? Can people who are not digitally savvy or younger engineers handle them? A: Operation is very intuitive and simple. Measurement and AR display operate like taking photos with a smartphone or tablet, so people without special surveying skills can use them after a short training period. The site data are prepared design models and drawings, so users just select files in the app and follow instructions. With a well-designed UI, anyone can perform accurate as-built checks, and results are visually displayed, making them easy to understand and share within the team. Young engineers are already adopting these tools easily as if playing a game, and veterans tend to appreciate the convenience once they try them.


Q: What kinds of construction or sites are suitable for AR civil engineering? A: AR is broadly applicable wherever you want to verify design-to-construction deviations on site. For example, AR heatmap displays are effective for large-scale earthworks such as road construction and land development where wide-area elevation management is required. In cases where checking thickness or shape of structures is critical—such as tunnel excavation or dam construction—comparison with 3D models enables reliable verification. In building construction, AR can be used to compare column and wall positions with BIM models or check for piping interference before installation. In short, wherever you want to immediately verify on site that work matches the drawings, AR will be effective. The more costly remeasurement or rework is, the greater the benefit of introducing AR checks.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.