Solving BIM/CIM Challenges! LRTK’s Real-Time Linkage Technology Connecting Field and Design
By LRTK Team (Lefixea Inc.)
What are BIM/CIM? Adoption Status in Japan
BIM/CIM are approaches that utilize 3D models to centrally manage information across the entire lifecycle of construction projects. BIM mainly refers to the technique in the architectural field that consolidates building information into 3D models from design through construction and maintenance. CIM is the applied concept of BIM promoted by the Ministry of Land, Infrastructure, Transport and Tourism for civil infrastructure, aiming to improve efficiency in planning, design, construction, and maintenance of civil structures such as bridges, roads, and dams using 3D models. In recent years, BIM/CIM has attracted attention as part of the industry’s DX (digital transformation) strategies, with expected benefits for construction efficiency and quality improvement.
In Japan, adoption of BIM/CIM has accelerated under the leadership of the Ministry of Land, Infrastructure, Transport and Tourism. From fiscal 2023, the ministry began principal application (de facto mandatory use) of BIM/CIM for national government-led public works. The policy states “BIM/CIM should be used in principle unless there are special circumstances,” and application started with certain direct government projects and duties, with phased expansion to municipal and private projects planned from fiscal 2024 onward. The ultimate goal is to mandate BIM/CIM use across all public projects, making timely responses urgent in the construction industry. The ministry is also supporting adoption by preparing standards, manuals, and guidelines for BIM/CIM use and publishing related information on a portal site. Against this backdrop, many construction and civil engineering firms have begun adopting and utilizing BIM/CIM, and Japan’s construction sites are entering a major period of change.
Main Challenges Faced When Introducing BIM/CIM
While BIM/CIM are groundbreaking technologies, several challenges arise when introducing them on site. Key hurdles include discrepancies between surveying (field surveys) and design data, difficulty in real-time information linkage between field and office, and insufficient data compatibility.
• Discrepancies between surveying data and design models
There can be mismatches between surveyed data measuring site topography and structures and the 3D design models created in the office. For example, differences in survey accuracy and design model precision can cause structural elements to appear buried in the ground or leave gaps in the model. Traditionally, surveyors would measure key points on site after construction and compare them with drawings to confirm as-built conditions, but if survey and design data are not linked in real time, small discrepancies may be discovered late and lead to rework. The “separation between field and design,” where survey results cannot be timely reflected in design models, is a major concern when implementing BIM/CIM.
• Difficulty of real-time linkage with the field
Even if BIM/CIM models are available, they cannot deliver full value without a mechanism to smoothly share information between the field and the office. If exchange of 3D data and drawings between different departments and partner companies is delayed, misunderstandings, construction errors, and schedule delays may result from communication failures. In particular, if the latest surveying information obtained on site (as-built data or construction progress) does not reach designers and construction managers in real time, decision delays and missed data updates are likely. Traditional methods—bringing paper drawings or USB data back to office PCs—cannot immediately reflect field changes in models, undermining the responsiveness that BIM/CIM should provide.
• Data compatibility and information-sharing issues between software packages Creating and using BIM/CIM models requires specialized software, but because different companies and fields use different software, low data compatibility becomes a problem. For example, importing point cloud data or terrain models from surveying into design BIM software may be time-consuming due to incompatible formats, or transferring models created in design to construction management systems may fail to carry over information properly. There are still voices saying that “creating BIM/CIM models that are compatible across different software” has not been sufficiently achieved, and trial-and-error is needed for data linkage. Additionally, BIM/CIM software itself tends to be highly functional and complex to operate, and the limited pool of specialists is another barrier to adoption.
As described above, overcoming three main issues is critical to utilizing BIM/CIM on site: closing the data gap between surveying and design, enabling real-time information sharing between field and design offices, and creating an environment where data does not break between heterogeneous software and devices.
What is LRTK, the Solution for Field Challenges?
LRTK is attracting attention as a field solution that addresses the above challenges and maximizes the benefits of BIM/CIM. LRTK is a pocket-sized versatile surveying tool developed by Reflexia, a startup originating from Tokyo Institute of Technology. It is used by attaching a compact RTK-GNSS receiver to a smartphone or tablet. With a single palm-sized device, centimeter-level accuracy (half-inch accuracy) GNSS positioning using RTK becomes possible, enabling high-precision position measurement, 3D scanning on site, and even AR display of design data—all in one device. Where traditional methods required expensive surveying equipment and expert knowledge, LRTK is designed to make such tasks easy for anyone. In this sense, LRTK is a revolutionary solution that strongly promotes field DX (digitalization).
LRTK Phone receiver attached to a smartphone performing high-precision positioning and scanning on site. Measurement data are shared to the cloud in real time, allowing instant confirmation of conditions from the office.
LRTK’s greatest feature is real-time linkage. Position and measurement data acquired by the ultra-compact RTK-GNSS receiver attached to an iPhone or iPad can be uploaded to the cloud on the spot and shared immediately with office staff. All information measured on site can be sent to the web cloud from the LRTK app with a single button, and staff in remote offices can immediately view the latest field data by opening a web browser. For example, point cloud data or high-precision photogrammetry images obtained on site with LRTK are saved to the cloud the moment they are captured, and designers in the office can check the latest site conditions in 3D from their desks. This dramatically eliminates the traditional hassle of “bringing measurements back, drafting drawings, and preparing reports,” enabling decisions and design adjustments based on up-to-date information at all times.
Another major strength is ease of use and responsiveness. LRTK is designed to minimize complex settings and coordinate alignment in the field. Attach the receiver to a smartphone, launch the dedicated app, and it automatically acquires correction information and begins RTK positioning. Then walk to the location to be measured and follow the on-screen guidance to move the smartphone; you can obtain a 3D model of the surroundings via point cloud scanning or perform layout based on design drawings (such as marking stake positions). Traditional surveying required setting up tripods and total stations or experienced personnel to establish control points—tedious preparations. LRTK’s software handles such technical knowledge and experience for the user, making it easy to operate even for non-experts, so anyone on site can become capable of high-precision data measurement. This is a significant advantage in the construction industry, which is facing labor shortages and an aging workforce.
Furthermore, LRTK supports CLAS, the centimeter-level correction information distributed by “Michibiki,” Japan’s positioning satellite system (quasi-zenith satellite), allowing high-precision positioning even at sites without internet connectivity, such as mountainous areas. Because it is a high-performance GNSS receiver supporting three frequencies, it can achieve stable RTK positioning even in environments without base stations, enabling real-time linkage at any site.
Thus, by combining “smartphone + RTK positioning + cloud,” LRTK guides the resolution of various challenges encountered when implementing BIM/CIM from the field side. The next chapter looks more concretely at how LRTK enables real-time surveying data acquisition and immediate reflection into BIM/CIM models.
Real-Time Surveying Data and Immediate Reflection into BIM Models with LRTK
By using LRTK, the site “now” can be instantly digitized and reflected in BIM/CIM models. For example, if you scan embankments or excavation areas at an earthwork site using an LRTK-compatible smartphone, a 3D point cloud model is generated on the spot and volumes are automatically calculated. From the start of positioning to point cloud generation and volume calculation, everything is completed in real time, and results are displayed immediately on the device screen, enabling site supervisors to promptly assess over- or under-excavation based on that data. Point cloud data and geotagged photos captured are uploaded to the cloud, so the office can overlay the latest as-built data with design models for verification. On a cloud platform, overlaying design drawings or 3D models with current point clouds allows real-time checking of whether structures under construction are deviating from the design. If any part differs from the design, it is immediately visible on screen, enabling instant feedback to the field and instructions for correction. Whereas as-built inspections were traditionally done by sampling after construction, LRTK enables comprehensive inspections by digitally measuring the entire site and comparing it with the model as needed.
LRTK’s real-time linkage also dramatically improves the speed and accuracy of information sharing among stakeholders. Because surveying data are shared instantly via the cloud, all project participants—owners, designers, and contractors—can always reference a single source of the latest data. This reduces the likelihood of misunderstandings such as “the site changed this part of the drawing, but the designer was looking at an old model and gave instructions.” With 3D models and field data integrated and managed on a common cloud platform, true collaboration using BIM/CIM information across departments and companies becomes possible. LRTK thus functions as a real-time linkage technology that bridges field and office, physical and digital, maximizing the value of BIM/CIM.
Comparison with Other Surveying Instruments and Solutions (Cost, Usability, Speed)
When considering LRTK adoption, you will naturally compare it with existing surveying instruments and solutions. The main differences in terms of cost, usability, and work speed are summarized below.
• Cost
Traditional high-precision surveying instruments (GNSS receivers, 3D scanners, etc.) have been very expensive. For example, a domestic manufacturer’s high-precision GNSS receiver had a suggested retail price set at about ¥1,350,000 (tax included), making it a high barrier for small and medium enterprises. In contrast, LRTK is a compact device that can be used with commercially available smartphones and tablets, replacing multiple pieces of equipment that used to be purchased separately—GPS receiver + data collector + dedicated software. Official pricing is typically available by inquiry, but because far fewer devices are required, initial deployment costs are expected to be greatly reduced. The ability to start surveying using an existing smartphone without expensive dedicated equipment is a major advantage.
• Usability
Traditional surveying instruments required specialized skills for setup and operation. Installing a total station, conducting surveys with multiple personnel, and complex settings in dedicated software are often difficult without experienced staff. LRTK, however, is designed with “anyone can use it” in mind. As noted earlier, attaching the receiver to a smartphone and launching the app starts positioning, and intuitive operation—moving the device according to guidance—enables measurement and stakeout. By minimizing complex functions and settings and handling automatic control and correction in software, non-specialists can use it as an immediate asset. Allowing field workers to survey and check with their own smartphones lets tasks that used to rely heavily on specialized surveying departments be completed smoothly within the field.
• Speed The speed from surveying to design reflection is also significantly improved. With conventional methods, it was not unusual for it to take days to weeks to bring field data back, process it on a PC, and reflect it in drawings or models. With LRTK, survey results are available the moment they are measured and can be shared and reflected via the cloud immediately. For example, at one site, layout work that used to take half a day was completed quickly using LRTK + AR, and human errors were greatly reduced. Because coordinates can be measured in real time and verified directly on the model, the cycle of decision-making and rework is dramatically accelerated, leading to potential schedule reductions and fewer night shifts, improving safety and productivity.
In summary, compared to other options, LRTK offers low-cost deployment, simple operation, and fast results—a winning combination. It also has the flexibility to be used in combination with other advanced surveying technologies (e.g., drone photogrammetry and high-performance 3D scanners) to comprehensively cover everything from wide-area terrain measurement to detailed construction management. It is truly a “small device with big results.”
Future Prospects for BIM/CIM and the Importance of Real-Time Technology
As BIM/CIM adoption advances, the importance of real-time technology will only grow. This is driven by industry-wide needs to improve productivity and address labor shortages. To deliver high-quality construction with limited personnel, it is necessary to fully leverage digital technologies for efficiency. Initiatives advocated by the Ministry of Land, Infrastructure, Transport and Tourism, such as i-Construction and Construction DX, emphasize labor-saving and sophistication through ICT, making field automation and real-time operation an unavoidable trend.
In Japan, an aging workforce and a shortage of skilled workers are serious challenges, and the decrease in manpower and experienced technicians is frequently voiced. In this context, the key to dramatically increasing productivity lies in the integration of BIM/CIM with real-time positioning and measurement technologies. Combining point cloud data, RTK positioning, and CIM models is proving to enable process efficiency, quality improvement, and cost reduction. Digital measurement and 3D model utilization can reduce labor-intensive tasks while increasing accuracy and reliability. If field and design information can be synchronized in real time, rapid responses to design changes, immediate as-built inspections, and automated recording of construction will transform construction and maintenance management.
In the future, BIM/CIM use is expected to become standard not only in public works but also in private architectural and civil engineering projects. Along with this, the use of “digital twins”—virtual spaces synchronized with the real world—will expand. Real-time linkage technology is the foundation for realizing digital twins: by reflecting the latest information from sensors and positioning devices into BIM/CIM models in real time, a digital twin of the site at this very moment can be created. This enables remote monitoring and instruction, AI-driven automatic analysis and feedback, and opens the path to automation and unmanned construction.
Real-time high-precision positioning devices like LRTK will become indispensable in such future construction sites. From small sites to large-scale projects, the ability to obtain accurate real-time field data may determine project success. Creating advanced digital models with BIM/CIM is meaningless if they cannot be utilized on site. Conversely, maintaining continuous synchronization between field and model can dramatically reduce waste and mistakes across the entire construction process. Real-time linkage technology will increasingly serve as the engine that unlocks the true value of BIM/CIM.
Conclusion: An Easy Surveying Experience with LRTK
We have seen how LRTK, emerging as a new field tool in the BIM/CIM era, can solve many problems as a “bridge between field and design.” Here is a concise anecdote that captures its appeal.
At an earthwork site, a person in charge used to measure dozens of points with a total station, create cross-sections, and spend more than half a day calculating volumes. After introducing LRTK, simply walking across the embankment with a smartphone automatically generated a 3D model and computed the volume in just a few minutes. Data were shared to the cloud instantly, so office engineers could confirm results in real time and reach quick agreement—“the height matches the design.” The person in charge said, “It felt like a game and was intuitive, yet the results were surprisingly accurate and report preparation was almost automated.” LRTK turns surveying work that once required expertise into an approachable, simple experience.
To maximize BIM/CIM benefits, field DX is essential—and the key to DX is using real-time linkage technology. Seeing is believing: a system that shares the field “now” directly will directly lead to true productivity improvements more than a hundred reports. If you want to reduce discrepancies between design and field, streamline surveying, or instantly grasp the latest construction status at your site, try LRTK’s smart surveying. The ease of starting with just a smartphone belies the transformative impact it can have on your site.
In the BIM/CIM era, technologies that connect field and design in real time are becoming necessities rather than gimmicks. LRTK, as a leading example, has the power to evolve your site to the next stage. In the construction sites of the future, digital and real will seamlessly merge so anyone can make accurate decisions instantly. As a first step, consider starting real-time surveying with LRTK and experience the new value that arises when field and design are connected.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.