How AR Inspections Are Changing Civil Construction Sites: A New Style of As‑Built Inspection

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

As‑built inspection—the process of confirming that completed structures or terrain match the design—is an indispensable part of quality assurance in civil construction. Traditionally, as‑built inspections have relied on manual work with tape measures and levels, requiring vast amounts of time and effort and carrying the risk of oversights because measurements are taken only at selected points. Recently, a new method called AR inspection has emerged in this field, dramatically improving work efficiency and accuracy. Design data can now be overlaid onto the real world through a smartphone or tablet camera, allowing as‑built conditions to be checked on the spot immediately after construction. This article explains how AR inspection is transforming civil construction sites, how it works, and its benefits. At the end, we introduce a simple surveying solution that anyone can use to start AR inspections easily.


Contents

• What is as‑built inspection using AR?

• Problems with conventional as‑built inspection

• How AR inspection enables real‑time as‑built checking

• Example AR inspection workflow on site

• Digitalization of construction sites and government trends

• Main benefits AR inspection brings

• Conclusion: How to start AR inspection easily

• FAQ


What is as‑built inspection using AR?

In public infrastructure projects and similar work, as‑built management (as‑built inspection) is performed to verify and record that completed structures or developed land have the shapes and dimensions specified in the design. For public projects in particular, handover is not permitted unless as‑built inspection passes, so this is critically important for quality control. Conventional as‑built inspection typically involved surveyors measuring heights, thicknesses, and widths with tape measures, rods (staffs), and levels, then comparing the measurements with drawings and numbers to determine pass/fail. However, manual measurement takes time and effort and can measure only a limited number of points, making it difficult to fully understand quality variability.


A new method attracting attention to solve these problems is “AR as‑built checking.” This combines AR (Augmented Reality) technology with positioning technologies to enable real‑time on‑site verification of as‑built conditions. Specifically, design drawings and 3D model information are overlaid on the live camera view of a smartphone or tablet. This makes it possible to intuitively grasp differences between the actual site and the digital design information on the spot. For example, projecting the design reference lines or completed shapes via AR onto the ground just after construction makes it immediately obvious whether the finish is within tolerance. This system is supported by GNSS (satellite positioning systems) that enable high‑accuracy positioning and various sensors built into smartphones. What had been done on paper drawings or forms is evolving into a digital method called AR inspection.


Problems with conventional as‑built inspection

The following issues have been pointed out by field teams regarding conventional as‑built inspection methods:


• Heavy manpower and time burden: Measurement tasks typically require two or more people, and the wider the site, the more measurement points, sometimes taking a full day. With chronic labor shortages and fewer veteran technicians, it is not easy to efficiently carry out inspections with limited personnel.

• Limited coverage and risk of overlooking issues: There is a limit to how many points can be measured manually, making it impossible to cover the entire construction area. Sampling inspections at representative points risk missing areas that differ from the design. Larger structures in particular can have subtle unevenness or variability that is hard to fully capture, leading to cases where problems are only discovered at the inspection stage and hurried rework becomes necessary.

• Risk of human error: In complex sites, human errors such as forgetting to take photos or misrecording measurements often occur. For example, if photos are not taken before backfilling underground structures, it may be impossible to prove correct construction afterwards. Handwritten memo errors or transcription mistakes at the office can also undermine the reliability of inspection results.

• Burden of report preparation: As‑built management requires compiling measurement results into drawings and photos and preparing reports. With conventional methods, document preparation also takes time and effort, placing a large burden on site personnel.


Thus, conventional as‑built inspection is inefficient and prone to oversights and mistakes, and there has long been demand for more efficient and reliable inspection methods. With current labor shortages and workstyle reforms, there is strong expectation for leveraging digital technology to reduce labor and increase productivity on site.


How AR inspection enables real‑time as‑built checking

The key to solving these issues is the fusion of AR technology and high‑accuracy GNSS positioning. Recently, small RTK‑GNSS receivers that attach to smartphones and dedicated apps have made it possible for anyone to obtain centimeter‑level position accuracy in real time. RTK (Real Time Kinematic) GNSS reduces errors to within a few centimeters (within a few inches) by adding correction information from a base station to satellite positioning. This precise positioning technology, which previously required expensive dedicated equipment, can now be realized with a smartphone and an affordable receiver.


With high‑accuracy self‑positioning, spatial comparison with digital design data becomes easy. By loading design BIM/CIM models or CAD drawing data into a dedicated app and aligning them with the site’s survey coordinate system, the app can overlay those design data precisely onto the camera view of the smartphone. For example, the designed finished shape or reference lines can be projected as AR onto the landscape seen through the phone. Because the user’s position determined by GNSS accurately matches world coordinates, the virtual model does not shift relative to the real object as you walk around—this is a major advantage. Being able to compare real structures and digital information one‑to‑one converts the conventional “measure, then check at the office” process into real‑time verification where you “measure and check on the spot.”


Also, by using LiDAR scanners or high‑resolution cameras built into smartphones, the site can be recorded as 3D data while inspecting. For example, you can scan the area to be checked with a smartphone to obtain point cloud data (a 3D scan of the current condition) and automatically generate a heat map (a colored error map) by comparing it with the design 3D model. If you load a heat map showing as‑built deviations into the smartphone and display it in AR on site, you can instantly see which areas are a certain number of centimeters high or low compared to the design and immediately move to corrective filling or cutting work. Previously, point cloud data had to be processed in the office to create a color‑coded map, and then the site had to be rechecked against drawings to find problem areas; with AR, direct on‑site confirmation greatly reduces rework.


Example AR inspection workflow on site

How does as‑built inspection using AR actually proceed? Below is a typical flow of AR × GNSS as‑built checking on a civil engineering site.


• Preparation (prepare design data): First prepare digital design drawings and 3D models for the construction target. BIM/CIM models or CAD data typically include information on the finished shape, reference lines, and reference planes; load these into the dedicated app and align them with the site’s survey coordinate system. BIM/CIM adoption has progressed in recent years, making digital design data easier to use.

• Equipment setup: Next, attach an RTK‑GNSS receiver to the smartphone or tablet so high‑accuracy positioning can be performed on site. In Japan, centimeter‑class augmentation services provided by the Quasi‑Zenith Satellite System “Michibiki” (CLAS) or internet‑based network RTK correction services allow anyone to obtain centimeter‑class positioning easily. Once positioning is stable, start the app’s AR display mode and, if necessary, calibrate the device’s orientation sensors (electronic compass).

• As‑built inspection work: For example, to check the height of a developed site, display a virtual horizontal plane that represents the design finish elevation in AR. Because the design elevation plane is shown transparently on the smartphone’s live view, the operator walks the site while checking whether the actual ground surface is higher or lower than the virtual plane. Where the virtual plane appears to float above the ground, fill is insufficient; where it appears below the ground, there is excess fill. Similarly, for road construction, you can project the design longitudinal and cross sections in AR and verify on site whether pavement thickness and slopes match the design.

• Real‑time instructions and corrections: When differences from the design are revealed by the AR display, share the results immediately with workers and promptly perform corrections. For example, if you find “this point is 5 cm (2.0 in) lower than the design,” you can add soil on the spot to adjust the height. Numeric guides displayed in AR (e.g., “Add +5 cm (+2.0 in) of fill”) and color‑coded displays are far more intuitive and easier to understand than verbal instructions, making them extremely effective as tools for directing site staff. By correcting nonconformities immediately after construction, rework is minimized while the work proceeds.

• Data recording and reporting: Once inspection is complete, save the results as digital data. Geotagged photos taken with the smartphone can be uploaded to the cloud so staff in the office can recheck necessary points. If a point cloud scan was performed, some systems can automatically generate heat maps and as‑built management charts from that data. Organizing these digital data allows them to be submitted directly as reporting material to the client.


Through this flow, AR × GNSS as‑built inspection enables on‑site verification and correction in real time and end‑to‑end digital completion of records of the final outcome. Compared with conventional methods that used paper field notebooks and tape measures, this is a dramatically more efficient workflow.


Digitalization of construction sites and government trends

Although cutting‑edge, AR‑based as‑built inspection is not an outlandish experiment. The Ministry of Land, Infrastructure, Transport and Tourism (MLIT) is actively promoting ICT use in construction management and officially supports digitalization of as‑built management. As part of the i‑Construction initiative, the MLIT has promoted BIM/CIM and 3D measurement technologies, and in 2016 it drafted the “As‑Built Management Guidelines Using 3D Measurement Technologies (draft)” to outline as‑built measurement methods using drone photogrammetry and terrestrial laser scanners. In 2022, the as‑built management guidelines were revised to formally permit the use of simple mobile devices such as smartphones as as‑built measurement instruments for public works. This change makes smartphone‑based 3D as‑built management feasible for small and medium‑sized sites even without expensive dedicated equipment.


In Reiwa 6 (2024), pilot programs began for supervision and inspection using digital data on MLIT‑directed projects, presenting a new inspection method where “3D models created during construction are projected on site using AR and as‑built measurements are conducted on the spot.” Previously, the process required creating and submitting heat maps from point cloud data and then performing on‑site measurements again during field inspections—essentially duplicating effort—but AR on‑site verification aims to streamline this process. With public and private sectors pushing digital transformation (DX) in construction, AR × GNSS as‑built checking fits this trend.


Furthermore, from fiscal year 2023, BIM/CIM is being applied as a principle to all MLIT‑directed projects except small‑scale ones, accelerating the preparation of 3D design data in many projects. This will dramatically increase the digital information available for AR use. Data‑linked automation and efficiency are becoming mainstream in the industry, and smart construction that does not rely on paper and manual work is gradually taking hold in as‑built inspection practices.


Main benefits AR inspection brings

AR‑based as‑built inspection provides significant benefits to the field. The main advantages are summarized below.


• Major efficiency gains and labor reduction: Surveying and inspection work that used to require two or more people can be completed by one person, freeing up personnel. Single‑person capability helps address chronic labor shortages while boosting overall site productivity. It also reduces stoppages due to “waiting for surveying,” since measurements and checks can be performed whenever needed, keeping projects on schedule.

• Improved quality through high‑density measurement: Point cloud scanning and continuous measurement allow broad areas to be measured densely, enabling surface‑level understanding of as‑built conditions. Subtle unevenness and dimensional variations are less likely to be missed, reducing variability in construction quality. Comprehensive data coverage offers peace of mind for both clients and contractors in terms of quality management.

• Reduced rework through real‑time correction: On‑site verification immediately after construction prevents situations where nonconformities are discovered only during later inspections. Real‑time “check on the spot, correct on the spot” enables early detection and immediate response to mistakes, greatly reducing rework and schedule extensions, and thus suppressing unnecessary costs.

• Intuitive and clear communication: AR visualization is far more intuitive than reports consisting only of numbers and text. When everyone on site shares the same AR view on their smartphone screens, it becomes immediately clear “where and how much needs to be corrected.” This helps align understanding among workers and supervisors without relying solely on the intuition or experience of skilled staff, facilitating smoother consensus building.

• Easy data recording and reuse: Measurement data and site photos are all saved and shared digitally, reducing the effort required to prepare forms and reports. Centrally managed as‑built data can be used for future maintenance and renovation work. Retaining veteran know‑how and site insights as data also helps mitigate skill‑dependency in knowledge transfer.

• Improved safety: AR‑based remote measurement reduces the need to enter hazardous areas. On steep slopes or at heights, surveying can be done from a distance by placing AR markers, so workers do not need to take unstable postures to measure. Measurement point placement around heavy machinery can also be guided remotely via AR displays, lowering the risk of contact accidents. These factors contribute to improved overall site safety.


As shown above, AR‑based as‑built inspection is not merely a novelty but provides practical benefits that directly address field challenges. With workforce aging and labor shortages becoming more severe in the construction industry, this method is expected to spread widely as a trump card that balances efficiency and quality.


Conclusion: How to start AR inspection easily

AR × GNSS as‑built checking used to be a cutting‑edge endeavor requiring specialized equipment. However, simple solutions combining a smartphone and a small GNSS receiver are now becoming available. For example, LRTK, a venture from Tokyo Institute of Technology, consists of a pocket‑sized RTK‑GNSS device that can be attached to an iPhone and a dedicated app, transforming the site into an environment where surveying and inspection can be completed using only a smartphone. This simple surveying system offers intuitive operation that even technicians without special training can use immediately to take advantage of high‑accuracy positioning, point cloud scanning, and AR‑based as‑built checking.


With tools like these, AR as‑built inspection—once difficult to adopt—becomes something anyone can practice in routine work. Since a single smartphone can “measure, record, compare, and share” seamlessly, digital construction management becomes feasible even on small sites or with limited personnel. The important thing is to try it on site first. You may find that tasks once done with paper drawings and tape measures can be digitized far more easily than you expected. AR × GNSS as‑built inspection is not a special futuristic technology but a practical tool already usable on site. Why not take this opportunity to start easy smart construction at your sites?


FAQ

Q: If I use AR for as‑built management, can I trust the accuracy? A: With AR systems combined with high‑accuracy RTK‑GNSS, position accuracy can be secured to within a few centimeters (within a few inches). Standard smartphone GPS has errors of several meters (several feet), but RTK corrections enable positioning at a level comparable to surveying control points. In addition, properly calibrating a smartphone’s gyroscope and electronic compass brings directional accuracy to a level sufficient for field inspection.


Q: What preparations and equipment are needed to display AR on site? A: Basically, an RTK‑capable GNSS receiver that attaches to a smartphone/tablet and a compatible dedicated app are sufficient. Prepare design data in advance (BIM/CIM 3D models or electronic drawings) and load them into the app, aligning them with the site coordinate system. It is convenient to use a GNSS receiver that can receive correction information via internet‑based services. As long as radio signals can be received outdoors, you can perform high‑accuracy positioning by connecting to a correction service without setting up your own base station.


Q: What about environments where GNSS cannot be received, such as inside tunnels or buildings? A: Unfortunately, RTK is not usable where GNSS satellite signals cannot reach. In such cases, you can place known points (reference points) on site as AR markers and perform relative alignment based on coordinates that were measured in advance. For example, in a tunnel you might use coordinates measured near the tunnel mouth by GNSS as the basis for aligning known points inside the tunnel, and then perform AR displays relative to that reference. Indoors, QR codes or dedicated markers are sometimes used for alignment.


Q: Doesn’t introducing AR as‑built inspection cost a lot? A: It is significantly lower cost than purchasing new large dedicated equipment. Many people already own smartphones on site, and small GNSS receivers are inexpensive compared with conventional surveying instruments. Software is often offered as cloud services, allowing flexible use through short‑term license agreements. Above all, the time savings and labor reductions translate to significant cost savings, so overall returns can exceed the initial investment.


Q: Can anyone quickly master an AR system? Is special skill or training required? A: Following the app’s instructions, the basic usage is not difficult. For example, systems like LRTK let you record coordinates by holding the antenna‑equipped phone over the point to be measured and pressing a button, and AR display is achieved by simply selecting the model data from the menu. However, it is advisable to practice basic handling and calibration procedures beforehand, so a short training session is recommended. Users will gain proficiency by repeatedly using the system on site.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.