Accurate Location Data for Construction Photos! Improve On-Site Records’ Efficiency and Accuracy at Once with LRTK
By LRTK Team (Lefixea Inc.)
Table of contents
• Construction photos and location data: current issues and necessity
• Limits of smartphone GPS and location accuracy
• Centimeter-level positioning enabled by RTK
• What is LRTK? A high-precision positioning solution usable with smartphones
• Benefits of high-precision construction photo management enabled by LRTK
• LRTK also enables simple surveying
• Summary
• FAQ
On construction sites, accurately recording and managing construction progress with photos is a key to project success. However, traditional construction photo management has faced various problems such as missed shots, incorrect location records, and the huge effort required to organize many photos. For example, on large sites there can be confusion later about “where that photo was taken,” or a great deal of labor is spent pasting photos into ledgers and organizing them for each site. A new photo-recording solution that uses high-precision positioning technology, LRTK, solves these problems all at once.
With LRTK you can easily add accurate location information (coordinates) to construction photos, allowing anyone to efficiently and reliably keep on-site records. This article explains the importance of location information for construction photos and the issues with conventional methods, and describes how the high-precision positioning technology RTK and the LRTK system work. It then shows concretely how introducing LRTK improves the efficiency and accuracy of on-site records. Finally, we touch on examples of applying LRTK to simple surveying and answer common questions in FAQ format.
Construction photos and location data: current issues and necessity
Record photos on construction sites need various annotations such as shooting date and time, work type, and shooting location. Among these, the location information of “where the photo was taken” is especially important. However, in many cases photos are not linked to accurate location data, which poses a major problem for record management.
Conventionally, people manually manage photos by writing the shooting location on a blackboard or memo for each photo and creating a “shooting location map” that plots photo numbers on site drawings. This method relies heavily on the experience and memory of the responsible person, and a third party viewing only the photos later may not be able to accurately determine the shooting point. Also, manual processes for creating ledgers and location maps are error-prone, and the burden of organizing and cross-checking a vast number of photos is a recognized problem.
Construction supervisors have reported comments such as, “We have a huge number of photos, but we can’t make use of them because we don’t know the important locations,” and “Explaining locations takes time and makes report creation inefficient.” If photo location information is unclear, the recorded photos cannot be fully utilized for later verification or sharing. From the perspectives of quality control and safety management, it is important to know clearly “when and where” a photo was taken, and this also affects the reliability of photos as evidence in case of problems.
As described above, adding accurate location information to construction photos is indispensable for increasing the reliability and usefulness of on-site records. So why has positional accuracy been insufficient in conventional approaches? Let’s look at the specific causes and background.
Limits of smartphone GPS and location accuracy
Why has it been difficult until now to add accurate location data to construction photos? One reason is the limitation of positioning accuracy of GPS built into commercial digital cameras and smartphones.
Typical smartphone GPS (GNSS) positioning uses a method called standalone positioning, which calculates the current location relying only on signals from satellites. This method has large errors, and it is not unusual for horizontal positions to be off by several meters to around 10 m (32.8 ft). Especially near high-rise buildings or in mountainous areas, signal reflection and blockage can cause large position shifts or unstable positioning. While a smartphone map app may show your approximate current location, it is difficult to indicate the location with the precision needed for construction photo records—such as “which survey stake” or “which side of the road” the photo corresponds to.
Also, smartphone altitude (height) information is even less accurate than horizontal position and is not suitable for accurately determining ground elevation. On construction sites, three-dimensional position management including vertical direction is important, but ordinary GPS could not meet this need.
Due to these limitations of conventional technology, some have thought that “even if you add location information to photos, you can’t trust it” or “the data can’t really be used.” That is where the RTK (Real-Time Kinematic) method, which dramatically reduces positioning errors, comes in. By improving satellite positioning accuracy to the centimeter level with RTK, the practical use of location information on construction photos has become possible. Next, let’s look at how RTK works and its features.
Centimeter-level positioning enabled by RTK
RTK (Real-Time Kinematic) is a technique that dramatically reduces GNSS positioning errors. Standalone GPS positioning used to have meter-level errors due to atmospheric effects and satellite orbit errors, but RTK can reduce these to a few centimeters. The mechanism is that both a reference station (base) and a mobile station (rover) perform satellite positioning simultaneously, and the reference station’s position error is sent in real time to the rover as correction information. The reference station is set up at a point whose coordinates are known accurately in advance, and the error data obtained there is used to correct the rover’s positioning results. This compensates for satellite signal error factors and enables current position to be determined with centimeter-level accuracy.
In recent years in Japan, network RTK positioning using the Geospatial Information Authority of Japan’s electronic reference station network has been spreading. This system allows receiving correction data (such as VRS) from nearby reference points in real time via mobile communication without installing a dedicated base station on site, enabling cm-level positioning anywhere nationwide. Also, by using CLAS (Centimeter-level Augmentation Service) provided by Japan’s quasi-zenith satellite “Michibiki,” reinforcement signals can be received directly from satellites in areas outside mobile communication coverage, improving positioning accuracy even in mountainous regions. With these technologies, extremely high accuracy positioning is possible—about 2-3 cm (0.8-1.2 in) horizontally and about 3-4 cm (1.2-1.6 in) vertically—without special surveying equipment.
With centimeter positioning via RTK available, adding location information to construction photos is transformed. Whereas conventional meter-level errors made location data only a rough reference, RTK allows nearly error-free identification of the shooting point for each photo, greatly evolving photo management. However, traditional RTK equipment has been specialized and expensive, so it has not been accessible to everyone on site. That led to the development of LRTK, a high-precision positioning solution that anyone can use with a smartphone. The next section introduces LRTK and its features.
What is LRTK? A high-precision positioning solution usable with smartphones
LRTK is the name of the high-precision RTK positioning solution we provide. It was developed to make centimeter-level positioning—previously requiring fixed GNSS receivers or surveying instruments—easier to use on site. Its main feature is that it can be used in combination with smartphones and tablets. By attaching a dedicated compact GNSS device to a smartphone, launching an app, and tapping once, you can obtain a high-precision current position on the spot. No difficult settings or specialized knowledge are required, and positioning can be performed with the same ease as taking a photo with a smartphone camera, so site staff who are not surveying experts can use it.
LRTK comes in several variations to strongly support on-site records. These include LRTK Phone, which links smartphone camera images with position measurements; LRTK 360, an integrated 360° camera that can record the entire site panorama; LRTK LiDAR, which utilizes the smartphone’s built-in LiDAR scanner; and models for mounting on drones. All support RTK centimeter-level positioning, allowing accurate position coordinates to be obtained simultaneously with photography or scanning.
For example, LRTK 360 integrates a high-sensitivity GNSS receiver and a high-resolution 360° camera into a single device, so pressing the shutter records photos of all directions around you and the shooting position (latitude, longitude, height) at the same time. The captured data is saved to the smartphone app on site, and uploading to the cloud automatically organizes and displays it on a map. By using LRTK in this way, recording photos and location information can be completed in one action, dramatically improving the efficiency and accuracy of on-site records.
Next, let’s look at the specific benefits for on-site record improvement that LRTK provides.
Benefits of high-precision construction photo management enabled by LRTK
What positive changes occur in managing construction photos by introducing LRTK? High-precision location information and convenient data linkage dramatically improve the efficiency and accuracy of on-site records. Let’s go through the main benefits.
• Prevents omissions: Using a 360° camera records the entire surroundings in a single shot, so you don’t have to worry about forgetting to photograph a particular direction. You can capture the site situation without omissions, preventing mistakes like “we don’t have a photo from that angle.”
• High-precision location tags: With LRTK’s RTK-GNSS positioning, photos are automatically tagged with centimeter-level coordinates. Ordinary smartphone GPS can be off by about 5-10 m (16.4-32.8 ft), but RTK can reduce errors to about 3 cm (1.2 in). This removes record mistakes of “we don’t know where this was taken,” giving even beginners confidence that they will not fail to record locations correctly.
• Real-time accuracy confirmation: You can check positioning accuracy (RTK Fix status, etc.) in real time on the app when shooting, so you can confirm you are obtaining high-precision data before recording. Even non-experts can ensure quality by photographing only when accuracy is guaranteed. If radio conditions are poor, CLAS support from Michibiki allows positioning even outside mobile coverage, enabling stable recording of geotagged photos in mountainous areas.
• Automated data organization: Captured photo data is organized on a map as soon as it is uploaded to the cloud, and can be managed chronologically—eliminating the need to manually name files or paste them into ledgers. Human organizational errors disappear and omissions in records are prevented.
As described above, LRTK can greatly reduce missed shots and location recording mistakes. Furthermore, by centrally managing and utilizing photo data in the cloud, many benefits arise for site operations.
• Save the entire site situation: Even for large construction sites, 360° images and accurate location information for each shooting point preserve the whole site. If you regularly shoot the same points from before construction to completion, you can review progress chronologically and see changes or problem areas at a glance.
• Easier progress management and reporting: Photos recorded with LRTK can be listed on a cloud map with pins indicating shooting locations. Managers can get an overview of the entire site by viewing all shooting points on the map. Also, arranging photos chronologically allows intuitive comparison of before-and-after states, making it easy to show progress. Creating photo-attached reports becomes smooth and explanations gain persuasive power.
• Smoother communication: Accumulated site photo data in the cloud can be shared via links among stakeholders so that they can view it from remote offices. This lets supervisors, clients, and subcontractors virtually experience the same situation, reducing misunderstandings and speeding up meetings and instructions. Sharing realistic site conditions with geographically separated members activates team communication.
• Strengthened quality and safety management: Because record photos are tagged with accurate location coordinates and shooting timestamps, their reliability as evidence for quality and safety management increases. If a problem arises later, you can accurately trace “when, where, and what the condition was,” aiding root-cause analysis and countermeasure planning. Accumulated daily photo records also help early detection and prevention of construction defects.
• Integration with surveying data: Photo data acquired with LRTK is unified in a global coordinate system, making it easy to combine with other surveying results and design data. In the cloud you can overlay photos with 3D point-cloud data (from LiDAR scans or photogrammetry) and measure distances or areas that cannot be measured directly from photos. Centralizing photos and surveying data greatly improves efficiency in tasks such as as-built drawings creation and volume calculations.
LRTK also enables simple surveying
LRTK is not only for photo records; it can be used for simple on-site surveying. Using a dedicated smartphone app (for example LRTK Phone), you can combine photo capture and the smartphone’s built-in LiDAR scan to measure dimensions or cross-sectional shapes of distant locations in a short time. It is also possible to generate 3D point-cloud models from drone aerial photos or multiple images taken by a smartphone and calculate volumes and areas. Tasks that previously required specialized equipment and skilled operators—such as surveying and as-built management—can be performed easily by anyone with LRTK tools.
By introducing LRTK, you can digitize both construction records and as-built measurements end-to-end, greatly improving operational efficiency. Because site staff can complete both photo recording and surveying data collection themselves, you can gather necessary information without outsourcing or adding personnel. LRTK is a powerful tool for promoting on-site DX (digital transformation).
Summary
Adding accurate location information to construction photos will become the standard for record management on future construction sites. With improved photo reliability and usability, site productivity and quality management will also undoubtedly level up. LRTK makes photo management—which used to require significant time and labor—vastly more efficient and greatly improves recording accuracy. In an industry facing labor shortages and challenges in promoting DX, solutions like LRTK can be a major force for on-site reform.
The LRTK series enables high-precision GNSS positioning in construction, civil engineering, and surveying fields, improving surveying accuracy and dramatically increasing work efficiency. It also supports the Ministry of Land, Infrastructure, Transport and Tourism’s i-Construction initiative, strongly promoting on-site digitalization. For more information, see the [LRTK official site](https://www.lrtk.lefixea.com/).
Experience the new way of on-site records with construction photo management that includes accurate location information. Please feel free to contact us with any questions or for consultation on introduction. Use LRTK to evolve your site to the next stage.
FAQ
Q: What is needed to start photo records with LRTK? A: Basically, you need the LRTK device itself and a smartphone/tablet to operate it (with the dedicated app installed). A network connection environment (mobile data or Wi‑Fi on site) is desirable for using cloud services, but positioning itself can be performed offline because CLAS satellite augmentation signals are supported. After recording, you can connect to the network at the office and upload data to the cloud for organization and sharing.
Q: Can all site staff operate it even if they are not tech-savvy? A: Yes, it can be operated without special IT skills. LRTK is designed for ease of use and operates almost the same way as taking photos with a smartphone. With a brief operation explanation in advance, even those unfamiliar with IT or new employees can handle on-site records. Conversely, tools that only a few people can operate prevent broad information sharing, so LRTK’s ease-of-use is a major advantage for promoting site-wide DX.
Q: Does it really achieve centimeter-level accuracy? A: If RTK functions normally, you can expect about 2-3 cm (0.8-1.2 in) horizontally and about 3-4 cm (1.2-1.6 in) vertically. Actual accuracy depends on satellite signal reception conditions, but with LRTK you can record while checking accuracy in real time, so by shooting when accuracy is confirmed you can always obtain high-precision data. If RTK is not available, recording is still possible but will have errors of several meters similar to ordinary GPS positioning. For important situations, confirm RTK is in Fix status before shooting to reliably obtain high-precision records.
Q: Can it be used indoors or underground? A: High-precision positioning requires receiving satellite signals, so usage is basically intended for outdoor, open-sky environments. RTK positioning is difficult indoors or underground where GNSS signals do not reach, though photography itself is still possible. Note that position information recorded in such places will have large errors. With some ingenuity—such as combining coordinates of reference points obtained outdoors with indoor photos—it may be possible to apply it to indoor records.
Q: How are captured data stored and shared? A: Captured data is saved on the smartphone or tablet and is generally uploaded to the cloud for project-based management. Using the LRTK cloud, photos are automatically mapped, can be listed, and compared chronologically. Cloud data can be shared via links among people who know them, allowing anyone to view or download. Configure cloud access permissions according to your company’s security policy and operate safely.
Q: You mentioned surveying use—specifically what can be done? A: LRTK systems include features that support simple surveying. For example, using a dedicated app on a smartphone or tablet, you can obtain dimensions and cross-sectional shapes of distant locations quickly via photo capture or LiDAR scanning. You can also generate 3D point-cloud models from drone aerial photos or multiple smartphone images and compute volumes and areas. In short, parts of surveying and as-built management that used to require specialized equipment and advanced skills can be done easily with LRTK tools. This enables digitization of recording and as-built measurement, significantly improving work efficiency.
Q: Will the benefits justify the introduction cost? A: Initial investment in equipment and systems is required, but benefits are expected to exceed that. For example, personnel costs and days spent on recording tasks are reduced, and time spent on report preparation and issue response is shortened. Rental costs for surveying instruments and the number of re-surveys decrease, contributing to cost reduction. Accumulated data also facilitates future construction planning and knowledge transfer, yielding significant qualitative benefits. Considering productivity gains and risk reduction from site DX, the return on investment can be ample.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.