What Will Change with BIM/CIM and AR Construction? 6 Ways to Utilize Them on Construction Sites
By LRTK Team (Lefixea Inc.)
Table of Contents
• What are BIM/CIM and AR construction?
• What will change at the construction site with BIM/CIM and AR construction?
• Method 1 Accelerate on-site position verification before construction
• Method 2 Detect interferences between existing and new installations in advance
• Method 3 Reduce differences in stakeholders' understanding and shorten meetings
• Method 4 Make the review of construction procedures and sequencing concrete
• Method 5 Link to as-built verification and record organization
• Method 6 Speed up change handling and sharing of revisions
• Approach to introducing BIM/CIM and AR construction so they function on site
• How to further connect BIM/CIM and AR construction to practical work
What are BIM/CIM and AR construction?
The idea of combining BIM/CIM with AR construction is a method for making the three-dimensional models and attribute information created during design and planning usable in a form that is as close as possible to how they will be used for on-site verification and decision-making. Rather than viewing drawings and 3D models only on an office screen, checking them while overlaying them on the actual site scenery and the appearance of existing structures makes it easier to connect desk-based understanding with on-site perception. This is a major reason why many practitioners today are paying attention to BIM/CIM and AR construction.
BIM/CIM is not simply about creating three-dimensional shapes. Its value lies in making it easy to organize information such as position, elevation, relationships between components, conditions related to construction sequencing, interfaces with existing structures, and the considerations necessary for inspection and maintenance. On the other hand, AR construction plays the role of making that organized information easy to handle on site. In other words, BIM/CIM creates the foundation of the information, and AR construction converts that information into a form that can be used in the field.
At the site, having drawings and three-dimensional models alone is not enough. It is necessary to consider how what was established during the design phase will look in the field, what the spatial relationship to existing structures will be, whether there are issues affecting the ease of work, and how to communicate it so that stakeholders can readily understand. If there is a large gap here, no matter how well the models are prepared, on-site work will ultimately revert to paper drawings and verbal explanations. The purpose of combining BIM/CIM with AR-based construction is to narrow this gap and speed up on-site decision-making.
Also, BIM/CIM and AR construction are not just for special large-scale sites. They can be widely applied in situations where differences in spatial awareness tend to cause problems, such as civil engineering, architecture, equipment, renovation, and maintenance and management. They are especially effective at sites with complex existing structures, sites involving multiple parties including subcontractors, and sites where changes are likely to occur. In practice, it is important to create a situation where everyone on site can easily look in the same direction and confirm things, rather than a situation that only people who are good at reading drawings can understand.
Many practitioners who search for "BIM/CIM AR construction" want to know not just the definitions of the terms but what will actually change on site. Even if they think it sounds useful, it is difficult to move to on-site implementation unless they understand which tasks it affects, what will decrease and what will increase, and where to begin introducing it. In this article, after organizing how sites will change by combining BIM/CIM with AR construction, we explain six specific ways to apply them.
What Will Change on Construction Sites with BIM/CIM and AR?
When BIM/CIM and AR construction are brought onto a site, the biggest changes are in the quality and speed of verification. On conventional sites, teams repeatedly go back and forth between looking at drawings, looking at the site, and returning to the drawings. Experienced staff can mentally assemble how the site will appear from plans and sections, but even so, the more complex the site, the longer verification takes. As the number of stakeholders increases, differences in understanding tend to widen. Combining BIM/CIM with AR construction reduces some of that back-and-forth and makes it easier to confirm design information within the same field of view while looking at the site.
Most of the rework that occurs on site does not arise because there are no drawings, but because the meaning of the drawings is not conveyed the same way in the field. Even when the design team believes they have explained things sufficiently, the construction team may understand them differently, or the management team may focus on different areas. These differences in perception are more troublesome than discrepancies in numbers, because although everyone is looking at the same drawings, each party imagines a different space. AR construction can help close those imagined gaps on site early.
Furthermore, the combination of BIM/CIM and AR in construction is not just about making visuals easier to understand. It has value in that it makes it easier to connect multiple tasks, such as pre-construction position checks, checking interfaces with existing structures, considering work sequences, comparing changes, and sharing images of the finished result. When models are used only in the office, the site ends up relying on different documents or separate explanations. However, when the same information can be used on-site as the basis for verification, the starting points for checks align and work is less likely to become fragmented.
Also, the way explanations and meetings are conducted on site will change. Traditionally, drawings were opened to explain positions and shapes, requiring the other party to mentally map them onto the site. However, when information can be overlaid on the actual site, it becomes easier to share on the spot where things will be placed, how they will look, and where potential problems might arise. This not only makes things clearer, but also reduces the number of explanations and helps move discussions more quickly toward concrete issues.
However, introducing BIM/CIM and AR construction does not automatically change the site. What matters is clarifying which tasks they will be used for, what you want to check, and where they will be used as evidence for decision-making. Systems that appear to be able to do everything tend to have ambiguous uses on site. That is why, when considering what will change on site, you need to focus not on the number of flashy features but on how the verification workflow will change. From here, we will look at six practical applications, in order, that make those changes easy to perceive concretely.
Method 1: Advance on-site position confirmation before construction
One of the most immediately tangible uses of BIM/CIM combined with AR in construction is verifying positions before work begins. Even if you confirm spatial relationships on drawings and models beforehand, the impression can change once you actually visit the site. Problems such as being too close to a walkway, the distance to existing structures being tighter than expected, limited working space, or poor sight lines are difficult to notice on paper. By using AR in construction, you can overlay BIM/CIM information on the site, making it easier to intuitively understand how and where elements will fit in that location.
The advantage of this method is that it reduces back-and-forth between drawings and the site. Traditionally, the workflow required checking positions on the drawings, going to the site to confirm by feel, and then returning to the drawings to review dimensions and conditions. However, when you can overlay models or drawing information on-site, it becomes easier to judge the appropriateness of positions on the spot. Of course, you can't complete all decisions there, but at least you can quickly share whether something feels off. Even this alone makes subsequent revision discussions much easier.
Also, for pre-construction position checks, it is crucial to decide what to use as the reference when overlaying on site. Using reference points that are easy to find on site—such as building corners, ends of existing structures, or intersections of clearly defined grid lines—increases the repeatability of the checks. If the reference remains ambiguous, different people are likely to perceive positions differently, and even when checks are made on site their understandings will not align. To make BIM/CIM and AR-assisted construction work on site, you need to agree in advance on which reference points will be used for verification, before considering how to present the information.
Furthermore, this method of use is also well suited for prior sharing with partner companies and on-site personnel. Even content that takes a long time to explain using drawings alone can be understood more quickly if positions are overlaid and shown on site. In particular, for people who are not in a position to routinely scrutinize drawings in detail, it can be easier to understand design information when seen within the actual site surroundings. When pre-construction position checks proceed smoothly, stakeholders can more easily begin preparing work under the same assumptions, which stabilizes site mobilization.
However, what is important in pre-construction position verification is not the appearance of the AR display, but linking the verification results to the next decisions. If something seems off about the position, organize what is causing it—whether it is the distance to existing structures, the orientation, or the height—and, if necessary, return to the drawings or models to consider corrections. The goal is not merely to be able to see it on site, but to reduce uncertainty before construction and to identify potential rework as early as possible. With this point in mind, BIM/CIM and AR construction become a very powerful means for pre-construction verification.
Method 2 Detect clashes between existing and new installations in advance
The second application is to detect clashes between existing and new installations in advance. On construction sites, the more complex the interfaces with existing structures are, the higher the risk of rework. Even if dimensions appear to work on the drawings, when seen on site there may be insufficient clearance, tight angles, or not enough space for the required work. By combining BIM/CIM with AR construction, the positional relationship between existing and new elements becomes easier to see within the actual space, making it easier to spot potential clashes early.
What’s important in this situation is not trying to check everything at once. When checking for clashes between existing and new installations, it’s more effective to focus on locations where problems are likely to occur. Prioritize areas near walkways and work routes, places where equipment is densely clustered, locations that require inspection clearances, and spots where constraints are likely to change depending on construction sequence; doing so makes it easier to catch critical issues even with limited time. AR-assisted construction is not only a tool for displaying information but also becomes more valuable when used to narrow the scope of what to check.
Also, clash checks between existing and new installations have the advantage of making it easier for all stakeholders to share any sense of incongruity that is difficult to convey with drawings alone. Even if the design side believes the dimensions work, from the construction side the work sequence may be impractical. From the management side, there may be insufficient space for operation and maintenance. Being able to discuss while looking at the same spot on site makes it easier to talk about what the problems are on a shared premise and improves the quality of meetings.
Moreover, this use is also effective because it allows you to prepare materials for considering changes in advance. If you notice interference after construction has begun, changes to sequencing and readjustments will have a much greater impact. However, if you can detect signs of interference on site before construction, you can more calmly consider layout changes, angle adjustments, and revisions to construction procedures. The essence of this approach is not so much to eliminate problems as to find them before they grow larger.
One thing to be careful of when checking for interferences is not to draw conclusions based solely on apparent proximity. Things that appear close in AR do not necessarily pose a construction problem. What matters is to assess how that proximity will affect constructability, safety, and maintainability. Making BIM/CIM and AR effective on site is not simply a matter of overlaying models, but of turning the insights gained from those overlays into practical decisions. Checking for interferences between existing and new installations is one of the clearest ways this value is demonstrated.
Method 3 Reduce differences in stakeholders' understanding and shorten meetings
The third way to use it is to reduce differences in stakeholders’ understanding and shorten meetings. On site, many people in different roles—design staff, construction management, workers, subcontractors, and clients—discuss the same matters. However, even when looking at the same drawings, the points they emphasize and the ways they understand them differ. As a result, something that seemed to be understood in the meeting room can be interpreted differently on site. Using BIM/CIM and AR construction on location makes it easier to bridge these gaps in understanding on the spot.
When you explain using only drawings, listeners must mentally convert plans and sections into three-dimensional forms. The greater the differences in experience, the more variation there is in the accuracy of that conversion. With AR-assisted construction, models and design information can be overlaid on site, making it easier to share on the spot where things will go and how they will look. This reduces the need for preliminary explanation and makes it easier to move discussions quickly to concrete points of discussion.
Also, in meetings, discussions about locations, interference, workability, and maintenance tend to get mixed together and the points of discussion often broaden. When AR-assisted construction is used on site, it becomes easier to visually share what is being checked at the moment, so topics are less likely to scatter. Because everyone can see on the spot from the same perspective which locations are in question and which conditions are most restrictive, the meeting becomes more focused.
Furthermore, to shorten on-site meetings it is important to decide beforehand which places to look at and in what order. If you show everything indiscriminately, each stakeholder will focus on different issues and the conversation will expand too much. By clarifying which positions to view, what to check, and what falls within the scope of the conclusions, AR construction can more readily function as a practical tool to streamline meetings. This not only makes things easier to understand but also has significant value in changing how time is used.
However, you must not make shortening meetings the goal in itself. What matters is not ending with insufficient explanation, but quickly completing the necessary alignment of understanding. BIM/CIM and AR construction are highly effective means of creating a common understanding in a short time, but they only work if the items to be checked and the standards have been organized in advance. If you truly want to improve on-site meetings, it is as important to clarify what you want to share as it is to devise better ways of presenting information.
Method 4: Detail the construction procedures and sequencing
The fourth way to utilize it is to concretize the examination of construction procedures and sequencing. The three-dimensional models of BIM/CIM can be used not only to check the finished form but also as a basis for considering which construction sequence would be least problematic and where work is likely to bottleneck. Furthermore, combining AR construction makes it easier to review those planning results while viewing them within the actual on-site space. This makes it easier to assess in advance whether the scheduling planned at the desk will actually function on site.
On site, even if something is feasible on the drawings, the way workspaces are arranged, where materials are stored, the movement paths of heavy equipment and tools, and interference with temporary structures can make it preferable to change the actual construction sequence. These issues are hard to notice from plan views alone and are often only discovered only at the site. By overlaying information on the site with AR construction, it becomes easier to imagine not only the final positional relationships but also what kinds of constraints might arise during the intermediate stages.
In addition, when reviewing construction procedures, the experience of on-site personnel plays an important role. This is because there are on-the-ground realities of the work that cannot be seen from models created by the design side. Therefore, the value of using BIM/CIM and AR construction lies not in showing the model, but in linking on-site knowledge to the model and turning it into concrete decisions. Being able to exchange views while looking at the actual site makes it easier to see the most practical sequence of tasks and which areas should be tackled first.
Furthermore, concretizing the sequence of operations also leads to improved accuracy in pre-construction preparations. If you can share early on where temporary works are required, which tasks should be prioritized, and which locations will become coordination points with other trades, it becomes easier to reduce confusion after work begins. This directly contributes to stabilizing the schedule. BIM/CIM and AR-assisted construction not only make drawing checks easier but also serve as resources for proactively advancing the construction preparations themselves.
The important thing with this approach is not to focus solely on the finished result. Because construction often remains in intermediate states for long periods, you need a viewpoint that looks for potential problems during those stages. Using AR in construction makes it easier to imagine not only how things will look after completion but also the constraints that will occur during work. On sites where you want to make sequencing and setup planning more concrete, simply adopting this perspective can greatly change the quality of preparation.
Method 5: Linking to As-Built Verification and Record Organization
The fifth application is linking it to as-built verification and record organization. BIM/CIM and AR construction tend to focus on pre-construction and during-construction checks, but they also work well with as-built verification. By organizing what the condition was after construction and making it easier to check the relationship with drawings and models, later explanations and reviews become easier. On site, not only the construction itself but also how to organize inspection results and records is a significant operational burden.
One reason as-built verification becomes burdensome is that the judgments made at the time of construction and those made at the time of inspection tend to be disconnected. If what criteria were used before construction, what adjustments were made on site, and what was being paid attention to are not recorded, only the bare results remain when viewed later. As a result, it becomes difficult to understand why a particular detail ended up that way and which locations were the primary focus of inspection. By using BIM/CIM and AR-based construction to link the verification workflow, it becomes easier to carry that context into as-built verification.
Also, the things confirmed while sharing how the site looked directly feed into record organization. If you can retain what the checkpoints were, where changes were made, and what each stakeholder prioritized, it will make later explanations easier. On site, a large amount of organizing work can remain after the work is finished, but if interim confirmations are preserved in an organized form, creating the records will be easier.
Furthermore, being mindful of the connection with as-built verification improves the quality of pre-construction checks. This is because when you record things with the expectation that they will be reviewed later, it becomes clear which information should be retained. If on-site anomalies you noticed, locations of changes, how reference points are established, and so on are not treated as one-off matters, they can be more readily applied to the next site or the next process. This is important not merely for record-keeping but also for accumulating on-site knowledge.
In this use case, it is important to adopt the perspective of using AR construction not as a feature to show off but as part of verification work. Rather than using it only before construction and stopping there, if it connects through to as-built verification and record organization, the value of BIM/CIM is further enhanced. Turning each on-site check into retrievable evidence for later review is essential for embedding BIM/CIM and AR-assisted construction into everyday practice.
Method 6 Speed up change handling and sharing of fixes
The sixth application is to speed up change response and the sharing of revisions. On-site, changes may be introduced midway due to reviews of design conditions, responses to site conditions, or the convenience of construction procedures. What becomes a major burden in such cases is not the change itself but the time it takes for all stakeholders to understand how that change will affect the site. By combining BIM/CIM with AR construction, it becomes easier to compare the differences before and after changes on-site and to grasp the scope of their impact.
When tracking changes using only drawings, you have to decipher the revised areas and mentally convert how they will look on site. This work takes time even for experienced people, and different stakeholders tend to end up with different understandings. With AR construction, you can overlay the updated information on the actual site as you check it, making it easier to share on the spot what has changed and what might become an issue. This is highly meaningful for speeding up the ramp-up when changes occur.
Also, when change responses are faster, it becomes easier to limit their impact on the process. On site, when changes occur, work tends to stop while waiting for confirmations or explanations. However, if the way changes are presented can be shared on site, it becomes easier to organize which areas should be prioritized for review and which stakeholders should be consulted. This is not about eliminating changes, but about creating a site that is less likely to be disrupted when changes occur, which is important.
Moreover, this way of using it makes the approach to update history critical. If it isn’t clear what changed when, which version should be used on-site, or which conditions are to be treated as official, then even comparing things with AR will cause confusion. The ability to compare before-and-after changes and the organization of official information should be considered together. To leverage BIM/CIM and AR in construction practice, not only the visualization technology but also the update workflow must be well established.
Using them to speed up responses to changes and the sharing of corrections leads to operations that are resilient to on-site changes. Construction does not always proceed as planned. That is why, when changes occur, it is important to have mechanisms that enable rapid understanding and lead to the necessary decisions. BIM/CIM and AR construction provide value not only in what is visible on site but in how easily they help align understanding there.
Approach to Introducing BIM/CIM and AR Construction so They Function On-site
We have examined six ways to apply them so far, but to make them truly effective on-site, the method of implementation is important. Just because something seems convenient, if you try to expand it immediately to all sites and all processes, the preparatory burden will become conspicuous and it will often be perceived as difficult to use in the field. If you want to establish BIM/CIM and AR construction, it is important to start with the situations where the effects are most visible. For example, locations with tight coordination against existing structures, situations that require lengthy explanations to stakeholders, and processes that involve many change responses are where you can most readily feel the benefits of introduction.
Also, when introducing it, it is essential to clarify what you want to check. Whether it is position verification, interference checking, consideration of construction procedures, or visualization for explanations, the necessary data and the way it is presented will vary. Rather than aiming from the start for a system that can do everything, narrowing the verification targets by use case makes it easier to use on site. In practice, what adds value is being able to quickly perform the checks needed now, rather than being multifunctional.
Furthermore, standardizing how reference points are established on-site is another key point when introducing AR. If people differ on which position to use as the reference, which viewpoint to view from, or what to look at to determine correctness, the appearance of AR-assisted construction will not be consistent. A system whose appearance is unstable will be hard to trust on site, even if it seems convenient. When introducing it, effort should be focused on unifying the verification conditions before the display functions.
Also, it is important to treat usability complaints from the field as material for improvement. Comments such as "hard to see," "standards are unclear," "there is too much information," and "changes are difficult to track" do not mean that the field is rejecting new technologies, but rather that they are asking for adjustments to make them fit actual work practices. The better operations are at capturing and addressing this feedback, the more likely BIM/CIM and AR construction are to become established on site.
The most important principle when introducing BIM/CIM and AR construction is not to treat them as special events. They will only be used continuously on site once they are made to naturally fit into daily checks, meetings, comparisons, and sharing. Reducing daily uncertainty has more value on site than flashy presentations. If you want to succeed in implementation, think in terms of how much you can reduce on-site anxiety and waste, rather than the appeal of the technology.
How to further connect BIM/CIM and AR construction to practical field operations
By combining BIM/CIM with AR-assisted construction, the site is transformed in many ways: pre-construction position checks, interference checks with existing structures, aligning understanding, concretizing construction procedures, linking with as-built verification, and faster response to changes. What is common is that the value that does not arise from merely having drawings or models only appears when it is tied to on-site verification. The value of BIM/CIM lies in organizing information, and the value of AR-assisted construction lies in making that information usable on site. When these two are connected, the divide between the desk and the site shrinks, and the quality of on-site decision-making improves.
One point to keep in mind is that speeding up on-site checks does not mean rushing the act of checking. What actually consumes time on site is redoing explanations each time, re-checking because of differences in understanding, waiting for comprehension when changes occur, and delays in noticing inconsistencies with existing installations. BIM/CIM and AR construction have the ability to reduce these hard-to-see losses and accelerate the initiation of decision-making. In other words, when the site changes, we should think of it not as operations becoming new but as hesitation being reduced.
Furthermore, if you want to take this further into practical work, don’t stop at merely visualizing AR construction; organizing the approach to position confirmation and localization as well will increase its effectiveness. After overlaying and interpreting design information on site, there are many situations where you will want to handle those positions more reliably. In particular, when you want to improve on-site reference checks or the reproducibility of positions, it is important to connect understanding of drawings and models with the handling of positional information.
When considering such operations, options include means to incorporate high-precision positioning in a form that is easy to handle on site, such as LRTK (iPhone-mounted GNSS high-precision positioning device). If BIM/CIM and AR construction can speed up spatial understanding and, when necessary, link through to high-precision position verification, the value of on-site use is likely to increase further. When viewing drawings, overlaying them on site to understand the space, and checking required positions can be treated as a single workflow, BIM/CIM and AR construction will function more strongly not just as a new way of presenting information but as a mechanism to advance on-site operations.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.