Realized with LRTK! A New Norm in Cross-Section Drawing Creation Changed by AR Display and Improved Accuracy

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

A new revolution is underway in the indispensable field of "cross-section drawing creation" for civil engineering and construction sites. Cross-sections of terrain and structures play a crucial role in linking design and construction, but traditionally it has been common for surveying and drafting to require significant time and effort. However, with the emergence of LRTK, which combines high-precision GNSS and 3D scanning technologies, that convention is about to change dramatically. From point cloud data easily acquired on-site, cross-sections can be generated instantly and compared and verified intuitively via AR (augmented reality) display — a new era of cross-section creation has begun, delivering unprecedented speed and accuracy.


This article reviews the importance of cross-section creation and the conventional challenges, and introduces the innovative solutions LRTK brings. From point cloud scanning to section extraction, cloud-based drawing generation, and AR-based before-and-after construction comparisons, we explain in detail how the workflow for creating cross-sections changes. Directed at practitioners such as surveyors, construction managers, designers, and municipal staff, we also cover concrete on-site use cases, user-friendliness for beginners, and the benefits of adoption. Discover the power of LRTK, which ends the era of inefficient traditional methods and establishes a new norm in cross-section creation.


Importance of Cross-Section Creation and Traditional Challenges

In works such as roads, rivers, and land development, cross-sections (transverse and longitudinal profiles) are indispensable for understanding terrain undulations and relative heights of structures. Cross-sections not only show planned sections at the design stage but also serve as key drawings for quality control and construction planning by confirming whether constructed forms during or after construction match the design and by calculating earthwork volumes. However, the process of creating these important cross-sections has long been beset by several traditional challenges.


The main challenges are as follows:


• Time lag until drafting: It took time to produce drawings in the office based on data surveyed on-site, meaning that cross-sections reflecting the current conditions were not available immediately. When outsourced to surveying companies or design consultants, data processing and drawing delivery could take several weeks to a month, and in some cases construction had to be paused during that period.

• Concerns about accuracy and comprehensiveness: Traditional cross-section surveying measured heights at points every few meters and drew sections from those points, but fine terrain changes between survey points tended to be missed. In complex curved surfaces or terrain with many irregularities, it was difficult to grasp accurate shapes with only representative points, and difficult-to-measure locations sometimes relied on craftsmen’s intuition, creating a risk of omissions not reflected in the cross-sections.

• Inefficiency and cost increase due to division of labor: When surveying, drawing, and inspection are handled by different personnel or departments, data handover and communication require effort. Because specialized CAD operators were needed to produce drawings, there were labor costs for skilled personnel and expensive software license fees. Every time a design change occurred, requesting revisions from an external contractor incurred additional costs and time, hindering flexible responses on-site.

• Burden of precision equipment and work: High-precision cross-section measurement required expensive surveying instruments such as total stations and 3D laser scanners, with initial investments on the order of millions of yen being a significant barrier. Furthermore, securing and training technicians capable of operating such equipment entailed costs and time. Amid labor shortages, reliance on skilled surveyors continued. In addition, locations that are difficult or dangerous to measure, such as cliff tops, slopes, underside of bridges, or narrow tunnels, posed challenges in obtaining sufficient cross-section data.


Due to these issues, the long-standing on-site norm has been that "creating cross-sections is time-consuming and labor-intensive." However, a solution that overturns that norm has emerged: point cloud scanning and AR technology leveraging LRTK, which combines a smartphone with high-precision GNSS.


Efficient Cross-Section Data Acquisition via Point Cloud Scanning

LRTK is a surveying system that attaches a compact high-precision GNSS receiver called the "LRTK Phone" to a smartphone (iPhone/iPad). It is designed to make 3D measurement, which previously required veteran surveying technicians and expensive equipment, easily achievable with a single iPhone. By launching the LRTK app on-site and holding up the smartphone while walking as if shooting a video, you can acquire large amounts of point cloud data of the surrounding terrain and structures. Thanks to the iPhone’s LiDAR scanner (laser) and camera technologies, hundreds of thousands to millions of 3D points can be collected in a short time, and each point in the point cloud is recorded with the absolute coordinates (world coordinates) obtained from LRTK’s high-precision GNSS.


This point cloud scanning is revolutionary because it provides high-precision cross-section data that covers details previously difficult to measure. For example, when measuring road or river cross-sections, traditional methods estimated sections from points measured along equidistant survey lines, but with LRTK you can scan the entire road or both banks of a river and later extract cross-sections at any position. Subtle irregularities on slopes, changes in embankment gradients, and surface deformations of structures are all captured in the data, allowing three-dimensional understanding of changes that are otherwise hard to see.


Moreover, a key strength of LRTK is its positioning accuracy. Using RTK-GNSS technology, the smartphone’s position is corrected in real time by receiving correction signals from satellites, so the resulting coordinates are within roughly ±2 cm (±0.8 in) error in plane position. Because all scanned points are positioned with this level of accuracy, dimensional measurements and elevation checks on the resulting cross-sections can be trusted. The LRTK 3D measurement method also complies with the Ministry of Land, Infrastructure, Transport and Tourism’s new standards (i-Construction-compatible as-built management procedures), providing quality acceptable for use in public work as-built inspections.


Acquiring point clouds is intuitive and speedy. Even less experienced staff can start according to the LRTK app guidance and simply move the smartphone toward the target to automatically generate point clouds. Cumbersome post-processing or coordinate alignment work is unnecessary; the data measured on-site is immediately reflected in a known coordinate system (such as plane rectangular coordinates). Thus, the high-precision point cloud data just acquired on-site can be used directly as the source data for cross-section creation.


Instant Cross-Section Generation and Precise Measurement in LRTK Cloud

Point cloud data and positioning point data obtained with LRTK can be synchronized and utilized on the cloud-based web app "LRTK Cloud." In the cloud, you can view 3D point clouds directly from the browser and use various measurement and drawing tools. One powerful feature is the cross-section generation function. By specifying any two points on the acquired point cloud model, longitudinal and transverse profiles along that line can be drawn instantly. Traditionally, one had to import point clouds into CAD software and create cut sections, but with LRTK Cloud you can display current cross-sections with a single click, allowing you to quickly extract the required section shapes from on-site surveyed data.


On the displayed cross-section, you can perform detailed measurements and obtain information. By pointing the mouse at the cross-section graph, you can check the elevation and coordinate values at that point. For example, you can read the lowest elevation of a riverbed or the curb height differences at both ends of a road on the spot. You can also intuitively measure the distance between two points on the section or calculate gradients. For instance, you can display an embankment cross-section and measure the difference from the design elevation, or calculate the distance and elevation difference between a slope’s crest and toe — in short, you can directly compute dimensions you need on the drawing.


Cross-sections are not only viewable on-screen but can also be exported as CAD data when required. If you export cross-section lines as DXF from LRTK Cloud, you can import them into CAD drawings in the conventional workflow. Many public works require formal transverse drawings as deliverables, but with LRTK you can convert cross-sections created from on-site point clouds into DXF and reuse them in submission documents. It is also easy to paste cross-section images created in the cloud into reports or output numerical tables, so the time from cross-section creation to deliverable production can be greatly reduced, which is a significant advantage.


Using LRTK Cloud’s cross-section tools, you can complete the workflow from on-site scanning → immediate cloud-based sectioning → dimensional checks in one stop. If additional cross-sections are needed later, there is no need to return to the site for additional surveying; you can freely cut sections from already-acquired point cloud data, allowing prompt response to design changes or additional verifications. Being able to obtain accurate cross-sections in near real-time will dramatically improve the speed and accuracy of construction management decisions.


AR Display for Before-and-After Construction Comparison and Design Data Verification

LRTK also includes a 3D data AR display (augmented reality) function, allowing drawings and models to be visualized overlaid on actual site footage. By projecting acquired point cloud data or 3D design models onto the site through a smartphone or tablet camera, intuitive comparisons of before-and-after construction states and verification against design drawings become possible.


For example, by AR-displaying a terrain model scanned before construction and comparing it with the current post-construction terrain, you can immediately see where and how much soil was added or removed. Differences in cut-and-fill volumes, which were previously examined by overlaying drawings before and after construction or judged by visual estimation on-site, can be checked on the spot with AR. Also, if 3D design data (BIM/CIM models or design surfaces) are uploaded to LRTK Cloud, you can overlay the design model on-site in AR. Projecting semi-transparent design shapes over the actual terrain or structures lets you verify on-site whether construction locations and heights match the design. For example, you can visually confirm via AR whether a slope’s finishing gradient matches the design or whether the height of a bridge pier conforms to design values.


AR display supplements spatial perception that is difficult to grasp from drawings and is powerful for aligning understanding among stakeholders. Showing the finished image through a smartphone screen to clients or site representatives enables them to share a completed image that is hard to imagine from paper drawings. If 3D models of buried pipes and cables are prepared, they can be visualized underground in AR. Displaying buried pipelines semi-transparently to confirm excavation positions in advance or to warn against accidental damage are practical uses that overlay virtual information on the real landscape, contributing to safety management.


A notable strength of LRTK’s AR function is that high-precision positioning makes model misalignment extremely small. Once AR display is started, the model remains aligned with real-world coordinates without special target markers or manual adjustments. Even when walking around the site, virtual objects stay fixed in place on the screen, eliminating frustrating visual shifts such as “the object should be here but looks slightly offset on the screen.” This reliability allows confidence when using AR for as-built management and inspections. There is also a function to take screenshots of points of interest on the screen and save/share them as record photos, making it easy to retain AR verification results as evidence.


By utilizing LRTK’s AR display, you can use the site itself as a canvas to reconcile design and construction. Being able to close the gap between drawings and the actual site on the spot helps prevent rework and facilitates consensus building. Tasks that were previously brought back to the office for verification can now be performed immediately on-site, dramatically streamlining the cross-section creation and confirmation process.


Wide Range of Use Cases: Slopes, Structures, Embankments, Buried Pipes, Rivers

LRTK’s cross-section creation and AR utilization support practitioners across various civil engineering and construction scenarios. Below are representative use cases.


• Slopes: Cross-sections are indispensable for managing slopes formed by cutting and filling. Scanning the entire slope with LRTK provides accurate cross-section profiles including irregularities and unevenness. During as-built inspections, compliance with planned gradients can be confirmed instantly, and signs of distortion or collapse can be identified from the point cloud. Dangerous steep slopes can be scanned remotely, enabling safe detailed shape recording.

• Structures: LRTK is effective for cross-section measurement of structures such as tunnels, bridges, and retaining walls. For example, point cloud measurement inside a tunnel can produce cross-sections to quantitatively assess deformation or shrinkage of the internal space. For bridges, it can be used to plot clearances under girders or measure pier tilt. Scanning completed structures enables future inspections to compare with past data, and cracking areas can be 3D-modeled for repair design.

• Embankments and cuts (earthwork): In shaping road embankments and development sites, soil must be added or removed to achieve specified cross-section shapes. With LRTK, you can survey the entire embankment even during construction and check overages and shortages from the specified cross-section lines. Comparing design cross-section data and current point clouds in the cloud makes it obvious where additional soil is needed. For progress management, which requires calculation of cross-sectional areas and accumulated cross-sectional area-based earthwork volumes, automatic calculation from point cloud data streamlines the production of earthwork volume reports.

• Buried pipes: LRTK is a great aid for buried infrastructure works such as water/sewer pipes and cable ducts. After trench excavation and pipe installation, recording the trench cross-sectional shape and pipe gradients with point clouds lets you accurately know installed positions and depths even after backfilling. With AR display, the route of buried pipes can be visualized on the ground so equipment operators are aware of “invisible pipes,” helping prevent accidents. For future maintenance, LRTK-acquired 3D pipe data can be referenced to efficiently locate and excavate.

• Rivers: Cross-sections of river channels are vital information in river works and flood control. Whereas traditional methods required survey staff to wade across rivers and measure depths or perform leveling surveys to create sections, LRTK can capture wide-area terrain by walking riverbeds and levees. You can create river cross-sections at arbitrary positions from the acquired point clouds to grasp channel shapes and deposition conditions. It is easy to compare post-flood riverbed changes using scan data or quantitatively show cross-section changes before and after dredging. Using AR display to show planned levee height lines on-site can also be useful for public briefings to residents.


As described above, LRTK’s cross-section creation solution meets diverse on-site needs. From surveyors to construction managers, each role can quickly and accurately obtain the cross-section information they require, contributing to overall workflow efficiency and quality improvement.


CAD Data Integration and Application to Report Creation

Data acquired and generated with LRTK can smoothly integrate with existing CAD software and reporting workflows. As mentioned earlier, cross-section lines and survey point data can be exported in DXF format and edited or supplemented in common CAD software or integrated with other drawings. This makes it easy to reflect data in electronic deliverables for municipal submissions and construction drawings. Previously, CAD operators had to hand-draft cross-sections based on printed drawings, but direct CAD import of LRTK data eliminates duplicated work.


LRTK Cloud also allows measurement results to be exported as CSV or image formats. For example, you can obtain a CSV list of coordinates and elevations for each point in a cross-section survey for quantity calculations, or take a screenshot of a cross-section to paste into a report as an explanatory figure with a single click. As-built inspection forms that were previously produced manually by comparing field photos and drawings can be automatically aggregated and drawn digitally using LRTK data, greatly reducing documentation time.


Furthermore, with data in the cloud, editing and verification can be performed while sharing the latest information between office and field. Designers can download cross-section data from the cloud to aid design revisions, and construction managers can view the same data on tablets at the site to conduct as-built inspections — enabling real-time collaboration. LRTK is not merely a surveying gadget; it can be said to be a platform that comprehensively supports the subsequent processes from drawing creation through reporting.


Bringing the New Norm of Cross-Section Creation to the Field – Simple Survey Functions and Adoption Benefits

The innovation brought by LRTK is creating a new norm in which “cross-sections are quickly created and checked on-site.” Compare shapes in AR, freely extract sections from point clouds, and immediately verify against designs — this speed and accuracy were unthinkable with traditional methods. LRTK, which dramatically reduces the time and effort required to create cross-sections while enhancing the reliability of results, will become a powerful tool in future on-site operations.


Notably, LRTK also provides a wide range of simple surveying functions beyond cross-section creation. Single-point high-precision positioning, coordinate guidance for stakeout locations, functions to record coordinates and orientation on photos, and remote distance measurement to targets at a distance — tasks that previously required separate equipment and specialist knowledge can be handled simply within one system. These operations are guided in the app, so even non-survey specialists can master them with short training. In practice, many cases show that after introducing LRTK, on-site staff themselves complete surveying and as-built verification, reducing reliance on external surveying contractors.


The ease of adoption is another attractive aspect of LRTK. Because it leverages smartphones, additional investment in dedicated equipment is minimal, and the overall system cost is lower compared to traditional 3D laser scanners. Parts of the solution are offered as a cloud service, allowing you to start with monthly subscriptions without large initial expenses. Since it yields measurement results compliant with the Ministry of Land, Infrastructure, Transport and Tourism’s standards, it can be safely introduced for public works. Above all, the intuitive UI and workflow that anyone on-site can use means you can feel the effects immediately after introduction.


The transformation of cross-section creation and surveying workflows by LRTK can be seen as a “ground-up DX” that aligns with ICT construction and i-Construction promotion. If you are struggling with time lags or accuracy issues related to cross-section creation, or want to promote DX and efficiency at your sites, consider exploring LRTK. Starting from just a smartphone, adopt next-generation surveying technology and bring the new norm of cross-section creation to your field.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.