Labor shortages have become a serious issue at civil engineering construction sites. Surveying work is no exception; it has traditionally assumed multiple personnel, but the use of digital technology has made measurements with a small crew possible. This article provides a detailed explanation of a single-person surveying method that combines a smartphone with high-precision GNSS technology, and how to implement it in the field. Achieving single-person surveying can dramatically increase on-site work efficiency and may also improve measurement accuracy.


Human challenges in traditional surveying operations

In conventional total station surveying, multiple personnel such as an observer, a recorder, and a rod holder were required. Even for small-scale measurements, at least 3 people were needed, and on large construction projects it was not uncommon for 10 or more personnel to be deployed across multiple surveying teams. This kind of manpower-intensive arrangement not only directly increases labor costs but also makes it difficult to secure measurement schedules within the construction period.


The background to the personnel shortage is a decline in the workforce across the civil engineering industry. In particular, the number of workers from younger generations is decreasing, making it difficult to secure surveyors who have received appropriate education and training. At the same time, the scale of construction projects has not decreased and may even be increasing, which is further exacerbating the problem of securing personnel for surveying work.


In such circumstances, developing new measurement methods that allow a small team to achieve the same level of accuracy has become an urgent priority for the industry. By leveraging digital technologies, if surveying work can be carried out by a single person, the problem of manpower shortages would be greatly alleviated.


Advantages of smartphone-based measurement systems

The greatest advantage of using a smartphone as a measuring device is that it is a widely available piece of equipment. Nearly all workers at civil engineering sites own a smartphone, so there is no need to purchase additional devices. Smartphone processing power has increased rapidly, enabling complex computational tasks to be performed in real time.


When using a smartphone as a measuring instrument, attaching a high-precision GNSS receiver to it enables high-precision positioning. With this approach, expensive modifications to the smartphone itself are unnecessary, and a simple mounting device is sufficient. As a result, deployment costs are reduced and it becomes easy to introduce this solution at many construction sites.


Moreover, smartphones are typically equipped with a camera and a display, allowing real-time processing and display of results at the measurement site. With conventional methods, data had to be processed after returning to the office, but with the smartphone approach, measurement results can be checked immediately on site. This real-time capability allows the need for additional measurements to be determined on site, greatly improving measurement efficiency.


Technical Principles of High-Precision GNSS-Equipped Wearable Devices

A high-precision GNSS-mounted device receives signals from multiple satellite positioning systems and, by combining them with correction signals, achieves accuracy of several centimeters (a few in). By attaching this device to a smartphone, high-precision positioning becomes possible without specialized surveying equipment.


Inside the device, signals are received simultaneously from multiple satellite constellations such as GPS, GLONASS, and Galileo. This allows it to maintain sufficient accuracy even in environments where satellite geometry is not optimal. Available methods for receiving correction signals include radio corrections from base stations or services delivered via the Internet. When using an Internet-based service, there is no need to install separate base stations, making deployment easier.


The wearable device is about the size of a smartphone case and is lightweight, so it does not burden workers even when carried for long periods. Its battery capacity is sufficient to cover a full workday without issue. Durability has also been taken into account, and it is designed to withstand use in the harsh environments of construction sites.


Specific implementation methods for single-person surveying

To implement single-person surveying using a smartphone and a high-precision GNSS device, several steps are required. First is becoming proficient with the device and the smartphone app. Learn the operation from the manual, practice with actual measurements, and acquire skills through the process of validating results. Because the operational workflow is relatively simple, basic proficiency can be achieved in a few days.


Second, the preparation of the measurement plan. Assuming a single-person measurement, determine the measurement order, the required number of measurement points, and the measurement schedule. In conventional multi-person measurements, widely dispersed locations could be handled simultaneously by multiple teams, but for one person, measurements along the same route are more efficient. By planning the measurement route in advance, travel time can be minimized.


Third, carrying out the measurements on-site. Follow the instructions in the smartphone app and record the location information at each measurement point. Because the measurement results are displayed in real time, you can immediately confirm whether the measurement accuracy is at a satisfactory level. If the accuracy is insufficient, re-measuring on the spot allows you to avoid additional measurements later.


Personnel Reduction Effects of One-Person Surveying

The biggest advantage of one-person surveying is that it can greatly reduce the personnel required for measurements. In conventional multi-person surveying, for total station surveying measuring 100 points per month, if carried out by a two-person measurement team working 20 days, the monthly personnel cost is approximately 1.5 million yen. With one-person surveying, when measuring the same points over the same period, personnel costs are about 750,000 yen, achieving a 50% reduction.


The advantages of reducing staff go beyond merely cutting labor costs. Conducting measurements with a small team makes it easier to adjust measurement schedules. It also enables flexible responses to sudden requests for additional measurements. Additionally, when a single measurer consistently handles everything from measurement planning to report preparation, measurement variability is reduced and data quality can improve.


Through personnel reductions, limited human resources can be reallocated to other tasks. When staff with measurement experience shift to other technical work, it is also expected that the company's overall technical capabilities will improve.


Case Study: Introducing Single-Person Surveying in a Medium-Scale Construction Project

In a land development project, the measurement system was switched from the traditional multi-person surveying setup to single-person surveying. The measurement area was approximately 50 hectares (123.6 acres), and the monthly average number of measurement points was 150. Measurements that had previously been carried out by a two-person measurement team over 20 days per month were changed to be performed by one person over 25 days per month using a smartphone paired with a high-precision GNSS device. Although the number of measurement points increased, mobility efficiency improved, and the schedule could be met.


In the initial implementation phase, it took 3 days to learn how to operate the new equipment. After that, we honed our skills while conducting actual measurements. During the first month, we performed parallel measurements with the conventional method and conducted an accuracy verification. As a result, it was confirmed that the accuracy of the new method was equal to or better than that of the conventional method.


The effects after operations stabilized are as follows. Monthly measurement labor costs were reduced from ¥1.5 million to ¥0.8 million. At the same time, real-time confirmation of measurement results improved measurement quality and reduced measurement errors. The need for additional measurements decreased, and total measurement costs were reduced by 35%. Over the three-year construction period, approximately ¥15 million in measurement costs were saved.


The lesson learned from this case is that a sufficient trial period is important when introducing new technology. Rather than aiming for full operation immediately after deployment, the key to a smooth rollout is to run in parallel with conventional methods to verify accuracy and ensure reliability before transitioning to full-scale operation.


Challenges and Countermeasures in One-Person Surveying

There are several challenges in introducing single-person surveying. The first is the workload on the surveyor. Conducting measurements alone tightens time constraints and leaves little room in the measurement schedule. If measurements cannot be carried out due to bad weather or equipment trouble, subsequent schedule adjustments can become difficult. When drawing up the measurement plan, it is important to take these risks into account and allow for extra time.


The second point is maintaining measurement accuracy. When measurements are taken by a single person, verification of results becomes limited. This can make it difficult to notice measurement errors. As a countermeasure, it is important to carry out rigorous post-measurement data validation. It is also effective to periodically conduct measurements with multiple people to confirm the accuracy of single-person measurements.


The third point is safety management. When performing measurements alone in hazardous locations, it becomes difficult to respond if a problem occurs. In particular, measurements in dangerous environments, such as on the top of cliffs or in rivers, should be avoided whenever possible. In locations that involve danger, it is important to maintain a measurement team with multiple people.


Standardization and Widespread Adoption of High-Precision GNSS Wearable Devices

The approach of pairing smartphones with high-precision GNSS devices is already technically feasible. To promote industry-wide adoption, standardization of devices and unification of applications are important. Currently, different devices are offered by multiple manufacturers, and compatibility issues exist. Industry associations are undertaking standardization efforts, and unified standards are expected in the future.


Reducing costs is also important for promoting widespread adoption. The current device price is on the order of several hundred thousand yen, creating a barrier to adoption. Price declines are expected with future mass production. In addition, enhancing rental services would also be effective in promoting adoption by small businesses.


Future Developments and Impact on the Industry

The widespread adoption of smartphones paired with high-precision GNSS devices will bring significant changes to the civil surveying industry. Multiple benefits are expected, including alleviating personnel shortages, reducing surveying costs, and improving measurement quality. At the same time, easier acquisition of surveying skills could lower the barriers to entry for new participants, potentially revitalizing the industry.


At the same time, knowledge of conventional measurement methods will not become obsolete. In complex environments or when ultra-high precision is required, traditional methods remain important. By combining new technologies with conventional knowledge, a flexible and advanced measurement system can be realized.


iPhone-mounted GNSS high-precision positioning devices like LRTK embody this technological trend. The form factor of attaching them to the most widely used device—the smartphone—is simple yet highly effective. If such devices become standard across the industry, the methods of civil engineering surveying will change dramatically. With the realization of single-person surveying, the challenge of labor shortages will be alleviated, and a new era is about to arrive in which surveying accuracy and efficiency improve simultaneously.


Ripple Effects on the Entire Industry and Social Significance

If single-person surveying technology becomes widespread, it will have a significant ripple effect across the civil engineering industry. First, overall industry productivity will improve and construction costs will decrease. This will make it possible to carry out socially necessary infrastructure investment more efficiently. Next, the barrier to entry for surveying and measurement work will be lowered, making it easier for new personnel to enter the industry. This will greatly contribute to solving the labor shortage problem.


Furthermore, as high-precision surveying becomes widely available, construction quality will improve across the industry. Enhanced safety, improved durability, reduced maintenance and management costs, and other benefits will be brought to society as a whole. Increased transparency from digitalization will also strengthen the trust between clients and contractors.


The widespread adoption of such new technologies requires support from industry associations and government. The entire industry must cooperate to promote standardization, support the training of engineers, and establish legal frameworks. As a new era approaches, proactive initiatives by companies and individuals will lead to the industry's development.


Organizational Responses and Change Management for New Technology Adoption

When introducing new technology, simply purchasing equipment and deploying it on-site is not enough. It requires multifaceted actions such as organization-wide mindset change, process redesign, and building a talent development framework. This process is called "change management".


In the early stages of implementation, resistance and confusion often arise. There are various psychological barriers, such as distrust of new methods, confusion over operational difficulties, and attachment to traditional methods. To address these, it is important to have a strong message from senior management, sufficient education and training, sharing of success stories, and a tolerance for failure.


Transformation is not a one-off event but a continuous process. Even after introducing new technologies, organizations proceed to measure their effectiveness, pursue continuous improvement, and consider additional new technologies. By establishing such a continuous transformation process as part of organizational culture, they can maintain competitiveness in the industry and continue to grow.


Industry-wide Ripple Effects and Social Significance

Once one-person surveying technology becomes widespread, it will have a significant ripple effect across the civil engineering industry. First, productivity across the industry will increase and construction costs will decrease. This will enable socially necessary infrastructure investments to be carried out more efficiently. Next, the barrier to entering measurement work will be lowered, making it easier for new talent to join the industry. This will greatly contribute to solving the labor shortage. Furthermore, as high-precision surveying becomes widely available, construction quality will improve industry-wide. Many benefits will be delivered to society as a whole, including improved safety, enhanced durability, and reduced maintenance costs. Increased transparency through digitalization will also strengthen trust between project owners and contractors. For the spread of such new technologies, support from industry organizations and government is important. The entire industry must cooperate in promoting standardization, supporting technician training, and establishing legal frameworks. As a new era approaches, proactive efforts by companies and individuals will lead to the development of the industry.


Organizational Responses and Change Management During New Technology Adoption

Simply purchasing equipment and placing it on-site is not sufficient when introducing new technology. Multifaceted measures are required, such as organization-wide mindset change, process redesign, and the establishment of talent development systems. In the early stages of implementation, resistance and confusion often arise. There are various psychological barriers: distrust of the new methods, bewilderment at operational difficulty, and attachment to traditional ways. Addressing these requires strong messaging from executive leadership, adequate education and training, sharing of success stories, and tolerance for failure. Transformation is not a one-time event but a continuous process. Even after introducing new technology, organizations proceed to measuring its effects, continuous improvement, and consideration of further new technologies. By establishing this kind of continuous transformation process as part of organizational culture, it becomes possible to maintain competitiveness in the industry and continue to grow.


Building a System for Talent Development and Skills Succession

The introduction of single-person surveying technology may reduce the number of personnel involved in measurement operations. On the other hand, appropriately leveraging new technology requires higher-level skills and knowledge. Therefore, rather than personnel cuts, it is important to pursue staff reassignment and the development of advanced skills in parallel. By establishing a system in which experienced surveyors concentrate on mastering new technologies and pass that knowledge and experience on to younger generations, the overall technical level of the organization will improve. Providing continuous learning opportunities—such as regular training, studying advanced case examples, and technical exchanges within the industry—is essential for maintaining the organization’s competitiveness.


Changes in Industrial Structure and New Possibilities Resulting from the Realization of Solo Surveying

If single-person surveying technology becomes widespread across the industry, the way human resources are utilized in civil engineering work will fundamentally change. By enabling a small number of people to handle many measurement tasks, labor productivity will improve significantly and contribute to easing labor shortages. At the same time, the simplification of measurement tasks may make work that was previously limited to surveying specialists feasible for a broader range of workers. Such changes in industrial structure could create new employment opportunities and provide existing workers with chances to transition their careers. Confronting the social impacts of technological innovation directly and responding appropriately will lead to the development of individual companies and the industry as a whole.


The Future Brought by the Widespread Adoption of Smartphones × High-Precision GNSS

When iPhone-mounted GNSS high-precision positioning devices such as LRTK become widely adopted at civil engineering sites, the industry will change significantly. As high-precision location information becomes easier to obtain, detailed measurements that were previously economically impractical will be carried out at many sites. Enabling a single person to handle multiple measurement tasks will dramatically improve labor productivity and alleviate labor shortages. At the same time, a more attractive and efficient work environment for younger workers will be realized, potentially increasing the influx of talent into the industry. A large competitive gap will emerge between companies that can adapt to this technological evolution and those that cannot. The ability to proactively adopt new technologies and leverage them across the organization will become a crucial factor determining future corporate growth. By appropriately combining new technologies with existing knowledge, an era is approaching in which further quality improvements and efficiency gains in civil engineering works will be realized.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page