What is as-built inspection? Why AR use is gaining attention

As-built inspection (as-built management) is a quality control process in civil engineering and construction that verifies whether completed structures, developed land, and the like have been constructed according to the design drawings. Traditionally, as-built inspections used surveying instruments such as total stations (TS) and levels: onsite personnel measured heights and thicknesses point by point, recorded them, and later returned to the office to compare the recorded values with the design values on drawings to determine pass/fail. However, this method often causes a time lag between measurement and discovery of defects, leading to rework. High-precision measurement and judgement also require skilled surveyors, and many tasks have been performed by two-person teams; with labor shortages and an aging workforce, this process is becoming inefficient. To address these issues, further streamlining and labor saving of as-built inspection tasks at sites has been demanded.


Recently, the use of AR (Augmented Reality) technology has attracted attention as a trump card to solve such on-site inspection issues. AR overlays digital information such as design drawings and 3D models onto real-world imagery. Once an advanced field, AR has become applicable to everyday construction management thanks to improvements in smartphone and tablet performance. Modern smartphones and tablets, many equipped with high-performance cameras and LiDAR sensors, combined with dedicated AR apps, now allow intuitive as-built checks on site. As industry-wide DX progresses—driven by initiatives like the Ministry of Land, Infrastructure, Transport and Tourism’s *i-Construction*—introducing AR into as-built inspections is increasingly expected to be a powerful solution to simultaneously improve site efficiency and quality.


Benefits of introducing AR

Introducing AR technology into on-site as-built inspections delivers many benefits not available with traditional methods. The main advantages are listed below.


• Immediate detection of issues on site: Construction defects or discrepancies from design can be discovered immediately at the site, allowing prompt corrective actions. For example, if there is insufficient thickness in a paving operation, AR can color-code the deficient areas right after paving so that additional paving or milling can be carried out the same day. By enabling an immediate PDCA cycle on site, AR minimizes rework and prevents quality defects from being left unaddressed.

• Reduction of work time and labor: Traditional work of carrying paper drawings and surveying instruments and measuring each point is replaced by intuitive checks that only require pointing a tablet with AR. Because AR can visualize wide areas of as-built conditions at once, inspections that used to take several days can be drastically sped up. Since measurement and checking can be completed by a single person, personnel arrangement is simplified and labor is reduced.

• Addressing labor shortages: Site personnel can evaluate as-built conditions on the spot without relying on specialized surveyors or veteran technicians. AR app operation is simple; following on-screen prompts completes measurement and checking. Since no special skills are required, AR prevents knowledge concentration in specific individuals and allows less experienced workers to perform measurements and inspections. Even sites suffering chronic labor shortages can maintain quality control with limited staff through AR inspections.

• Cost reduction: AR using smartphones or tablets eliminates the need to purchase expensive TS or GPS surveying instruments. Dedicated surveying equipment can require initial investments of several million yen, but recently it has become possible to build a centimeter-level positioning environment at low cost by combining existing mobile devices with relatively inexpensive GNSS receivers. There is no need to transport heavy equipment to the site, and maintenance costs for equipment are reduced.

• Improved measurement accuracy and reliability: AR reduces the risk of human measurement error and recording mistakes. Because there is no need to transcribe numbers from onsite notes, digital data can be compared directly, eliminating human error. Combined with high-precision RTK-GNSS positioning, measurement results can match public coordinate systems with centimeter-level precision (centimeter-level accuracy (half-inch accuracy)), enabling more reliable as-built verification than before.

• Efficiency in recordkeeping and reporting: AR allows inspection results to be saved as visual data, simplifying report preparation. For example, attaching AR screen screenshots or difference heatmap images directly to inspection reports creates materials much easier to understand than traditional reports listing numbers alone. In fact, Ministry of Land, Infrastructure, Transport and Tourism field demonstrations have confirmed that AR can simplify submission documents such as as-built drawings. Because all records remain as digital data, later verification or traceability is easy, reducing the burden of reporting tasks.

• Improved consensus-building and communication: AR visualization is effective for information sharing with site stakeholders and clients. Showing the completed image overlaid on the real object through a tablet makes explanations during client inspections smoother. Displaying as-built data on AR for client confirmation reduces misunderstandings and facilitates on-the-spot agreement on corrective locations. The Ministry’s surveys report that AR is beginning to be used not only for construction management but also for pre-construction resident briefings and subcontractor information sharing. In this way, AR contributes to improved communication both inside and outside the site.


Key points to achieve results on site

To effectively incorporate AR as-built inspections into site operations, several points should be addressed at the time of introduction. Paying attention to the following will help you smoothly establish operational routines.


• Ensure high-precision alignment: Accurate alignment between digital information and the real world is critical for correctly overlaying digital information with AR. On large construction sites or long structures, even slight misalignment can lead to large errors. As countermeasures, use RTK positioning with GNSS and rigorous calibration at known points to always align models and reality at centimeter-level precision. Using an RTK-capable AR system allows projecting models to correct coordinates without placing ground target markers, enabling stable AR displays that do not drift as you walk around the site.

• Prepare 3D design data: Performing AR as-built inspection requires 3D models of design data (BIM/CIM data, etc.) as comparison targets. If 3D data is not included in contract drawings, create simple 3D models from 2D drawings or acquire point cloud data by LiDAR scanning the existing conditions to prepare digital comparison data. With the Ministry’s promotion of CIM, the creation of 3D models from design stages is accelerating, so obtaining models on future sites should become easier. It is important to familiarize your organization with handling 3D data now.

• Integrate into operational workflows: To make AR inspections part of standard site procedures rather than a one-off demonstration, clearly define who will use AR, when, and at what timing. For example, specify in construction plans and checklists that “use AR for rebar inspection before concrete casting” or “confirm finish with AR after embankment completion.” Decide in advance how AR-verified content will be recorded and reflected in reports. For instance, using a system that automatically attaches date/time and position info to AR screen screenshots and saves them to the cloud allows using those images directly as inspection evidence. Embedding AR into existing quality control flows will help it become a standard tool that everyone on site uses habitually.

• Train site staff: To reduce resistance to new technology, it is important that site staff understand how to use AR and its benefits. Start by trying AR inspections in small-scale tasks led by ICT-savvy personnel. Demonstrating AR on site and sharing the experience that “anyone can measure by following on-screen instructions” is key. Recent AR apps are intuitive and easy to operate, so training can be completed quickly even by those without specialist knowledge. Share operation procedures through in-house training and on-the-job training, and present concrete success cases to convey benefits to veterans so adoption proceeds smoothly.

• Staged introduction and performance verification: Rather than immediately introducing AR across all sites and processes, it’s recommended to pilot AR inspections on a subset of sites or specific processes and verify their effects and issues. For example, use AR in parallel with traditional methods in a particular section and present data on reductions in work time or error rates to gain internal and external understanding. Start small to accumulate know-how; identify and correct issues in handling equipment and accuracy verification before company-wide rollout. If you prepare internal manuals and checklists based on demonstration results, horizontal deployment to other sites will go smoothly.

• Use cloud services: Using cloud services linked with AR apps allows measurement data, point cloud models, site photos, and so on to be automatically saved and shared in the cloud. This makes it possible to check the site’s as-built status in real time from a remote office. Because team members can always view and comment on the latest data in the cloud, instructions for corrective action or requests for additional investigation can be issued quickly. Data accumulated as cloud history can be referenced in future projects or used as evidence in case of problems. When introducing AR, enable cloud integration as much as possible to centralize data management and streamline information sharing.


Use cases of AR as-built inspection

On actual sites, AR as-built inspections are being used in a variety of applications. Below are representative use scenes.


• Confirmation of rebar and structure positions: AR is effective for rebar arrangement inspections before concrete placement and for checking positional deviations in structures during construction. For example, instead of comparing paper rebar drawings with the actual rebar, you can display the 3D model of the rebar arrangement in AR and check the number and spacing immediately, allowing you to detect deviations at a glance. This eliminates the need for measuring with a tape measure and prevents missing minute millimeter-level deviations. Early detection of defects by overlaying design models on actual objects allows immediate rework, reducing large-scale rework and material waste in reported cases.

• Pavement thickness and slope as-built inspections: In road paving works, combining AR with point cloud measurement enables planar evaluation of wide-area as-built conditions. Right after paving, scanning the pavement with a smartphone LiDAR to obtain high-density pavement point cloud data and overlaying the design 3D model allows generating an on-site “as-built heatmap” that color-codes elevation differences. You can immediately determine whether pavement thickness and slope across the entire section are within design tolerances, detecting unevenness or insufficient thickness comprehensively. You can also directly measure longitudinal slope or road width on the acquired point cloud data, enabling safe and rapid completion of inspections; some sites have achieved zero rework later.

• Confirmation of buried objects such as pipes: AR can “see through” and verify objects buried underground—such as pipes and cables—that cannot be visually inspected after construction. For example, in sewer pipe works, pipes can be 3D scanned before burial and accurate position and depth point cloud data saved in the cloud; after backfilling, simply pointing a smartphone allows anyone to understand the route and depth of buried pipes. This eliminates post-burial marking work and makes future maintenance excavations that avoid buried objects easy using AR displays. Visualizing invisible objects is a major advantage unique to AR as-built inspection.

• Use of slope and terrain models: For steep slope works or large-scale land developments, combining 3D scanning and AR for as-built management improves safety and efficiency. For example, scan the slope before construction to obtain baseline data, then rescan after construction or after a disaster and compare to instantly calculate collapse areas or changes in embankment volumes. Tasks such as earthwork volume calculation that used to take days can be completed in minutes, and results can be used for restoration planning and as-built evaluation. Overlaying the obtained slope point cloud model onto the site scenery in AR allows all workers to intuitively share dangerous areas or positions where reinforcement anchors are needed. Combining 3D data of terrain and structures with AR display makes it possible to safely and reliably conduct as-built management and defect detection over wide areas and at heights that were difficult before.


Challenges and countermeasures when introducing AR

While AR as-built inspection offers many benefits, there are challenges to consider in introduction and operation. Below are the main challenges and countermeasures.


• Concerns about accuracy: Questions like “Can AR really measure accurately?” are common. Indeed, if alignment is inaccurate, correct judgments cannot be made, so accuracy management is crucial. Countermeasures include RTK corrections using GNSS and rigorous calibration at known points to eliminate gaps between digital models and real space. Combining a GNSS rover with an AR system makes it possible to spatially align design data exactly with the actual as-built. With proper operation, inspections have been demonstrated at accuracy levels comparable to traditional surveying (both horizontal and vertical within a few centimeters). In the early stages of introduction, combine AR with traditional measurements at key points to verify errors and ensure accuracy.

• Effort to prepare digital data: Utilizing AR requires preparing digital design 3D models and point cloud data, and the associated effort is sometimes pointed out. While BIM/CIM and other 3D design data are becoming more prevalent, smaller sites may still lack 3D data. In such cases, LiDAR-scanning the site to obtain as-built point clouds allows using them as impromptu 3D models. There are also apps that can display simplified reference lines or planes in AR from only 2D drawings. The Ministry’s guidelines also promote migrating to as-built management using 3D measurement technologies, so necessary data will become easier to obtain over time. Though it may seem burdensome initially, once data are prepared they will benefit subsequent construction management and future maintenance. View this as a digitalization investment for long-term efficiency gains and actively engage.

• Device and site environment considerations: Physical challenges arise when using smart devices on site. For example, tablet screens can be hard to see under direct summer sunlight, and battery drain can be rapid. Countermeasures include using sunshades for tablets or carrying portable batteries. For rainy conditions, waterproof or splash-resistant cases are advisable. In dusty environments, clean camera and LiDAR sensor surfaces frequently. If holding a tablet for long periods is burdensome, consider using a neck holder. Introduce accessories and operating methods suited to the site environment so devices can perform optimally.

• Resistance from site staff: Psychological barriers to new technologies cannot be ignored. Experienced veterans may say, “I feel safer with traditional manual methods.” The best solution is to let them experience the benefits of AR firsthand. For example, share concrete results such as “a surveying inspection that used to take half a day is completed in 30 minutes with AR” or “a previously overlooked rebar mistake was discovered on the spot.” Using tools like LRTK, which enable “anyone to easily survey alone,” can convert two-person tasks into single-person tasks and often win welcome from the field. Encourage younger staff to take the lead using AR and let that convenience spread through the team; resistance will gradually diminish.

• Introduction cost and ROI: Introducing new hardware and software involves costs, but AR can leverage existing smartphones and tablets, significantly lowering initial investment barriers. As noted earlier, instead of purchasing expensive dedicated surveying equipment, the primary costs are GNSS receivers and software subscription fees. Considering quantifiable effects such as reduced rework and labor cost savings, ROI can often be expected relatively early. If cost-effectiveness is a concern, start with limited implementation and demonstrate visible results (e.g., % reduction in work hours, △ fewer defect corrections) to stakeholders. Calculating ROI based on obtained performance data provides persuasive material for management and clients and facilitates further investment decisions.

• Application to official inspections: Currently, as-built management guidelines may still require parallel traditional measurements and drawing preparation in some cases. Some inspectors may be cautious about accepting only digital checks on a tablet as conclusive. However, the Ministry confirmed in field demonstrations in FY2023 the effectiveness of AR-based as-built inspection, and AR-based labor-saving methods are expected to be incorporated into official guidelines in the future. Even now, software that automatically creates as-built documents (drawings and forms) from AR-acquired point clouds or photos can produce deliverables equivalent to traditional ones. The important thing is to explain AR-derived results appropriately to clients and inspectors to gain their understanding. For example, showing an as-built heatmap on a tablet during an inspection is more persuasive than a paper table of numbers. As public and private sectors’ understanding of AR deepens, adopting it early and accumulating know-how will provide future advantages.


Simple surveying and AR inspection realized with LRTK

As a solution that enables the AR as-built inspections described above to be implemented more easily and with higher accuracy, LRTK has attracted attention. LRTK is a cutting-edge tool that allows centimeter-level high-precision positioning using RTK simply by attaching a compact GNSS receiver to a smartphone. It was developed as a next-generation system to let anyone complete surveying tasks alone—work that traditionally required specialized equipment and skilled operators. It supports the Japanese QZSS centimeter-level augmentation service (CLAS) and network RTK, maintaining stable high precision even in mountain areas out of cellular coverage. In other words, a major strength is that you can perform baseline point surveying to as-built verification using only a smartphone without a veteran surveyor.


LRTK also seamlessly integrates with AR functions. Using the high-precision GNSS position as a foundation, 2D/3D design data can be overlaid and displayed precisely on site, eliminating tedious alignment work and preventing object drift. For example, simply walking around the site with a tablet will accurately indicate virtual pile-driving positions from the design model on the actual ground. Target coordinates can be recognized at a glance even at distant locations, greatly reducing the time spent locating survey stakes. It is also possible to automatically overlay acquired as-built point clouds with design models in LRTK’s cloud and perform difference comparisons, allowing an immediate check of “whether construction is proceeding according to plan.”


LRTK provides a cloud platform where site-measured and scanned data are synchronized to the cloud on the spot. Team members can view onsite 3D point clouds and measurement point information in real time from office PCs and collaboratively verify data. On the cloud, you can measure distances, areas, and volumes or link photos with position information and display them in a list with a click. This enables collaboration that transcends the boundary between site and office and dramatically improves the efficiency of as-built inspections.


Additionally, LRTK offers a range of features beyond as-built management: a “coordinate navigator” function that guides a single person to pile-driving positions, a function to calculate embankment volumes from LiDAR-acquired point clouds, and a function to share high-precision geotagged photos on the cloud. In short, LRTK is designed so that surveying, verification, recording, and as-built inspection—processes that used to require multiple devices—can be completed with a single smartphone. Data obtained on site can be used and delivered in formats compliant with the Ministry’s as-built management guidelines, and many construction companies have started adopting LRTK to achieve both labor savings and quality improvement.


By leveraging smartphone surveying and the LRTK AR system, anyone can easily perform high-precision as-built inspections and overcome many constraints related to surveying and inspection. Even on sites suffering from labor shortages, “one person, one device” smart surveying tools combined with AR can simultaneously reduce work time, suppress human errors, and improve communication among stakeholders. These cutting-edge technological innovations robustly support DX (digital transformation) on construction sites and are fundamentally changing as-built management. The key to successful AR as-built inspection is to incorporate such advanced tools effectively and link them to overall productivity improvements on site. Adopt the latest technologies and let “AR inspection” demonstrate its true value on your sites.


Frequently asked questions

Q: What do I need to start AR as-built inspections? A: Essentially, you need a smartphone or tablet capable of AR display, a GNSS receiver to improve positioning accuracy, and an AR surveying app compatible with them. Modern smartphones and tablets have capable cameras and sensors suitable for AR. For centimeter-level accuracy requirements, combine a small Bluetooth GNSS rover with RTK positioning (such as an LRTK device that can be attached to a smartphone). Also prepare digital comparison data such as 3D model data from design drawings or point cloud data. With this setup, you can immediately try AR as-built inspections on site.


Q: Can the accuracy of AR-based as-built inspections be trusted? A: Yes. With proper operation, high accuracy and reliability can be ensured. Systems using GNSS RTK corrections achieve positioning accuracy on the order of a few centimeters in both horizontal and vertical directions, which falls within the accuracy range typically required for as-built verification. Even when checking differences on AR, color-coded heatmaps provide quantitative information like “which points are how many centimeters higher/lower than the design.” The important thing is to align the site control points and AR data coordinates carefully in advance and to perform spot checks with traditional methods when necessary. Doing so allows you to trust AR inspection results with sufficient evidence.


Q: Can AR be used on sites without 3D design models? A: Yes—AR can be used even without design 3D models with some ingenuity. Some apps allow importing 2D drawing data (DXF, etc.) into AR space to visualize key lines and positions on site. If the finished shape is not too complex, you can also mark key dimensions on the ground before construction and overlay them onto AR-captured images as a simple method. However, AR is most effective when there is a design 3D model. Increasingly, CIM models are being created especially for public works, so consider requesting 3D data from the client or creating simple models in-house. If you only need to compare as-built measurement data (point clouds) with design drawings, you can detect differences using point cloud processing software without relying on AR. The objective is “intuitive onsite confirmation,” so choose the best method depending on whether models are available.


Q: Can AR inspection results be used for official inspections? A: Currently, using AR inspection results alone for official pass/fail judgements is still in early stages, but acceptance is gradually increasing. The Ministry verified in FY2023 field demonstrations that AR technology can allow omission of some as-built document submissions. At present, traditional records (inspection drawings and photo logs) are often still required in parallel, but submitting AR verification results as supplementary materials makes it easier to gain inspectors’ understanding. For example, presenting an AR heatmap showing “this location is ◯ cm higher/lower than the design” during inspection conveys the situation more intuitively than a conventional numeric table. It is quite possible that AR-obtained data will be officially accepted as deliverables in the future, but for now it is prudent to use AR results as supporting evidence and combine them with traditional measurements as needed.


Q: I’m worried whether everyone on site can use this technology. A: AR construction support tools are becoming increasingly user-friendly, and basic operations are not difficult. Many companies that have introduced AR report that personnel from young staff to veterans can use it after short training. If concerns remain, start by having an experienced operator demonstrate on site while others learn by observation. People tend to adopt new tools once they see the benefits themselves. When they realize “work finishes faster” or “it’s easy to understand visually,” resistance diminishes. Many AR apps support Japanese language and have established support systems, so help is available when needed. As ICT use on sites becomes more required, proceed gradually to build an environment where everyone can use the tools.


Q: Is it necessary to use dedicated AR glasses? A: Currently, smartphones and tablets are sufficiently practical. Commercial AR smart glasses (transparent goggles) are available but are very expensive and can be difficult to use with safety helmets. Smartphones and tablets, on the other hand, can be used on site with dustproof/waterproof cases and are simple to operate via touchscreen. Device screen resolution and processing power have improved yearly, so visibility and performance are generally adequate for work use. If glasses become lightweight and affordable in the future, their adoption may expand, but for now using familiar mobile devices for AR is the most realistic and cost-effective approach. Start with mobile AR and consider glasses later if needed.


Dramatically improve site surveying accuracy and work efficiency with LRTK

The LRTK series realizes high-precision RTK-GNSS positioning in construction, civil engineering, and surveying, enabling significant reductions in work time and dramatic productivity improvements. It supports the Ministry’s i-Construction initiative and is an ideal solution for promoting digitalization in the construction industry.


For details about LRTK, please visit the official LRTK website.


• [What is LRTK|LRTK Official Site](https://www.lrtk.lefixea.com)

• [LRTK Series|Device List Page](https://www.lrtk.lefixea.com)


For product inquiries, estimates, or consultation on introduction, please feel free to contact us via the [inquiry form](https://www.lrtk.lefixea.com/contactlrtk). With LRTK, take your site to the next stage.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page