Five Ways Drone Point Clouds Improve Safety by Eliminating Scaffolding in Dam Inspections
By LRTK Team (Lefixea Inc.)
Table of contents
• Current state and challenges of dam inspections
• What are drones and point cloud technology
• Five ways to enable inspections without scaffolding
• Practical implementation points
• Prospects for using high-precision GNSS
• Conclusion
Current state and challenges of dam inspections
Dams are massive concrete structures, and over years of operation they can develop cracks, leaks, and surface deterioration. In Japan, dam managers are required under the River Act to carry out regular inspections of embankments, spillways, and other components to verify structural soundness. However, dam inspection work has long involved many challenges. For example, when an embankment exceeds 100 m (328.1 ft) in height, simply erecting scaffolding to allow personnel to visually inspect from the top to the foundation can take several weeks. Also, because the embankment surface area can reach tens of thousands of square meters, thoroughly checking such a wide area within a limited time is not easy. Furthermore, inspecting the reservoir-side wall often requires launching boats and assembling temporary scaffolding on the water, making safety measures extremely costly.
Such high-altitude and over-water work poses significant danger to workers, and the risk of fall accidents cannot be ignored. Large-scale scaffolding installation and arranging specialized work vehicles also involve enormous costs, creating a heavy financial burden and causing downtime during long-term works. In addition, with traditional methods that rely on skilled technicians conducting close visual and sounding inspections, maintaining a stable inspection system has become difficult amid aging technicians and labor shortages. Against this backdrop, there has been a strong demand for new technologies that can inspect dams safely and efficiently without the use of scaffolding.
What are drones and point cloud technology
Recently gaining attention are inspection methods using drones (unmanned aerial vehicles) combined with three-dimensional point cloud data technology. Drone inspection uses small unmanned aircraft equipped with cameras and various sensors to remotely observe and record the condition of structures. Drones can safely approach high or hazardous locations that humans cannot access, enabling capture of photos, videos, and sensor data. Adoption has progressed especially for large-scale infrastructure such as bridges and dams, and drones are expected to be a solution to challenges like aging structures and labor shortages.
Point cloud technology represents the shape of objects or terrain in three dimensions as a collection of many points. By computer-analyzing numerous photos taken by drone aerial photography, you can derive millions of points that make up the target’s surface and build a 3D model. In photogrammetry, software matches common feature points that appear in multiple images and computes each point’s coordinates using triangulation principles. The resulting point cloud data often include color information for each point, enabling construction of highly detailed 3D models that faithfully reproduce structures as if viewing the real thing.
The advantage of generating point clouds via photogrammetry is above all its ease and cost efficiency. Even without expensive laser scanners, you can create high-resolution 3D data using a handheld camera and a PC or cloud service. With drones you can capture wide areas quickly, making it possible to safely digitize dams in mountainous areas or high structures that are difficult to access from the ground. Recent advances in software and hardware performance allow fast processing of hundreds of photos, and under suitable conditions photogrammetry can produce point cloud models with millimeter-level precision (0.04 in level).
Drone photogrammetry complements laser surveying. UAV-mounted laser scanners are effective where photos struggle to capture points—under trees or in shadowed parts of structures—while photogrammetry excels at obtaining high-density point clouds with color information at low cost. The current trend in drone surveying is to combine photogrammetry and laser scanning according to site conditions to balance efficiency and accuracy.
By combining drones with point cloud technology, you can now digitally record and analyze the dam’s as-is condition as a complete 3D model. The next section details the concrete effects this approach brings to scaffold-free dam inspections from five perspectives: safety, cost, accuracy, data sharing, and work efficiency.
Five ways to enable inspections without scaffolding
3D point cloud creation by drone photogrammetry is dramatically changing the conventional dam inspection practice of erecting scaffolding for close visual inspection. Here are five main benefits that drone point cloud technology brings to enable scaffold-free inspections, described in terms of safety, cost, accuracy, data sharing, and work efficiency. Let’s compare each with conventional methods.
From a safety-improvement perspective, drone inspections greatly reduce the need for workers to go to hazardous locations such as high dam slopes. Because high-altitude work using scaffolding or gondola-like suspended platforms becomes unnecessary, the risk of fall accidents can be reduced to essentially zero. Replacing unstable cliff- or over-water tasks with machines significantly enhances inspector safety. Special high-altitude work qualifications or advanced rope techniques are no longer required, creating an environment where anyone can safely participate in infrastructure inspection.
From a cost-reduction perspective, using drones to eliminate temporary scaffolding and high-altitude work vehicles removes the costs of installing and removing those structures. In practice, substituting drone inspections for large-scale scaffolding eliminates those installation costs, and there are reported cases of substantial reductions in inspection expenses compared with traditional methods. Because heavy equipment and personnel no longer need to be tied up for long periods, labor and equipment rental costs can also be dramatically reduced. As a result, inspections can be performed more frequently within limited budgets, lowering long-term preservation costs for dams. Indirect costs are also reduced because facilities no longer need to be shut down or lengthy preparation periods scheduled for scaffolding assembly.
Regarding accuracy improvements, high-density point cloud data acquired by drones can record a dam’s condition with millimeter-level precision (0.04 in level). Very fine cracks and slight bulging or deformation of concrete surfaces can be accurately measured on a 3D model, enabling early detection of anomalies that visual inspections would miss. For example, cracks at distant high locations that are difficult to discern with the naked eye can be digitally measured for width and length from point clouds generated from drone images. Regularly acquiring and comparing point cloud data of the same locations allows quantitative monitoring of aging and displacements, aiding dam health assessments and repair planning. Moreover, photogrammetric point clouds include color information for each point, so discoloration of concrete, water stains around cracks, and algae growth can be intuitively identified. Colorized detailed models make locating anomalies and evaluating deterioration straightforward—another major advantage.
Data sharing is also greatly simplified. 3D models obtained by drones are digital and easily stored and duplicated, making information sharing among stakeholders markedly easier. For instance, orthophotos or 3D models generated from point clouds let office personnel inspect dam conditions in detail on a PC without visiting the site. Designers, managers, and owners can view the same data, facilitating remote expert consultation and cross-departmental discussions. Completed 3D models and high-resolution orthomaps are also useful as materials in reports and drawings, helping to communicate convincingly to clients and local residents. Once digitized and stored, the data can be used for future repair design or compared with past states during disasters, making it applicable to long-term infrastructure management.
In terms of work efficiency, drone adoption dramatically streamlines the time and effort required for inspections. Because drones can capture wide areas at once, surveys that used to take days to weeks can be completed in hours to days. There are cases of significant schedule reductions and personnel savings, and with drones and automated analysis software it’s possible to record site conditions at a consistent accuracy without relying on veteran craftsmen. Thus, small teams can efficiently perform inspections and surveys, helping to address labor shortages. Objective digital data also enables decision-making without depending solely on experienced technicians’ intuition, contributing to standardization and skill transfer. As described above, drone and point cloud technologies provide broad advantages from safety to cost and efficiency, enabling smart inspections that do not rely on scaffolding.
Practical implementation points
While drone point cloud technology offers many advantages, there are several points to consider when implementing it in practice. First is compliance with regulations and safety management. When flying drones for business purposes in Japan, prior permission or approval from the Ministry of Land, Infrastructure, Transport and Tourism may be required depending on the flight location and method. For example, flights over areas close to populated places, beyond-visual-line-of-sight flights, or nighttime flights require application procedures under the Aviation Law and a flight plan. Licenses may also be required depending on the aircraft weight and flight characteristics. For safe operation, drone pilots must receive adequate training and have correct knowledge of relevant laws and safety measures.
Next, data accuracy management is important. To obtain high-precision 3D models from drone photogrammetry, plan flights to ensure sufficient image overlap and, when necessary, place known ground control points. Recently, more drones are equipped with RTK-GNSS receivers, allowing the aircraft to record centimeter-class self-positioning in real time; this can ensure high survey accuracy with fewer control points. Under certain conditions, RTK-capable drones have produced results within a few centimeters (within roughly an inch) even without ground control points. However, for projects with high accuracy requirements, it is recommended to place check points for quality assurance and measure errors. Even when using RTK drones, establishing a few control points to verify the final product’s accuracy provides additional assurance.
Establishing a data processing workflow should also be considered before implementation. Generating point cloud models from the many photos captured by a drone requires photogrammetry software or cloud services. Currently there are many options, from high-performance commercial software to free open-source tools, and they can output point clouds and orthophotos automatically from uploaded photos. The resulting point cloud data can be used in dedicated viewers, or imported into CAD and GIS software. Saving in standard formats allows integration with other survey data and simplifies incorporation into existing maintenance-management systems. There is also a trend toward combining cloud services and real-time processing for immediate field use: sending large photo datasets directly from the site to the cloud and viewing the automatically processed 3D model on a tablet enables on-site confirmation, allowing measurements and decisions to be made without waiting for analysis results.
Other considerations include planning that matches site conditions and operational systems. Mountainous dam sites are prone to sudden strong winds or dense fog, so selecting a date and time with safe weather is necessary. GNSS reception may be unstable directly below a dam, so consider choosing aircraft with high-precision inertial navigation systems depending on conditions. During flights, enforce safety measures such as restricting third-party access and stationing observers, and perform a risk assessment in advance for possible aircraft crashes. If your organization lacks in-house specialists, one option is to collaborate initially with an experienced drone inspection service provider to accumulate know-how and gradually internalize operations. Finally, consider how to integrate the derived mapped data into existing maintenance processes. For example, if you establish a system that automatically detects deterioration from point clouds and updates asset registers, you can reduce the workload of traditional report creation and centrally manage and effectively use digital data.
Prospects for using high-precision GNSS
As mentioned, equipping drones with RTK-GNSS already contributes greatly to improving photogrammetric accuracy, but there are broader prospects for using high-precision GNSS positioning in the field. A representative example is a new surveying method using smartphones and GNSS. Recently, ultra-compact RTK-GNSS receivers that attach to smartphones have emerged, making simple 3D surveying with a smartphone increasingly feasible. For example, LRTK is a high-precision GNSS device that attaches to the back of a smartphone and provides centimeter-level positioning to photos taken with the phone using RTK technology. Taking several photos with a dedicated app can automatically generate a 3D point cloud model aligned to global coordinates on-site, allowing immediate measurement of distances, areas, and volumes. This is a revolutionary solution that enables precision surveying that formerly required expensive equipment and specialized skills to be completed with a single smartphone.
Using devices like LRTK makes it easy to obtain 3D point clouds in narrow areas or indoor spaces where drones cannot fly. While drone aerial photography is effective for capturing the overall condition of a large dam, smartphone surveying is powerful for detailed measurements around locally erected scaffolding during repairs, or for indoor inspections of tunnels and dam equipment buildings. Even in GPS-denied environments or places with restrictions on drone flights, you can collect necessary data with a smartphone in hand, greatly expanding field applicability. The devices are lightweight and portable, and because point clouds are constructed in real time on the smartphone screen, anyone can intuitively start 3D scanning. Point cloud data obtained in this way already have absolute coordinates, eliminating the need to align them with other survey data during post-processing.
Combining smartphones with high-precision GNSS is beginning to offer a new option for infrastructure management. Drones remain suitable for surveying large areas, but combining them with easy smartphone surveying for detailed supplementary measurements and routine inspections will further expand the scope of point cloud utilization. Because companies will be able to obtain 3D data without acquiring all expensive dedicated equipment, the barrier to adoption will fall, contributing to the DX of infrastructure maintenance. Moreover, in the future it is expected that 3D models obtained by combining smartphones or tablets with high-precision GNSS will be overlaid in AR at the site, allowing on-the-spot visualization and verification of drawings or design models. By using drones for macro inspections and smartphone measurements with devices like LRTK for micro, high-precision data acquisition, the accuracy and efficiency of dam inspections will continue to improve.
Conclusion
Introducing drones and point cloud technology into dam inspections is freeing people from the hazardous high-altitude work that once relied on scaffolding, and is making it increasingly possible to assess structural condition safely and precisely without erecting scaffolding. These technologies demonstrate outstanding benefits across safety, cost, accuracy, data sharing, and work efficiency, and can rightly be called game changers for maintaining aging social infrastructure. Unmanned and digital approaches make inspections and diagnoses less dependent on skilled practitioners’ intuition and experience, ushering in an era where anyone can make objective decisions based on data. With the spread of high-precision GNSS devices, it will become easier to obtain and use three-dimensional data in the field, accelerating the DX of infrastructure inspections. In the dam inspection field as well, scaffold-free methods using drone point clouds are expected to become standard, enabling smart maintenance that achieves both dramatic safety improvements and operational efficiency. Actively adopt new technologies and prepare for future-oriented infrastructure management.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.


