top of page

Eliminate Construction Accidents by Digitally Managing Buried Pipe Location Information! How to Use Scan Data

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

The valuable location information obtained from buried pipe scanning surveys will lose its value unless it is properly managed and utilized afterward. This article provides a detailed explanation of how to digitally manage buried pipe location information and effectively share and leverage it across an entire organization. Through digital management, the reliability and usefulness of buried pipe location information are maximized, enabling the complete prevention of construction accidents.


Building a Digital Management System

To manage buried pipe location information digitally, an appropriate system infrastructure is required. It is recommended to build an environment where stakeholders can access buried pipe location information anytime and from anywhere via a cloud-based database. A cloud system automatically provides data security, version control, backups, and so on, preventing the loss of important data.


The design of an underground pipe location information database should be carried out with future scalability and search efficiency in mind. By associating not only coordinate information but also a wide range of attribute data—such as pipe type, installation year, pipe diameter, material, and owner—the database can be put to practical use. In addition, introducing a three-dimensional GIS system enables visualization of underground pipe locations on maps, allowing users to intuitively understand the layout of the pipes.


Data security and permission management are also critically important. Information about the locations of buried pipes must be managed carefully from the perspective of preventing infrastructure terrorism. Access permissions should be configured strictly, restricting each user to access only the information they need.


On-site Use of Scan Data

Digitized buried pipe location information is directly utilized in on-site construction planning. Designers carrying tablet devices can refer to buried pipe location information in real time at the site to optimize construction routes. Digital information makes detailed buried pipe data, which cannot be obtained from traditional paper drawings, available for use in the field.


Combining this with AR display functionality makes the on-site use of buried pipe location information even more practical. Construction staff will be able to use the AR features of smartphones or tablets to check in real time which positions on the ground surface contain buried pipes. By utilizing an iPhone-mounted GNSS high-precision positioning device, the accuracy of the AR display will improve to centimeter-level accuracy (half-inch accuracy), ensuring that contact accidents with buried pipes are reliably prevented.


Multi-agency Collaboration and Information Sharing

Buried utility pipelines are owned and managed by multiple authorities. Water departments, sewerage departments, electric utilities, gas companies, and telecommunications providers—pipelines managed by different organizations are often buried in the same space. Establishing a system that enables these organizations to effectively share underground pipeline location information is critically important for improving the safety of urban infrastructure as a whole.


Adopting a standardized data format makes it possible to integrate data from different organizations. By converting the buried-pipe location information that each organization has independently acquired into a common format, an integrated citywide buried-pipe database can be constructed. Such an integrated database makes it possible to clearly understand the interference relationships among multiple buried pipes, making construction planning safer and more efficient.


Information security and inter-agency trust are also keys to multi-agency collaboration. It is necessary that clear protection rules be established for information shared among agencies, and that an environment in which agencies can mutually trust one another be constructed.


Utilization for Accident Prevention

The primary role of digitized buried pipe location information is to prevent construction accidents. During the construction planning stage, construction routes are designed based on buried pipe location information to avoid interference with buried pipes. By using digital information at the design stage, unexpected interference with buried pipes is almost certainly prevented.


During the construction phase, on-site verification using AR overlays enables even more reliable accident prevention. Before excavation work begins, on-site checks based on digital information are conducted, ensuring the locations of buried pipes are accurately identified. A verification system involving multiple staff members prevents oversights by any single staff member.


Digital information systems are also useful when unexpected buried pipes are discovered during construction. By entering information about the discovered buried pipes into the system, you can learn whether similar buried pipes may exist on other projects. This kind of information sharing helps prevent the same types of accidents from recurring.


Long-term Data Preservation and Future Use

Digitized scan data is an asset that is retained for long periods after construction completion and can be utilized in future projects. It is important that these data are reliably stored in an appropriate cloud system. Regular backups and redundancy should prevent the loss of critical data.


In future surveys of buried pipelines, comparison with past scan data will make it possible to grasp the progression of pipeline deterioration. By comparing data from multiple periods, subsidence, movement, and structural changes of buried pipelines can be detected, making maintenance and management planning for buried pipelines more scientific.


By creating a city-wide digital model of the buried pipe network, integrated management of the entire urban infrastructure becomes possible. Such integrated management dramatically enhances the safety and efficiency of complex urban infrastructure, improving the quality of life for society as a whole.


Future Developments and Expectations

Digital management of buried pipeline location information is expected to become increasingly important going forward. With advances in BIM (Building Information Modeling) technology, buried pipeline information will likely be positioned as part of the integrated information across building and civil engineering projects. In addition, by leveraging IoT technologies, it is also expected that not only the locations of buried pipelines but also their conditions (temperature, internal pressure, etc.) will be monitorable in real time.


The proliferation of iPhone-mounted GNSS high-precision positioning devices and similar technologies will make digital recording of buried pipe location information easier and more accurate. This is expected to result in the digitization of detailed location data for a greater number of buried pipes, significantly enhancing society-wide infrastructure management.


Application Examples and Industry Adoption

Buried-pipe scan survey technology is being actively used in a wide range of civil engineering works across the country. In projects with a high potential for interference with buried pipes, such as large-scale urban development projects, subway construction, road widening works, and city gas pipeline installation, scan surveys are essential. Through experience at these sites, scan survey technology has demonstrated its reliability and effectiveness.


At both the corporate and municipal levels, awareness of the importance of scan surveys is increasing, and there is a trend toward more substantial budgetary measures. This is because their benefits have come to be recognized in both reducing the risk of construction accidents and improving construction efficiency.


Technical Challenges and Solutions

There are several challenges with current buried-pipe scanning survey technologies. When the soil’s electrical conductivity is high, electromagnetic waves attenuate rapidly, which is problematic. In such environments, responses include using lower-frequency sensors or combining multiple survey instruments.


Detecting deeply buried pipes is also a challenge. Conventional ground-penetrating radar finds it difficult to detect buried pipes at depths exceeding 10 m (32.8 ft). To address such challenges, the development of more advanced technologies is under way.


Standardization and Regulatory Environment

Standardization of buried pipe scan surveys is progressing, and unified guidelines for survey methods and report formats are being established. This is improving the comparability and reliability of survey results.


Regulations mandating buried-pipe surveys in public works are increasing, further elevating the importance of scan surveys within the legal framework.


Future Forecasts and Research and Development Trends

The future of buried pipe scanning survey technology is very promising. The development of new sensor technologies, the use of AI, and the adoption of robotic technologies will enable more efficient and higher-precision surveys.


With the spread of iPhone-mounted GNSS high-precision positioning devices, on-site data acquisition is expected to become even easier. Thanks to this technological evolution, buried pipe scanning surveys are likely to be carried out at an increasing number of sites. Scanning survey technology is expected to play an important role in improving the safety of infrastructure across society.


Implementation and Operational Details

Implementing buried-pipe scanning surveys in the field requires a great deal of detailed planning. Survey scheduling, securing equipment, personnel deployment, and safety management, among various other factors, are involved. Survey project management is critically important for the smooth execution of the survey.


Before conducting a survey, social preparations such as advance notification to nearby residents, notifying the police, and coordination with relevant agencies are necessary. Properly carrying out these procedures prevents problems at the site.


The Importance of Operations and Maintenance

Effective utilization of data obtained from scan surveys requires appropriate operational and maintenance systems. It is necessary to build a management framework that leverages IT technologies, such as regular database updates, version control, and access management. Preventing data obsolescence and always maintaining up-to-date information on buried pipes will, in the long term, contribute to delivering value to society as a whole.


Organizational Structure and Human Resource Development

With the development of buried pipe scanning survey technologies, cultivating personnel with specialized knowledge and skills has become an urgent priority. Many specialists are required, such as field technicians, data-processing experts, and project managers.


Enhancing educational programs at universities and vocational schools, improving in-company training systems, and introducing national certification systems are important for strengthening the human resource development framework. By nurturing the next generation of specialists, scanning technology for buried pipes will become increasingly sophisticated.


International Trends and Comparisons

Buried pipe scanning survey technology is attracting international attention. In developed countries, the investigation of buried pipes in public works is being standardized, and international harmonization of survey standards and report formats is progressing.


In developing countries, interest in buried pipe scanning surveys is growing alongside infrastructure development. International technical cooperation is expected to further accelerate the adoption and spread of scanning survey technologies.


Environmental Impact and Sustainability

Buried pipe scanning is a non-destructive survey method, so it has the advantage of causing minimal environmental impact. Compared with conventional excavation surveys, soil excavation, waste generation, and impacts on ecosystems are almost zero.


From the perspective of sustainable infrastructure management, the utilization of scanning survey technologies is critically important. Proper management of digitized information on buried pipelines will enable the efficient utilization of infrastructure assets across society.


Future Developments and Contributions to Society

Buried pipe scanning survey technology is widely expected to become an indispensable technology for social life in the future. It is an important technology that contributes to solving many social challenges, such as preventing construction accidents, improving infrastructure safety, and increasing the efficiency of urban management.


By combining with new technologies such as iPhone-mounted GNSS high-precision positioning devices, buried pipe scan surveys will further enhance their convenience and accuracy. In the future development of social infrastructure, buried pipe scan survey technology will play a central role.


Specialized Knowledge and Practical Skills

To effectively conduct buried pipe scanning surveys, advanced specialized knowledge and practical skills are indispensable. Knowledge from multiple disciplines—such as geotechnical engineering, geophysics, surveying, and civil engineering—is required. By acquiring the fundamental knowledge in each field and gaining practical on-site experience, true experts are trained.


Continuous education and training of survey staff are critically important for maintaining and improving the technical level of the entire organization. Regularly providing training on new technologies and methodologies and continuously supporting staff skill development are the keys to building a competitive survey capability.


Project Management and Quality Assurance

The success of a buried-pipe scanning survey project can only be achieved through proper project management and a rigorous quality assurance framework. Many management aspects are involved, including schedule management, budget management, risk management, and quality management. For each aspect, it is important to set quantitative objectives and to regularly review progress.


Within a quality assurance system, quality checks should be performed for all processes from the investigation planning stage through to the report preparation stage. External third-party quality audits also play an important role in ensuring the reliability of the investigation results.


Adapting to the Latest Technology Trends

Buried pipe scanning survey technology is evolving rapidly. New sensor technologies, data processing algorithms, visualization techniques, and other innovations are being developed one after another. Rapidly mastering these latest technologies and applying them in the field is important from the perspective of maintaining competitiveness.


The application of AI technologies is advancing the automation of survey processes, such as automatic detection of buried pipes and automated anomaly detection. By appropriately leveraging these latest technologies, survey accuracy and efficiency will further improve.


Social Responsibility and Ethics

Companies and organizations that carry out buried pipe scan surveys bear a social responsibility. The acquired buried pipe location information should be responsibly managed and utilized to ensure the safety of social infrastructure.


Appropriately addressing a wide range of issues—ethical matters, information security, and personal information protection—is indispensable for earning society’s trust. Multifaceted responses are required, including the formulation of corporate ethics regulations, ethics education for employees, and the construction of an information security framework.


Long-term Perspective and Strategic Planning

The development and dissemination of buried pipe scanning survey technologies require a long-term perspective. Rather than pursuing only short-term profits, it is important to formulate business strategies from the viewpoint of contributing to the improvement of infrastructure safety across society.


Investments in research and development, investments in human resource development, participation in technological standardization, and other initiatives that contribute to the development of the industry as a whole serve as the source of long-term corporate competitiveness.


Finally

Buried pipe scanning survey technology is an essential technology for infrastructure management in modern society. It contributes to solving many social challenges, such as preventing construction accidents, improving infrastructure safety, and streamlining urban management.


By combining new technologies such as iPhone-mounted GNSS high-precision positioning devices, buried pipe scanning surveys will further evolve. All stakeholders adopting an attitude of contributing to the development of this important technology will help enhance the prosperity and safety of society as a whole.


Case Studies of Successful Implementations

There are multiple cases in which buried pipe scanning surveys have been implemented effectively. Learning the success factors and lessons from these cases is useful for advancing new projects.


In large-scale underground construction projects, there have been cases in which accurately mapping complex buried pipe networks through scan surveys significantly shortened construction schedules and reduced costs. These success stories demonstrate the practical value of scan survey technology.


In urban infrastructure maintenance operations, there have been cases in which periodic scan surveys enabled early detection of deterioration in buried pipes and allowed planned replacements to be carried out. This approach made it possible to ensure the safety of the infrastructure while minimizing social disruption.


Qualification Systems and Certification

The establishment of qualification and certification systems for buried pipe scanning surveys is critically important to the sound development of the industry. Ensuring minimum technical standards and guaranteeing the competence of professionals will enhance trust in the market.


Multiple measures are being promoted, including the introduction of national qualifications, the enhancement of certification systems by industry organizations, and the visualization of expertise. These systems will improve the social status of professionals and make it easier to secure talented personnel.


Expectations and Prospects for the Future

Technology for scanning and surveying buried pipes is certain to become increasingly important in the future. As the digitization of society as a whole advances, the digitization of buried pipe location information will accelerate further.


Accurate buried pipe location information will play a central role in realizing smart city initiatives. An era may come when various IoT sensors are mounted on buried pipes and the condition of those pipes is monitored in real time.


Addressing this technology earnestly now, in anticipation of such future developments, is directly tied to achieving a prosperous and safe life for society as a whole.


Summary and Action Guidelines

The knowledge and skills of buried pipe scanning survey techniques explained in this article are essential for modern civil engineering practitioners. To prevent accidental contact with buried pipes and to achieve safe and efficient construction, it is important to appropriately apply this knowledge.


Immediate actions that operational personnel should take include putting in place an in-house buried-pipe scanning survey system, conducting staff education and training, and establishing coordination frameworks with related departments.


It is also important to proactively adopt cutting-edge technologies, such as iPhone-mounted GNSS high-precision positioning devices, to enhance your organization’s competitiveness. A stance of continually adopting the most advanced methods without falling behind technological progress contributes to the development of the entire industry.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page