Challenges and Solutions for Point Cloud Scanning: From Accuracy Management to Data Processing
By LRTK Team (Lefixea Inc.)
Table of Contents
• What is point cloud scanning?
• Main practical challenges
- Managing positional accuracy and surveying errors (absolute coordinates / relative coordinates)
- Scan omissions, noise intrusion, and overlooked measurement areas
- Point cloud data size, PC performance, and portability issues
- Software proficiency, human resource development, and operator dependence
- Burden of secondary processing such as cross-sections and longitudinal/transverse comparisons
- Difficulty in overlaying with drawings and design data
- Lack of cloud/file sharing and coordination with clients
- Field conditions: rain, wind, and on-site display/verification
• Solutions
- Ensuring positional accuracy by combining with GNSS or RTK
- Avoiding scan omissions through shooting plans and control points
- Lightening workflow and enabling routine use with mobile LiDAR and smartphone point clouds
- Improving shareability with cloud processing and point cloud viewers
- Combining with LRTK to enable high-accuracy positioning and point cloud capture with a single smartphone
• Summary
What is point cloud scanning?
Point cloud scanning is a measurement method that acquires innumerable points in three-dimensional space for targets such as structures or terrain and digitally represents shape by the collection of those points (point cloud data). Each point contains X, Y, Z coordinate values (and sometimes information such as color or reflectance intensity), and the higher the point density, the more finely the shape can be reproduced. This technology enables rapid acquisition of complex terrain or large structures that are difficult to measure manually, and its use is expanding in construction and surveying.
There are two main methods for acquiring point cloud data: laser scanning (LiDAR) and photogrammetry. When using a laser scanner, the device emits laser light toward the target and measures the distance precisely from the time it takes to reflect back or from phase change, acquiring millions of high-precision points. Photogrammetry, on the other hand, captures the subject from various angles with ordinary digital cameras or drone-mounted cameras and reconstructs the three-dimensional shape by analyzing matching feature points among multiple images. Photogrammetry has the advantages of being low-cost and covering wide areas while also providing RGB color information, although its single-point accuracy is somewhat lower than that of laser scanners. Still, these methods allow digitalization of buildings and terrain with millimeter- to centimeter-level accuracy (centimeter-level accuracy (half-inch accuracy)).
Point cloud scanning has recently been used widely for creating survey maps, as-built verification (checking shapes after civil works), volume calculations of earthworks, and maintenance management of infrastructure. Tasks that used to take days in the field can be recorded in detail in a short time with point cloud scanning, improving productivity and reducing human error. However, there are several challenges to effectively using this powerful technology in practice. The following sections explain the main on-site challenges of point cloud scanning and corresponding solutions.
Main practical challenges
Managing positional accuracy and surveying errors (absolute coordinates / relative coordinates)
Point cloud data obtained by 3D scanning can have extremely high relative accuracy (the dimensional correctness within the point cloud), on the order of a few millimeters to a few centimeters. However, care is required to ensure absolute accuracy (the correctness of positions in a real geodetic coordinate system). Point clouds measured solely with laser scanners or smartphone LiDAR are recorded in a local arbitrary coordinate system, so they may not align with national geodetic control points or the coordinate system used in design drawings. When merging point clouds acquired in multiple sessions, small errors can accumulate and cause positional inconsistencies (registration errors). If these positional accuracy issues are left unaddressed, detailed point clouds cannot be correctly overlaid with maps or drawings, leading to potentially incorrect decisions. Therefore, it is essential on-site to establish known-coordinate reference points and implement measures to control positioning errors before and after point cloud measurement.
Scan omissions, noise intrusion, and overlooked measurement areas
Point cloud scanning can only capture what the laser or camera can see, so omissions in occluded areas (scan omissions) can occur. For example, the backsides of structures, recesses, or depressions in terrain may not be hit by points from a single scan location and thus be absent from the point cloud. Rain, dust, or strong sunlight reflections can generate noise points that scatter where no actual surfaces exist. Metal surfaces, glass, and water can also reflect or transmit lasers, producing erroneous points in surrounding areas. If the measurement area is not thoroughly checked on-site before packing up, it may be discovered later that the portion intended to be measured is not present in the point cloud. To prevent such omissions and noise, it is important to pre-identify likely occluded areas and cover them with multiple viewpoints or additional target placement.
Point cloud data size, PC performance, and portability issues
High-density point cloud data tend to generate very large files and place heavy demands on computer processing. Point clouds on the order of tens of millions of points can reach several GB in size, and standard laptops may take a long time to open them or may crash due to insufficient memory. Especially in the field, tablets and other portable devices are often too slow to display such heavy data, making it difficult to utilize the data on-site. There is also the portability issue of the laser scanner equipment itself. High-precision terrestrial LiDAR can weigh several kilograms including tripod and batteries, requiring effort to transport and set up. In mountainous or narrow areas where bringing equipment is difficult, adequate scanning may not be possible. These physical constraints—large data, underpowered PCs, and non-portable equipment—become hurdles to point cloud utilization.
Software proficiency, human resource development, and operator dependence
Specialized software for handling point cloud data (noise removal, point cloud registration, 3D modeling, etc.) is highly functional but often complex to operate, and mastering it requires time and experience. As a result, only a limited number of staff in a company may be able to use it, causing point cloud processing tasks to become person-dependent. If knowledge is not shared with newcomers and tasks are left to specific personnel, work can stall when those people are absent and result quality may vary by operator. In terms of workforce development, there are still relatively few people with specialized skills in point cloud scanning and 3D software, which can hinder on-site adoption. Because much of the software is foreign-made and Japanese-language information is limited, many field engineers feel that the learning curve is steep.
Burden of secondary processing such as cross-sections and longitudinal/transverse comparisons
Extracting useful information from acquired point cloud data requires secondary processing, which is also time-consuming. For example, in civil engineering sites it is necessary to create longitudinal and transverse profiles for as-built verification, or to compare point cloud data before and after excavation or embankment to calculate volume differences. Doing this from point clouds involves slicing the point cloud along arbitrary planes to trace lines, or computing differences between multiple point clouds. Extracting the required cross-sections from massive point sets often relies on manual work because software automation is limited. Consequently, producing drawings and calculating quantities take time, and teams often find that despite having captured point clouds, summarizing results remains laborious.
Difficulty in overlaying with drawings and design data
Overlaying and comparing point cloud data with existing 2D drawings or 3D design models is not straightforward. Point clouds are essentially collections of points and are not directly compatible with CAD or BIM object data. For example, even if you want to overlay as-built point clouds onto design CAD drawings to check for deviations, you need an environment where both can be displayed in the same coordinate system on a single screen. Some specialized software can display point clouds and design data simultaneously and check differences, but data conversion and coordinate transformation workflows between software can be complicated and introduce errors. If client drawings or existing plans exist only on paper or PDF, rigorous comparison with point clouds becomes even more difficult. For these reasons, field teams often struggle to link point cloud data with traditional drawings and report that the valuable 3D data they measured cannot be fully utilized.
Lack of cloud/file sharing and coordination with clients
Because point cloud data are large and specialized, sharing among stakeholders often does not proceed smoothly. For example, when a contractor tries to give a client or designer the acquired point cloud, file sizes of several gigabytes cannot be sent by email, and even via online storage the recipient’s download may take a long time. If the recipient lacks appropriate viewing software or sufficient PC specs, the 3D data remain unopened and effectively wasted. As a result, parties sometimes resort to handing over only conventional 2D drawings or reports instead of point clouds, and the detailed information unique to point clouds goes unused. There is still a lack of organizational information-sharing mechanisms such as cloud-based real-time data linkage or environments where clients can inspect point clouds in a browser.
Field conditions: rain, wind, and on-site display/verification
Outdoor point cloud scanning faces field-specific constraints due to weather and environment. In rain, laser light scatters on raindrops increasing noise, and devices may require waterproofing, so measurement is generally difficult. In strong winds, drone LiDAR may not be able to maintain stable flight, and terrestrial laser scanners on tripods may suffer shaking that degrades accuracy. Strong direct sunlight can cause contrast variations in photogrammetry images and reduce the accuracy of feature matching. Furthermore, it is often difficult to immediately confirm acquired point clouds on-site. Some laser scanners provide preview displays via built-in screens or tablet linkage, but these are insufficient for detailed verification, and problems or omissions may only become apparent after returning to the office for processing. If errors go unnoticed and crews pack up, re-measurement later leads to inefficiency. Inadequate measures for weather/environmental factors and lack of immediate verification procedures impede stable operation of point cloud scanning.
Solutions
Ensuring positional accuracy by combining with GNSS or RTK
The most reliable way to improve the absolute coordinate accuracy of point cloud scanning is to combine it with GNSS positioning (such as GPS) or RTK to provide reference coordinates. For ground-based laser scanners, setting up known-coordinate points (survey control points) on site before measurement and placing reflector targets or control markers nearby allows acquired point clouds to be aligned to those reference points in post-processing. For drone aerial surveys or mobile scanners, equipping the device itself with RTK-GNSS enables real-time positional correction during flight or movement while recording point cloud data. For example, an RTK-capable drone can give each photo or point cloud point centimeter-level latitude, longitude, and altitude over several hectares by simply flying over the area. Traditionally, multiple ground control points (GCPs) were installed and used for post-hoc alignment, but RTK enables on-site immediate high-precision positioning, greatly reducing post-processing effort. As a result, the completed point cloud data can be overlaid directly onto maps or design coordinate systems, resolving concerns about accuracy management.
Avoiding scan omissions through shooting plans and control points
Eliminating scan omissions requires developing a shooting/scanning plan in advance. Based on site geometry, consider from which positions and in which directions to scan to cover the entire area, and combine overhead or oblique shots as necessary. In TLS surveys, scan all around a building from multiple positions to fill occlusions and ensure sufficient overlap between point clouds when merging. In photogrammetry, supplement nadir shots with oblique aerial images and ground-based photos to capture hidden surfaces. Additionally, placing control points or target markers at key locations provides both a confirmation that an area was measured and reference points for later data integration. For example, when scanning a long tunnel in sections, marking at regular intervals so that each segment includes the marks ensures the entire alignment can be connected without gaps. These measures minimize scan omissions even for complex structures.
Lightening workflow and enabling routine use with mobile LiDAR and smartphone point clouds
Even without large equipment, mobile LiDAR and smartphones now allow easy point cloud capture. Using LiDAR sensors built into high-end iPhones and iPads, point clouds of a few-meter range can be scanned instantly with dedicated apps. Although the number of points and accuracy are inferior to stationary laser scanners, the convenience of measuring with a smartphone carried daily is a significant advantage. In addition, backpack-type and handheld LiDAR devices have emerged, enabling wider-area scanning while walking. These mobile scanners acquire on the order of hundreds of thousands of points per second and stitch data together while estimating their position through SLAM (simultaneous localization and mapping). While they do not reach the precision of high-end TLS, they can achieve accuracy on the order of several centimeters (centimeter-level accuracy (half-inch accuracy)), making them practical for daily progress records and measurements in confined areas. Because heavy equipment is unnecessary, the barrier to point cloud measurement is lowered and field workers themselves can routinely perform quick scans.
Improving shareability with cloud processing and point cloud viewers
Processing and sharing massive point cloud datasets can be dramatically streamlined with cloud services. Heavy computation such as generating point clouds from drone photos can be offloaded to high-performance cloud servers, producing results quickly regardless of the user’s local PC specs. There are services that, after uploading on-site captured photos, automatically generate point clouds and orthophotos. For sharing completed point clouds, cloud-based point cloud viewers simplify distribution: publishing the data to the cloud and sending a URL allows recipients to view and measure 3D point clouds in a browser. This approach removes the need for recipients to have specialized software or high-spec PCs. For example, site supervisors or clients can open the link on an office laptop to view the latest point cloud in 3D and check details using distance measurement and cross-section views. Multiple stakeholders viewing the same platform reduces misunderstandings and facilitates consensus-building. Storing data in the cloud also ensures the latest version is always shared, preventing errors from referencing outdated versions.
Combining with LRTK to enable high-accuracy positioning and point cloud capture with a single smartphone
One of the latest solutions is the fusion of smartphones and RTK positioning. Pocket-sized RTK-GNSS devices that can be attached to smartphones, such as Japan-origin LRTK systems, can turn a smartphone into a centimeter-class surveying instrument. For example, attaching an LRTK receiver to an iPhone allows the smartphone’s built-in LiDAR or camera scans to be automatically and in real time tagged with highly accurate position coordinates. Where conventional workflows required separate GNSS measurements of control points to adjust point clouds, combining with LRTK enables on-site simultaneous scanning and positioning, producing point cloud data that conforms to geographic coordinates without post-processing. Data can be uploaded from the smartphone to the cloud immediately, so office staff can check results in real time. The smartphone + LRTK combination weighs about 125 g and is extremely lightweight and portable, making it effective in disaster sites or other situations where large equipment cannot be brought in. By realizing “one smartphone per person” surveying, the accuracy and mobility of point cloud scanning are dramatically improved, accelerating DX (digital transformation) of field operations.
Summary
Point cloud scanning is a powerful means of digitally capturing on-site reality with millimeter-level accuracy, but its adoption and use involve various challenges from accuracy management to data processing. This article listed problems such as positional alignment, equipment and data constraints, and operational issues, and presented solutions for each. Technologies that help solve these challenges are becoming practical one after another: ensuring absolute accuracy with GNSS/RTK, streamlining data sharing with cloud services, and revolutionary workflows such as smartphone + LRTK. The important thing is to proactively adopt these new tools while combining them with field-specific measures (such as pre-planning and training). By maximizing the potential of point cloud scanning, the accuracy and productivity of surveying and construction management can be greatly improved. Detailed on-site understanding that was previously difficult becomes easier, and sharing acquired data among stakeholders will further accelerate DX in the construction and civil engineering sectors.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.