RTK×AR markers for precise alignment
By LRTK Team (Lefixea Inc.)
In recent years, the use of AR (augmented reality) technology has been advancing at surveying sites in construction and civil engineering. By overlaying drawings or 3D models onto the real world through a smartphone camera, visualization of construction plans and verification of as-built conditions has become easy. However, conventional AR has had challenges in alignment accuracy and the amount of manual work required.
Meanwhile, RTK (real-time kinematic) positioning technology using GNSS has been spreading, and by correcting satellite-derived position information in real time, it is now possible to improve accuracy to errors on the order of several centimeters (several inches).
By combining this high-precision RTK positioning with AR technology, it becomes possible to overlay digital information onto the field with outstanding accuracy. The key to achieving this is the use of visual markers known as “AR markers.” By using RTK position information together with the visual reference provided by AR markers, a next-generation surveying method is emerging in which precise alignment can be achieved with just a single smartphone.
This article explains what AR markers are, what becomes possible when they are combined with RTK, and introduces specific use cases and benefits on construction and surveying sites. At the end of the article, we also touch on simple surveying using LRTK as a solution that makes such high-precision AR easy to implement. Let’s take a look at the new field techniques opened up by RTK×AR markers.
Table of Contents
• What is an AR marker?
• What is RTK?
• Precise alignment using RTK×AR markers
• Use cases on construction sites
• Scenes of use in surveying work
• Benefits brought by RTK×AR markers
• Simple surveying with LRTK
• FAQ
What is an AR marker?
An AR marker is a fiducial marker (a physical marker placed on the ground or an object) used when displaying virtual objects with AR technology at a site. For example, when capturing the site scene with a camera and displaying a CG model in AR within that scene, a marker placed on site can be used as a reference point to place the virtual model at the intended location.
AR markers are usually black-and-white distinctive patterns or QR-code-like shapes. When the camera recognizes them, the marker’s position and orientation are calculated based on the embedded relative-position information, and that point is used as a reference coordinate for AR display. In other words, an AR marker is a “reference sign” for AR.
The typical workflow for using AR markers is to capture the marker with the AR app’s camera, let the app recognize the marker’s position and pose, and then display the CG. With this approach, even if the camera moves, the virtual object rendered in AR maintains its relative position. However, because the final display still depends on the camera’s onboard sensor information, AR can drift relative to reality over time, making it unsuitable for long-duration or wide-area tracking.
There is also markerless AR, in which the camera automatically detects planes such as floors or walls and places CG accordingly. Because it requires no physical markers on site, it avoids the hassle of placing objects, but it performs far worse in terms of accuracy and stability. For example, the phone’s built-in orientation sensors can produce slight errors that cause AR displays to drift relative to reality. By contrast, with AR markers you can obtain an accurate reference point just by pointing the camera at the designated location, which is an advantage for establishing accurate AR references.
What is RTK?
RTK (Real-Time Kinematic) is a technique that corrects GNSS (global navigation satellite system) measurements in real time to achieve high precision. A base station (Base) installed at a known reference point and a mobile receiver (Rover) that measures position obtain satellite data simultaneously; the Base transmits measured error information to the Rover via communication to correct the Rover’s measurements. This can reduce errors that were about 5-10 m (16.4-32.8 ft) in standalone positioning down to about 1-2 cm (0.4-0.8 in).
In Japan, network RTK using the Geospatial Information Authority of Japan’s electronic reference point data (VRS method) is mainstream, and by connecting to correction information services via a SIM card, wide-area high-precision positioning is possible. Also, by using Japan’s quasi-zenith satellite system “Michibiki” centimeter-level positioning augmentation service (CLAS) (cm level accuracy (half-inch accuracy)), high-precision positioning is possible using only the broadcast satellite signals without installing your own base station.
Even non-experts in surveying are finding it easier to obtain high-precision position information on site simply by using a smartphone equipped with an RTK-capable GNSS receiver.
Precise alignment using RTK×AR markers
By combining RTK and AR markers, you can precisely establish the “reference” needed to accurately overlay 3D data onto the real environment. Because RTK allows you to pinpoint your position in a spatial coordinate system with high precision, the initial alignment (calibration) that was previously necessary can be omitted.
For example, placing an AR marker on site as a reference point enables the system to automatically construct an accurate coordinate space after the camera reads it. Once aligned, RTK position information continues to update in real time, so moving to another point or briefly pointing the camera elsewhere will not cause the display to drift. By placing digital data in the coordinate space determined by RTK and using the AR marker to indicate accurate orientation at that location, CG and real-world discrepancies can be minimized.
Furthermore, by using RTK’s high-precision heading and motion measurement techniques, you can accurately capture the user’s movement trajectory and orientation. Therefore, virtual objects will not shift in position or orientation regardless of the angle from which the smartphone is pointed.
By combining RTK and AR markers in this way, tasks that previously required multiple people for accuracy checks (double checks) or assistance can be completed by a single person, which is expected to greatly improve work efficiency and reliability.
Use cases on construction sites
RTK×AR markers can be applied to various situations in construction and on-site operations. Below are the main expected use scenes on construction sites.
• Improving efficiency of pile-driving and layout-marking work: Positioning of buildings and structures is a critical process that determines the success of subsequent stages. With RTK×AR markers, pile-driving positions and reference lines from the design can be displayed directly on the ground in AR. Workers can use a smartphone to confirm virtual piles and lines standing on the ground while positioning, enabling faster and more accurate work than conventional surveying instruments or multi-person workflows. This allows accurate pile placement instructions even on sites with labor shortages, contributing to labor savings and improved quality.
• Overlaying 3D design data: The number of cases where 3D data created with BIM/CIM is compared and checked on site is increasing. Using RTK×AR markers, 3D models from the design stage can be displayed on site in AR without small errors. For example, displaying a model of a structure to be installed later during earthwork allows intuitive confirmation of the final appearance and small misalignments. Subtle misalignments that are hard to convey on drawings might be noticed in AR as “a line is shifted in one part.” Also, AR enables step-by-step confirmation of work procedures on site, helping with schedule management and sharing completion images.
• Visualizing boundary markers and reference points: On construction sites, existing reference markers or boundary signs can become obscured by vegetation. With RTK×AR markers, reference points or underground buried objects that should not be visible can be visualized in AR. The position of a boundary post buried in vegetation can be indicated with a virtual marker, facilitating information sharing with clients and neighboring landowners and helping prevent disputes or misunderstandings about boundaries.
Scenes of use in surveying work
RTK×AR markers are expected to be highly useful for municipal surveying tasks such as civil engineering planning, land boundary confirmation, and disaster site documentation. Even in general surveying work performed by government bodies and municipalities, using AR is making on-site alignment simpler in many situations.
• Reconfirming and sharing boundaries: In situations where the boundaries of fields or land need to be confirmed, RTK×AR markers can play an important role. Since boundary lines and reference points from maps can be displayed on site in AR, it becomes easier to locate buried reference posts or boundary markers. This deepens the understanding of locations and facilitates smoother land negotiations before contracts or agricultural land partition adjustments.
• Recording and diagnosis at disaster sites: RTK×AR markers are also useful at disaster sites such as landslides or flooding. By overlaying pre-collapse terrain data or the positions of buried objects in AR, terrain changes can be intuitively grasped. Changes that are difficult to perceive by sight alone can be analyzed by comparing past and present in AR. Also, if the acquired data is synchronized to the cloud, people can understand site conditions without being physically nearby, aiding investigation of changes.
Benefits brought by RTK×AR markers
RTK×AR markers, which allow easy and highly accurate alignment, have the potential to significantly change on-site work. Below are the representative benefits.
• Reduced work time and process rethinking: Because positions can be visualized in AR, time spent reconfirming positions and human errors can be reduced. Tasks that once required multiple people walking around site to check positions and reference points can be confirmed immediately by a single person, leading to major efficiency gains.
• Superior accuracy control and quality assurance: Design information can be overlaid with centimeter-level accuracy (cm level accuracy (half-inch accuracy)), contributing to error prevention and quality assurance. Early detection and correction of misalignments reduce rework and rollback risks.
• Improved safety: Remote measurement and guidance using AR can reduce entry into dangerous areas. For example, virtual markers can be indicated from a distance for the top of a slope or high locations, improving safety for high-place work and heavy equipment operation.
• Enhanced information sharing: Intuitive AR displays facilitate smooth information sharing among stakeholders. Site conditions that are hard to convey with drawings alone become easier to reach consensus on with clients and local residents.
• Meeting DX demand: This technology aligns with construction digital transformation (DX) trends such as i-Construction promoted by the Ministry of Land, Infrastructure, Transport and Tourism. By using RTK×AR technology, high productivity and site digitalization can be achieved simultaneously.
Simple surveying with LRTK
One solution for easily implementing RTK AR on site is LRTK. LRTK is a next-generation surveying system composed of an ultra-compact RTK-GNSS receiver that attaches to a smartphone and a dedicated app. By attaching a pocket-sized device to a smartphone and launching the app, anyone can immediately start centimeter-level positioning and AR display (cm level accuracy (half-inch accuracy)). The accuracy is comparable to dedicated instruments; comparisons with first-class GNSS receivers used for national geodetic surveys report differences of only a few millimeters (a few hundredths of an inch).
Using LRTK, tasks that previously required expensive surveying equipment and skilled personnel can be completed with a single smartphone. For example, without installing reference points on site, you can immediately obtain high-precision positioning by using satellite augmentation signals (such as Michibiki CLAS) or VRS data. The acquired positioning data is automatically synchronized to the cloud, allowing progress checks and analysis from the office. Advanced features such as scanning the surroundings with a smartphone LiDAR to obtain laser point clouds and displaying AR heat maps of as-built versus design differences on site can also be accomplished by one person.
The LRTK series enables high-precision GNSS positioning in the construction, civil engineering, and surveying fields, making large reductions in work time and significant productivity improvements possible. It is compatible with i-Construction promoted by the Ministry of Land, Infrastructure, Transport and Tourism and is an ideal solution for advancing digitalization in the construction industry. In fact, LRTK has already been introduced at construction sites across the country, dramatically shortening time required for surveying and as-built confirmation and earning high praise for its ease of use by non-specialist site staff.
If you would like to try simple surveying using high-precision AR, please consider using LRTK. For product information and case studies, see the [LRTK official site](https://www.lrtk.lefixea.com). Consultations and inquiries about implementation are also accepted at any time. With cutting-edge RTK AR technology, take your site to the next stage.
FAQ
Q: What can be achieved by using RTK×AR markers? A: By combining RTK’s high-precision positioning with the visual reference of AR markers, you can overlay digital information onto the real world with accuracy on the order of several centimeters (several inches). A key feature is that virtual objects can be maintained at accurately correct locations without worrying about shifts due to user movement.
Q: What is required for implementation? A: Basically, an RTK-capable GNSS receiver, a smartphone that can connect to it (e.g., iPhone or iPad), and a dedicated AR-enabled app are required. Attach the receiver to the phone and prepare an environment able to receive GNSS correction information over the network (VRS or Michibiki CLAS, etc.), and you can start high-precision AR immediately. Supported devices and apps vary by product, but recently many solutions for iOS devices have emerged.
Q: Can it really achieve about 1-2 cm accuracy? A: Yes. Under appropriate conditions, RTK×AR markers can achieve very high accuracy of approximately ±1-2 cm (±0.4-0.8 in) horizontally and within a few centimeters (within a few inches) vertically. Reported positioning results are comparable to those of dedicated high-precision GNSS instruments, allowing virtual models to be overlaid almost perfectly on real objects.
Q: Can it be used without specialized knowledge? A: Yes. Dedicated apps with intuitive operation make it relatively easy to use even for those who are not good with machinery. Positioning results and AR guidance are displayed clearly on the smartphone screen, so with a little practice you can use high-precision positioning on site without special certification. Basic surveying knowledge is helpful, but starting RTK×AR markers does not require advanced technical training.
Q: What happens in places where satellites cannot be received? A: In places where satellite signals are extremely blocked, such as between tall buildings or deep inside forests, RTK positioning unfortunately becomes difficult. In such cases, it may be necessary to use terrestrial surveying instruments like total stations. However, the use of multi-GNSS and quasi-zenith satellites has improved satellite acquisition performance compared to older systems. In many cases, positioning is possible in locations with some open sky, and there are examples where RTK-capable smartphones measured environments in mountainous areas that previously produced meter-level errors without problems.
Q: If I have RTK, is an AR marker unnecessary? A: Absolute-coordinate AR using only RTK can achieve high-precision overlays. However, using AR markers together ensures reliable initial alignment and orientation adjustment, enabling more dependable operation. Conversely, AR markers alone cannot provide absolute positions in real space, so combining them with RTK is essential. By combining both, their respective weaknesses are complemented to achieve the best accuracy and stability.
Q: What kinds of sites can this be used at? A: It is used in a wide range of civil and building construction scenarios. Examples include as-built surveying and earthwork volume calculations at development sites, pile-driving and layout-marker placement for roadworks, as-built confirmation of structures in bridge and tunnel construction, and recording disaster site damage—any scene where high-precision position information is required. Tasks that previously required specialist contractors can be quickly performed on site by field staff, greatly contributing to shorter construction schedules and quality assurance. Going forward, RTK×AR surveying using smartphones is likely to become a common tool across diverse sites.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.