3 Case Studies of Successful Cost Reduction in Civil Surveying | Work Time Reduced by 50% Through Digitization
By LRTK Team (Lefixea Inc.)
Surveying costs in civil engineering projects account for a significant portion of the overall project cost. Reducing costs while maintaining surveying accuracy is an important challenge for practitioners. By leveraging digital technologies and ICT, cost reductions that were previously impossible have been achieved. In this article, we present specific cases that successfully reduced surveying costs and explain in detail the methods and effects. From these cases, you can explore the applicability to your company’s projects. By adopting a phased approach, it is possible to realize cost reductions while minimizing risk.
Major Components of Surveying Costs and Potential for Reduction
Surveying costs in civil engineering projects consist of labor costs, equipment costs, outsourcing costs, and so on. Labor costs are the largest component, and by reducing the time required for measurements, substantial cost savings are possible. With conventional surveying methods, much time has been spent on on-site data collection.
As strategies for cost reduction, there are broadly two approaches. The first is to shorten measurement time. By introducing efficient measurement methods, the time required to achieve the same accuracy is reduced. The second is transitioning from outsourcing to in-house operations. By performing measurements and processing in-house, outsourcing expenses are reduced. However, bringing operations in-house requires investment in equipment and personnel training.
By implementing these approaches step by step, it is possible to optimize overall measurement costs. Introducing new technologies temporarily increases investment, but in many cases leads to cost reductions in the long term.
Case Study 1: 50% Reduction in Work Time through Implementation of Drone Surveying
In large-scale industrial park development projects, we traditionally conducted surveys of current site conditions and construction-control surveys over vast areas using total-station surveying. The measurement area was approximately 150 ha (370.7 acres), and with the conventional method the monthly construction-control survey required 20 days of measurement time. During this measurement period, even when multiple survey teams worked in parallel, it was difficult to adjust the survey schedule to match construction progress.
With the introduction of drone surveying, measurements of the same accuracy can now be completed in 10 days. Aerial photography with the drone was completed in one day, and subsequent image processing generated orthophotos and point cloud data within a few days. By comparing the existing point cloud data with the current point cloud data, the construction status could be understood intuitively.
In this case, the cost-reduction effects included a 20% reduction in measurement personnel and labor cost savings due to a shortened measurement period. The total measurement cost of 3 million yen per month was reduced to 1.5 million yen per month. At the same time, measurement accuracy was maintained at a level equal to or better than that of all-station surveying. Initial equipment purchase and personnel training costs in the early implementation stage were about 5 million yen, but over the two-year construction period this investment was fully recovered.
The lesson learned from this case was that the introduction of drone surveying has particularly significant effects in large-scale construction. By providing explanations and training about the new measurement method to all on-site staff before implementation, resistance was minimized and the rollout proceeded smoothly.
Case Study 2: Balancing Accuracy and Efficiency by Combining GNSS Surveying and Conventional Surveying
In multiple bridge construction projects, highly accurate measurement of the bridges' positions and elevations was required. Traditionally, this was addressed by conducting total station surveys to build a complex measurement network. However, because the construction area spanned multiple bridges and many locations made it difficult to secure lines of sight, measurement efficiency declined.
By combining RTK-GNSS surveying and laser scanners, we improved the measurement method. RTK-GNSS was used to determine the positions of control points over a wide area, and laser scanners were used for detailed measurements of complex bridge structures. With this combination, measurements that previously took 5 days to complete can now be finished in 3 days.
Furthermore, with the introduction of point cloud data processing software, manual drawing creation became unnecessary and the time spent on administrative tasks was greatly reduced. Drawing production, which previously took 1 week after measurement, can now be completed in 2 days. Overall, the period from measurement to report preparation was shortened from 15 days to 7 days.
As a breakdown of the cost reductions, labor cost savings from shortening the measurement period were ¥1,000,000 per month, labor cost savings from shortening administrative processing time were ¥800,000 per month, achieving a total monthly cost reduction of ¥1,800,000. The total amount of equipment investment (GNSS equipment, laser scanners, and processing software) was approximately ¥8,000,000, and it was calculated that this would be recovered in 5 months.
An important lesson from this case is that appropriately combining multiple measurement techniques can yield effects greater than the introduction of individual technologies alone. It also became clear that investing in post-processing technologies, such as point cloud processing software, can make a significant contribution to reducing total costs.
Case 3: Reducing Outsourcing Costs through In-house Production
In medium-scale land development projects, surveying tasks were traditionally fully outsourced to external surveying firms. An outsourcing fee of ¥1.5 million was incurred for each monthly construction management survey. The construction period was three years, and surveying-related costs alone amounted to several tens of millions of yen.
We decided to establish an in-house measurement system, purchased GNSS receivers and drones, introduced processing software, and conducted skills training for staff. The initial investment was approximately 6 million yen, and reductions in outsourcing costs began in the first year.
By bringing processes in-house, we can now manage every step ourselves, from measurement planning to report preparation. Measurement accuracy has improved, and immediate sharing of measurement results is possible, improving the efficiency of construction management. Responses to any problems have also become faster, and when additional measurements are required, we can address them immediately.
As a result of cost reductions, outsourcing costs of ¥1,500,000 per month were reduced to ¥400,000 per month. The breakdown of the reductions is a ¥1,100,000 per month decrease in outsourcing costs, a ¥300,000 per month increase in measurement staff labor costs (one new hire), and ¥100,000 per month in equipment maintenance costs, resulting in a net cost reduction of ¥700,000 per month. Over the three-year construction period, approximately ¥25,000,000 in cost reductions were realized.
As a lesson learned from this case, it was shown that for construction projects above a certain scale, insourcing is effective for long-term cost reduction. It became clear that long-term management decisions that take into account both initial investment and running costs are important. In addition, appropriate staff training and continuous skill development were demonstrated to be the keys to successful insourcing.
Barriers to Cost Reduction and Countermeasures
There are several barriers to advancing surveying cost reductions. The first is management judgment regarding investment in new technologies. Because the initial investment is large, they should be cautious in estimating the effects of the investment; however, at the same time, to respond to market competition it is necessary to proactively adopt new technologies.
The second is the time required for staff skill development. Even if new technology is introduced, it takes time to become proficient. In the initial stages of implementation, measurement efficiency may actually decline. It is necessary to invest in staff development from a long-term perspective.
Third, there are technical challenges. Data compatibility issues can arise between new technologies and existing approaches. Integrating multiple systems requires technical measures. To address these challenges, it may be worth considering the support of specialized consultants.
Investment Decisions for Measurement Instruments
Deciding whether to invest in new measurement equipment requires considering multiple factors. It is important to comprehensively evaluate not only the purchase price but also maintenance and management costs, the personnel costs required for operation, and the expected benefits. Calculating the payback period of the investment is also important. Investment decisions differ when you are responsible for multi-year projects versus single, one-off projects.
Also consider using rentals or leases. For large equipment, choosing rental rather than ownership can avoid upfront investment and enable flexible operation. Many drones and laser scanners are available through a well-developed rental market. However, if you will use them continuously across many projects, purchasing is often more economical.
Versatility is also an important factor when selecting equipment. Choosing equipment that can be used for multiple types of construction work increases the return on investment. On the other hand, investments in specialized equipment that are required only for specific jobs should be made with careful consideration.
Staff Training and Human Resource Development Costs
Introducing new technologies requires staff education and human resource development. Participation in external training, conducting in-house training, and site visits to observe advanced case studies—among many other educational activities—are necessary. These training costs are often taken into account when calculating the effects of measurement cost reduction, but they can also be overlooked.
However, improving staff skills becomes a long-term corporate asset. Skills once acquired can be utilized in all subsequent construction work. It also contributes to higher staff motivation, and by improving job satisfaction, leads to lower turnover. When evaluating investments in training, it is important to consider the long-term enhancement of human capital, not just short-term cost calculations.
Secondary Effects Brought by Digitalization
Although the introduction of new technology is aimed at reducing measurement costs, it simultaneously brings many secondary effects. The first is improved measurement accuracy. The new technology makes high-precision measurements that were previously difficult feasible. As a result, the quality of construction work is improved.
Second is the visualization of construction progress. By leveraging digital data, the progress of construction can be understood in greater detail. The preparation of reporting materials for the client is also streamlined.
Third is improved safety. Drone surveying enables investigations of dangerous heights and steep slopes to be conducted safely. The reduction in safety risks to staff is important not only for direct cost savings but also from the perspective of saving lives.
Future Developments and Leveraging New Technologies
The digitization of civil engineering surveying is still only halfway complete, and many more new technologies will be introduced going forward. New possibilities are opening up, such as automated measurement using AI technology, cloud-based data management, and visualization of construction management through AR technology.
iPhone-mounted GNSS high-precision positioning devices like LRTK are also a noteworthy technology in this trend. If high-precision surveying can be achieved using the ubiquitous smartphone, new possibilities for cost reduction will emerge. High-precision measurements will become economically feasible even for small-scale construction, and surveying accuracy across the industry is likely to improve.
By appropriately combining multiple new technologies, further progress is expected in achieving both reductions in measurement costs and improvements in accuracy. Developing personnel who can respond to these technological changes, along with organizational responsiveness, will become important factors that determine corporate competitiveness going forward.
Refining ROI Analysis and Investment Decision-Making
A precise ROI (return on investment) analysis is required when making investment decisions about new surveying technologies. You need to consider multiple effects—not only simple labor cost reductions but also cost savings from shorter construction schedules, reductions in corrective construction costs due to improved quality, and enhancements to corporate image. When calculating the payback period, it is important to assume use across multiple projects and to take the equipment's service life into account.
Moreover, from a competitiveness perspective, investing in new technologies is important. If competitors adopt new technologies and are able to deliver higher-quality services at lower costs, a company may fall behind in market competition. Continuous investment in technology is essential to maintain a long-term market position. From a risk management perspective, it is necessary to evaluate both the risk of failure associated with adopting new technologies and the risk of not adopting them. Positioning the adoption of new technologies as part of corporate strategy leads to sustainable business growth.
Organizational cost reduction process and continuous improvement
One-off cost reductions only yield temporary effects. To achieve sustained cost reduction, it is necessary to build an organizational process. By introducing the PDCA cycle of "planning, implementation, verification, improvement" into surveying operations, continuous efficiency improvements can be realized.
By carrying the cost-reduction methods achieved in each project over to the next project and further improving them, the organization’s overall ability to reduce costs will progressively increase. Establishing a mechanism to share the ideas and improvements discovered in different construction projects will accelerate organization-wide efficiency gains. At the same time, raising staff cost awareness and enhancing the improvement suggestion system can be expected to generate innovative bottom-up improvements.
ROI Analysis and Refinement of Investment Decisions
Making investment decisions in new surveying technologies requires a detailed ROI (return on investment) analysis. It is necessary to consider multiple effects, not just simple labor cost reductions, but also cost savings from shortened construction schedules, reduced corrective-work costs due to improved quality, and enhancements to corporate image. When calculating the payback period, it is important to assume use across multiple projects and to take the equipment’s useful life into account. Also, from a competitiveness standpoint, investing in new technology is important. If competitors adopt new technologies and can offer higher-quality services at lower cost, you may fall behind in market competition. To maintain a long-term market position, continuous investment in technology is indispensable. From a risk-management perspective, it is necessary to evaluate both the risk of failure from adopting the technology and the risk of not adopting it. Positioning the adoption of new technologies as part of corporate strategy contributes to sustainable corporate growth. From these perspectives, it is worth considering investment in innovative technologies such as LRTK.
Organizational Cost Reduction Process and Continuous Improvement Framework
One-off cost reductions only produce temporary effects. To achieve sustained cost reduction, it is necessary to build organizational processes. Introducing the PDCA cycle—plan, implement, verify, and improve—into surveying operations enables continuous efficiency gains. By passing on the cost-reduction methods achieved in each project to the next project and further refining them, the organization's overall cost-reduction capability improves incrementally. Establishing mechanisms to share ideas and improvements discovered in different construction projects accelerates company-wide efficiency gains.
Leveraging Economies of Scale and Building Partnerships
Companies that handle multiple construction projects can reduce costs by leveraging economies of scale when purchasing equipment. By buying multiple units of the same equipment, not only does the unit price decrease, but you may also be able to obtain more affordable service for maintenance and repairs. Additionally, building partnerships with other companies is worth considering to reduce expenses through joint ownership or shared use of equipment. Equipment-sharing services offered by industry associations are also an effective way to adopt new technologies while keeping initial investments down. However, when forming partnerships, it is important to clearly agree in advance on standards for managing data quality, the allocation of responsibilities, and similar matters.
Promoting Cost Reduction as a Long-Term Management Strategy
Reducing surveying costs is not a short-term management issue but an important strategic challenge that determines long-term corporate competitiveness. It is necessary to pursue multiple initiatives in parallel, such as investment in new technologies, investment in human resource development, and investment in improvements to business processes. These investments are a burden on companies in the short term, but in the long term they significantly enhance corporate competitiveness and profitability. As market conditions change and ordering parties increasingly demand cost reductions, the ability to reduce surveying costs becomes a key factor in a company's ability to win contracts. Companies that recognize the importance of cost reduction across the entire organization and continuously work on improvements will be able to survive and prevail in industry competition.
Implementation Framework and Organizational Support for Cost Reduction
To achieve reductions in surveying costs, mere slogans or goal-setting alone are insufficient. Concrete measures to actually reduce costs, a structure to implement them, and mechanisms to evaluate the success of those measures are needed. It is necessary to proceed simultaneously with many initiatives, such as introducing new equipment, improving work processes, and optimizing personnel allocation. For these initiatives to function effectively, continuous support from management, coordination between the measurement department and the management division, and regular evaluation and improvement of progress are indispensable. Continuous efforts to reduce surveying costs will promote the strengthening of corporate competitiveness and the development of the entire industry, and will lead to contributions to society. Continuous efforts to reduce surveying costs will promote improvements in corporate competitiveness and the development of the entire industry, and will ultimately lead to contributions to society as a whole. Strategic efforts to reduce costs will simultaneously achieve the strengthening of corporate competitiveness and the development of the entire industry, and will bring about significant contributions to society.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.