4 Steps to Perform Interference Checks on Buried Pipes with Point Clouds | Reduce Design Changes

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Introduction

On infrastructure construction sites, it is not uncommon for buried underground pipes (water and sewer pipes, gas pipes, etc.) to force design changes. When attempting to lay new piping, existing pipes that were not on the drawings are sometimes found and the route is hurriedly changed, or interferences that could not have been anticipated at the design stage are discovered during construction and the schedule is extended—many engineers will be familiar with such experiences. If the positions and elevations of buried pipes are not known accurately in advance, unexpected clashes or interferences can occur during construction, resulting in redesigns or additional work. Because such design changes contribute to higher project costs and schedule delays, they should be minimized as much as possible.


As background, information about underground buried utilities is often incomplete. When relying on old drawings or records, past construction changes may not have been reflected, and the actual position and depth of pipes often differ from what is shown. There are also cases in which pipes newly installed or relocated by other works have been overlooked on the drawings, and the presence of obstacles is sometimes only discovered once teams enter the site. These uncertainties have been one of the causes of unexpected clashes and design changes.


So how can we prevent interference with buried pipes in advance and reduce design changes? One solution attracting attention is interference checking using point cloud data. A point cloud is a three-dimensional representation of site conditions created from countless measurement points (points), and its use has been expanding in the civil engineering field in recent years thanks to ICT technologies and the promotion of i-Construction. Furthermore, as BIM/CIM adoption advances, the practice of reviewing and coordinating using 3D models from the design stage is becoming established. If a 3D model of buried pipes is created in advance and shared among stakeholders, mistakes caused by differences in understanding can be prevented and planning accuracy can be improved. Point clouds can make the existing terrain and buried objects—which could not be fully grasped from traditional planar drawings or a limited number of survey points—visible as they are in three dimensions. By comparing the positional relationships between the planned new piping and existing buried pipes on that data, interference locations can be identified before construction and reflected in the design in advance.


In this article, we explain practical procedures in four steps to check for interference of buried pipes using point cloud data and to reduce design changes. Beginning with methods for acquiring point clouds using terrestrial laser scanners, UAV-mounted LiDAR, smartphone LiDAR, and RTK-GNSS receivers, we provide a detailed walkthrough of the entire process: modeling buried pipes from the acquired point clouds, comparing them with new and old design information, detecting interference locations, and carrying out design revisions. We also include practical tips for minimizing design changes and highlight points that are useful on site. Now, let’s dive into the first step.


1. Acquisition of Point Cloud Data (High-precision 3D Measurement of Existing Conditions)

The first step in interference checking is to measure the current site conditions completely in three dimensions and acquire them as point cloud data. This allows you to accurately grasp the terrain, structures, and arrangement of other equipment surrounding buried pipes. Areas that were unclear because conventional surveying could only measure certain spots as points can be captured as surfaces and in three dimensions with point clouds, greatly reducing the risk of discovering an "oversight" later.


Various measurement methods and tools are used to acquire point cloud data. A representative example is high-precision field measurement using a ground-based 3D laser scanner mounted on a tripod. With this, you can scan surrounding structures and terrain in a short time with millimeter-level precision (mm; approximately 0.04 in), and if there are exposed parts of buried pipes (manholes or access points, etc.), you can capture their details thoroughly. For capturing wide areas at once, LiDAR mounted on a UAV (drone) is also effective. From the air, it can acquire ground point clouds with accuracy on the order of several centimeters (cm level accuracy; half-inch accuracy), allowing you to quickly grasp the terrain and feature layout of roads and entire sites. Furthermore, photogrammetry can also be used to generate point clouds. Software can generate point clouds from images taken by drone aerial photography or single-lens cameras, which is effective for broad-area terrain understanding. However, because you cannot directly photograph underground piping itself, it is necessary to combine this with other methods to obtain the positions of buried pipes.


A growing trend in recent years is the convenient acquisition of point clouds using smartphones' built-in LiDAR and cameras. By using dedicated apps or additional sensors, field personnel can pinpoint-scan the necessary locations. For example, during open-cut construction when buried pipes are exposed, holding up a smartphone to capture them makes it possible to record the pipe's position and shape as 3D data. Smartphone-based measurements are limited in range, but they are highly effective in places where large equipment cannot easily enter, such as piping in narrow trenches or inside pits.


In addition, various measurement instruments are also used on site, such as handheld laser scanners that use SLAM technology and vehicle-mounted mobile mapping systems (MMS) that can measure terrain while driving. Depending on the conditions at the site, it is advisable to select the appropriate tools and efficiently acquire point clouds.


An essential point when using acquired point cloud data for interference checks is to acquire and register the data in the same coordinate system as the new design plan. Even a thoroughly measured point cloud cannot be correctly overlaid with the design model if it does not match the coordinate system of the design drawings (for example, a planar rectangular coordinate system or an arbitrary local coordinate). Therefore, high-precision positioning (georeferencing) is indispensable. If known control points exist on site, measure them before and after the point cloud survey and incorporate them into the point cloud coordinates. Even when there are no control points, measuring multiple positions with an RTK GNSS receiver and applying them to the point cloud makes it possible to position the entire dataset with accuracy within a few centimeters (within a few inches). Recently, it has become easy to use compact GNSS devices that attach to smartphones to obtain centimeter-level position information (cm-level accuracy, half-inch accuracy) in real time during measurement. By acquiring point cloud data aligned with geographic coordinates in this way, subsequent comparison work with design data will proceed smoothly.


Note that during measurements it is important to arrange equipment and design flight paths to cover the entire target area and collect data with no blind spots. For ground-based laser scanning, move the scanner as needed to ensure overlap in the field of view, and for drone surveys, supplement areas shaded by buildings or trees from alternative angles to minimize omissions. High-precision, comprehensive point cloud data obtained through careful planning is the reliable foundation for interference checks.


2. Modeling of Buried Pipes (Extracting Existing Pipes from Point Clouds)

Once point cloud data has been acquired, the next step is to identify the portions that represent buried pipes and model them. Raw point clouds are collections of countless points, so it is difficult to intuitively grasp a pipe’s position or diameter as-is. Therefore, the shape of the buried pipes depicted in the point cloud is interpreted and converted into 3D models (lines or surfaces) that are easy to handle in design software. This allows the accurate layout and dimensions of existing pipes to be organized as digital objects, making subsequent verification tasks much easier.


Modeling methods vary depending on site conditions and the tools used, but the basic idea is "trace the pipe on the point cloud to reproduce its shape." For example, if part of a pipe appears in the point cloud scanned at an open-cut site, you can estimate the pipe's centerline and cross-section positions from that set of points and place cylindrical or pipe-like objects. Even if the exposed length is short, if the positions of both ends and the gradient are known, the pipe's path can be completed by connecting them. Also, if manholes or riser pipes can be identified in the point cloud, their position and elevation can be used as references to estimate the route of existing pipes. If past as-built drawings or piping plans are available, it is also effective to compare that information with the point cloud to improve model accuracy. By combining measured data and drawing information, a more plausible existing pipe model can be obtained.


When modeling, it is also important to accurately reflect the pipe diameters and shapes. If the pipe outline can be identified from the point cloud, measure the diameter directly and incorporate it into the model. Even when identification is difficult, if the pipe type is known you can reproduce approximate volumes by assigning standard pipe diameters. As needed, perform additional field measurements to supplement information that the point cloud could not capture, such as the depth of buried pipes and their positional relationship to surrounding structures. The finished as-built pipe model can be a simple linear representation, but it is prudent to verify it on a 3D view together with the surrounding ground and structures. Overlay it with the entire point cloud dataset to confirm the model matches the actual measurements and is ready for interference or clash checking. Recently, point-cloud processing software has started to include functions that automatically detect piping shapes and assist in modeling. However, do not rely entirely on automatic extraction; ultimately, a person should visually confirm the model shape and make corrections as necessary.


3. Verification of the Existing Pipe Model and the New Installation Plan (Interference Check)

Next, overlay the completed existing-pipe model with the design data for the newly planned piping and structures to check for clashes. If the point cloud and the existing-pipe model are correctly registered, simply placing the new lines from drawings or CAD data into the same space allows you to verify their positional relationship in 3D. The strength of the point cloud + model approach is that you can accurately determine in 3D whether they clash vertically even if they don’t intersect on a plan view, or conversely, whether apparent overlap in a top-down projection still has sufficient depth clearance (separation).


As a specific method for clash detection, the basic approach is to visualize both datasets in a three-dimensional (3D) view and visually look for intersection points and close proximities. If any suspicious areas are found, you create sectional views to examine vertical relationships in detail, or measure distances between models to confirm that clearances meet the required standards. For example, if a new pipe passes directly above an existing pipe, check whether the required soil cover thickness and the thickness of any buffer material between them are being satisfied. Also check whether the new pipe is too close to the foundations of existing structures or other equipment. Dedicated software can automatically detect and list clash locations, but ultimately it is important for the designer to judge whether an adequate allowance has been provided. If clearances are borderline, taking into account that there may be some errors in the point cloud or design data, a decision to adopt a more conservative design is also necessary. Because the point cloud clarifies the actual positions of buried objects, you can often notice problems that drawings alone would not reveal, allowing you to identify potential clashes in the manner of "virtually constructing in the data" ahead of time.


Because the acquired point cloud data also includes ground surface elevation information, it can be used to verify whether the burial depth of newly installed pipes (cover from the ground surface) can be ensured as planned. In particular, on undulating terrain, even if you believe you have secured sufficient depth on the drawings, some sections may end up with inadequate cover. By using the point cloud to compare the pipe crown elevation for the entire length with the ground surface, such oversights can be prevented in advance.


4. Detection of Interference Points and Design Corrections (Reduction of Design Changes)

Once the interference locations are identified, promptly revise the design based on that information. If the new pipe would cross or contact existing buried pipes or other obstacles, change the piping route or elevation at the design stage to ensure sufficient clearance. For example, you might shift the new route by several meters (several ft) to bypass the existing pipe, alter the pipe gradient to increase depth at the crossing, or change the diameter to place the pipe along an alternative route. Because the point cloud provides a three-dimensional understanding of on-site constraints, these alternatives are easier to evaluate in the data, making it simpler to find the optimal solution. If it is structurally impossible to achieve adequate separation, you will need to reduce risk by installing protective measures on the existing pipe or by adjusting the construction sequence.


When making design revisions, it is essential to organize the cause and countermeasures for each clash point and share them among stakeholders. Overlay the revised design proposal onto the existing 3D model again to confirm that the issue has been resolved. If necessary, perform additional clash checks to verify that no other parts are affected. By going through this series of revision processes, unexpected design changes during the construction phase can be greatly reduced. If clash risks are eliminated in advance, on-site work can proceed "in accordance with the drawings", minimizing losses due to additional work or rework.


For example, on a sewer pipe installation project, an interference check using point clouds enabled the prior discovery of an existing water main that was shallowly buried directly beneath the planned route. By slightly adjusting the route of the new pipe during the design phase to ensure sufficient separation, the risk of damaging the water main during construction was avoided, and the work on site was completed as originally designed. If it had not been identified in advance, the water main could have been damaged during excavation, causing local water outages and emergency repair work. In this way, using point clouds to identify interference points early and implement countermeasures leads to safe, smooth construction that prevents design changes from occurring during the construction stage.


Moreover, the results of interference checks using point clouds provide valuable insights that will benefit future projects. Information on clashes detected before corrections and the design changes that led to those corrections should be recorded and fed back into the company's design standards and checklists. It is also important to reflect the accurate buried-pipe locations obtained from point-cloud surveys in as-built drawings and asset registers so they can aid future construction planning. When planning for sites with similar conditions, lessons learned from past projects can be applied from the design stage to help avoid similar clashes. By continuously cycling PDCA while accumulating point-cloud usage and design improvements in this way, the risk of design changes can be reduced over time.


Points to Reduce Design Changes

When putting the above procedures into practice on site, there are several key points to keep in mind. First, it is desirable to carry out point cloud surveying as early as possible in the planning stage and to cover an area slightly larger than the design target area. By understanding the current conditions including the surrounding area, you can avoid situations where buried objects located just outside the design area are discovered later. In addition, accuracy control of point cloud data is also important. Naturally, improve coordinate accuracy through control point surveys and RTK-GNSS, and, as necessary, cross-check using multiple methods to confirm there are no missed measurements or areas with large errors.


Furthermore, it is important to make it a habit to share the results of clash detection with all stakeholders. If not only designers but also construction managers and clients review the 3D model, everyone can develop construction plans with a correct understanding of the current conditions. Making it easier to reflect on-site feedback in the design reduces the likelihood of discrepancies and changes during the construction phase. It is also effective to raise the team's skills in point cloud processing and 3D design. If each person responsible can handle the data freely, the accuracy and speed of clash detection will improve dramatically. As a result, design changes across the entire project are reduced, leading to smoother construction.


Summary

By performing clash checks between buried pipes and new designs using point cloud data, it becomes possible to identify collision risks in advance that previously could not be discovered until the construction stage, thereby minimizing design changes. On construction sites where this method has actually been introduced, there are reports that the number of design changes during construction has drastically decreased, leading to reductions in additional costs and schedule losses. Point cloud technology that records an entire site in 3D is a powerful tool supporting DX (digital transformation) in the infrastructure sector. By visualizing unseen underground obstacles and taking countermeasures on the data, on-site construction is more likely to proceed as planned, preventing rework and additional costs. As a result, this contributes to safe, secure, and waste-free project delivery for both clients and contractors. In addition, trials have begun to overlay the 3D models of underground buried objects obtained from clash checks onto the site using AR (augmented reality) technology to assist safety checks before excavation. Such efforts are also expected to help prevent accidents that damage existing pipes and disruptions to lifelines.


Furthermore, in recent years the barriers to point cloud measurement and high-precision positioning themselves have also fallen significantly. Even without expensive dedicated equipment, for example, by using a high-precision GNSS device LRTK that can be used with a smartphone (an iPhone-mounted GNSS high-precision positioning device), anyone can easily measure a site with centimeter-level positional accuracy (cm level accuracy, half-inch accuracy). Using solutions like LRTK, surveying and point cloud acquisition that were previously outsourced to specialist contractors can be handled in-house, making it easier to implement interference checks even for small-scale projects. In practice, operations are beginning to appear in which crews bring a smartphone and LRTK to a site, quickly create a point cloud of buried pipes, and complete 3D interference checks on the spot. By appropriately adopting these latest technologies and steadily conducting reliable pre-checks and rational design modifications, smooth construction with fewer design changes should be achievable. The use of these digital technologies is radically transforming how underground infrastructure work is conducted. By utilizing point cloud data, we can make “you won't know until you dig” a thing of the past, and build a future field environment where locating buried utilities and preventing clashes is routine.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.