Must-see for Civil Engineering Construction Managers! Centimeter-Level High-Precision Positioning and On-Site Labor Reduction Achieved with LRTK
By LRTK Team (Lefixea Inc.)
The Wave of Construction Site DX and the Need for High-Precision Positioning
In recent years, the construction industry has been swept by the wave of DX (digital transformation), and the digitalization of on-site operations, called “site DX”, has become a major theme. To address chronic labor shortages, an aging workforce of skilled tradespeople, and the 3K problems of “tough, dangerous, and dirty,” the Ministry of Land, Infrastructure, Transport and Tourism has set a goal to improve construction site productivity by 20% by 2025 and is promoting the use of ICT through *i-Construction*. Against this backdrop, the adoption of the latest technologies for surveying and construction management has become an unavoidable issue for civil engineering construction managers.
In particular, everyday on-site tasks such as surveying (as-built measurement and layout/marking) and as-built management (verification of post-construction shapes and dimensions) have traditionally required significant effort and personnel. Conventional methods typically use total stations and levels, with survey teams of two or more measuring point by point or setting out positions using string lines and chalk marks, making it time- and labor-intensive to cover wide areas. Surveying on steep slopes or along busy roads always carries risk, and manual data organization using paper drawings or Excel creates time lags in information sharing. By introducing DX technologies, these surveying and construction management processes can be dramatically streamlined, improving both safety and quality. This article explains the effects of centimeter-level high-precision positioning and labor reduction enabled by LRTK, a new technology attracting attention as a driver of site DX, with concrete usage scenarios.
What is RTK Technology? Achieving Centimeter-Level Accuracy
Before discussing LRTK, let’s cover the core technology: RTK positioning. RTK (Real-Time Kinematic) is a high-precision positioning technology that corrects GNSS (global navigation satellite system) measurement errors in real time, reducing horizontal position errors to several centimeters and vertical errors to several centimeters as well (several centimeters (several in)). Standalone GPS positioning can have errors on the order of several meters due to satellite signal errors, but RTK achieves dramatically improved accuracy by receiving satellite signals simultaneously at a reference station installed at a known point and at a local rover (mobile unit), and correcting errors from the difference between the two. Traditionally, optical instruments like total stations were essential for tasks requiring centimeter accuracy, such as road layout and positioning of structures. However, with the advent of RTK-GNSS, equivalent accuracy can be achieved using only satellites, and the use of RTK positioning in construction surveying and civil engineering sites is rapidly advancing. With just a GNSS receiver and a mobile data connection, high-precision coordinates can be obtained anywhere, making it attractive for conducting wide-area surveys and as-built measurements with fewer personnel and in less time.
Survey Revolution on Smartphones: What is LRTK?
LRTK is a solution that makes RTK positioning technology easy to use as a trump card for site DX. In short, LRTK is a system that turns a smartphone into an all-purpose surveying instrument capable of centimeter-level positioning. By attaching a compact high-precision GNSS receiver to a smartphone or tablet, you can obtain accurate RTK coordinates and use a dedicated app for surveying, inspections, AR displays, and various other functions. With an LRTK device, surveying, layout/marking, and as-built verification—which previously relied on experienced surveyors—can be performed intuitively by anyone on site.
A major feature of LRTK is its integration with augmented reality (AR). Ordinary smartphone GPS has position errors of several meters, so AR displays of drawing information would be misaligned and impractical for fieldwork. But by leveraging high-precision positioning from RTK, LRTK can project design drawings and 3D models onto the real world seen through the smartphone with precise alignment. For example, design lines on drawings can be AR-displayed on the ground, or virtual stakes and markers can be shown at specified coordinate positions to guide users. LRTK also supports cloud integration, allowing on-site positioning and point cloud data to be uploaded to the cloud for sharing with stakeholders or for analysis and review in a browser. In other words, LRTK is an integrated solution combining high-precision GNSS with smartphones, cloud, and AR, enabling a new generation of “site tools” that allow surveying through construction checks to be completed with a single device per person.
Expected Benefits of Introducing LRTK
Introducing LRTK on site brings the following benefits to civil engineering construction managers:
• Labor reduction and solo work capability: With a smartphone device equipped with a high-precision GNSS receiver, surveying and layout work that traditionally required a two-person team can be handled by one person. If multiple people each carry a device and measure in parallel, substantial personnel reductions and efficiency gains are possible. Even on sites with labor shortages, work can proceed with a minimum crew, and when surveyors are absent, construction managers or craftsmen themselves can perform surveying and checks, reducing reliance on external survey services.
• Significant reduction in work time: Rapid RTK positioning allows coordinate acquisition for a point to be completed in a matter of seconds. There is no need to set up heavy equipment or ensure line-of-sight; when searching for a designated point, simply follow the AR arrow guidance to arrive at the exact position. This dramatically speeds up surveying and layout tasks that previously took half a day. For stake setting, machine operators and survey assistants no longer need constant communication, and reduction of waiting time and simplified procedures lead to overall schedule shortening.
• Improved positioning accuracy and construction quality: Centimeter-level positioning minimizes errors in stake positions and finished elevations. Small discrepancies that previously arose from manual measurements or intuition based on experience can be reliably detected with LRTK. Because the design model and the real-world site can be overlaid and checked in AR, construction mistakes and misunderstandings about layout positions can be prevented in advance. In as-built management, being able to check deviations from design values on the spot prevents rework and quality defects, contributing to higher pass rates for as-built inspections and ensured quality.
• Information sharing and promotion of site DX: LRTK supports data digitization and cloud utilization. Positioning and point cloud data can be uploaded to the cloud immediately from the field, enabling office PCs and tablets to grasp progress in real time. There is no need to record in paper field books and bring data back; reporting and submission can be completed on-site as electronic data. The intuitive information-sharing effects of AR are also significant. Site participants can share the image of the finished product and important points via the smartphone screen, making information that was hard to convey from drawings alone immediately visible. This leads to secondary benefits such as preventing communication loss and speeding up consensus building.
• Improved safety: A major benefit is reducing the need to enter hazardous areas for surveying and as-built verification. For example, reference point surveys along expressways or slope shape checks on steep embankments can be performed by indicating or scanning points in AR from a safe distance, eliminating the need for workers to spend long periods in dangerous locations. This reduces the risk of conducting surveys in areas with poor line-of-sight and shortens exposure time around heights and heavy machinery. As a result, promoting DX also leads to improved safety management.
How On-Site Work Will Change: LRTK Use Scenarios
Now let’s look at how on-site work will concretely change with LRTK introduction in three scenarios: surveying, layout/marking, and as-built management.
Surveying Efficiency: Fast, Wide-Area Measurement by One Person
Traditional surveying with a total station requires at least two people—the operator and an assistant holding the prism—and if obstacles exist between measurement points, you must reposition or set up relay points. In contrast, RTK surveying with LRTK can generally be performed by one person. If the reference station provides correction information via the internet using a VRS (virtual reference station) service, only one receiver is needed and complicated equipment preparation is unnecessary. At the desired point, simply hold the rover device (the smartphone LRTK unit) and tap a button to instantly acquire high-precision coordinates. In practice, RTK surveying can complete measurements in “a few seconds per point”, allowing many points to be measured efficiently in a short time.
In terms of accuracy, RTK-GNSS computes coordinates from the same reference (the satellite system) for all points, so there is no accumulation of error as can occur with a total station that needs frequent repositioning over wide areas. As a result, stable accuracy is maintained even when surveying an entire site at once. For example, with a single LRTK device, a construction manager can perform as-built surveys on small- to medium-scale civil works and add measurements as needed. Measurement records are saved as digital data, making later drawing creation easy. LRTK surveying, which covers wide areas single-handedly while ensuring sufficient accuracy, is becoming the new norm of “anyone, anywhere, in a short time” for on-site surveying.
Innovation in Layout and Piling: Intuitive Positioning with AR
Layout (positioning) and piling in civil engineering are also dramatically transformed by LRTK. In road or foundation work, it is necessary to transfer baseline lines and structural outlines from the drawings to the site, but LRTK devices can AR-display virtual stakes or lines at design points for layout. Workers can view the site through a smartphone and see centerlines or structural edges appear on the ground, eliminating measurement errors and positional misunderstandings. Traditionally, surveyors would mark the site with stakes or chalk for craftsmen to follow. But with AR layout via LRTK, anyone can precisely locate and mark positions on the spot. Specialist waiting times are reduced and workflow becomes smoother.
On large development sites, machine operators can check their current position relative to design lines via AR on a tablet without leaving the cab, allowing consistent cutting and filling at correct positions and slopes. This prevents miscommunication with survey staff and drastically reduces rework. For example, in a road improvement project where LRTK was introduced, the layout phase was halved and machine waiting times were reduced. Even inexperienced workers can intuitively perform correct positioning, enabling reproducible construction that does not rely on skilled personnel. AR-guided piling with LRTK revolutionizes traditional layout work and dramatically improves productivity and accuracy in construction management.
Advanced As-Built Management: Instant Verification of Construction Results with Point Cloud Measurement
As-built management is the essential process of confirming with measurement data that completed structures and formed terrain match the design shapes and dimensions. LRTK dramatically streamlines and advances this as-built verification. Traditionally, after construction, staff would measure many heights or take cross-sections and compare them with design sections in CAD. With LRTK, you can scan the post-construction terrain with a single smartphone to obtain 3D point cloud data, overlay that point cloud with the design model on site, and check differences.
For example, in as-built checks for dams or embankments, simply walking around with an LRTK device and scanning with the camera produces a colorized point cloud that shows excesses and deficiencies at a glance. If you AR-display the design surface’s 3D model on the finished surface, areas that are “overfilled above design” or “overexcavated below design” are color-coded, making it intuitive to identify zones requiring additional correction. Previously, survey data had to be taken back to the office for analysis and, if issues were found, crews had to return to the site for fixes. With LRTK, as-built inspection can be completed on-site in real time. Advanced analyses, such as volume calculation from point clouds, can be done on the LRTK cloud with a single click, enabling instantaneous creation of earthwork quantity reports. Sites that have implemented LRTK report substantial reductions in days required for as-built management and improved accuracy of inspection submission documents.
Thus, LRTK has elevated as-built management to a higher level. Based on high-precision data that comprehensively measures wide areas, reliable quality inspections free from omissions or transcription errors are possible. Measurement results can be shared immediately with clients and internally via the cloud, speeding up inspection and approval processes. For civil engineering construction managers, the once cumbersome as-built management tasks can now be completed quickly, accurately, and with few personnel thanks to LRTK.
Conclusion: The Future of On-Site Work Opened Up by LRTK
LRTK, which fuses RTK centimeter-level positioning with AR technology, brings fresh air to the world of civil construction management. By combining high-precision position information with intuitive digital displays, it dramatically improves productivity and quality in on-site tasks such as surveying, layout, and as-built management, greatly contributing to DX promotion. This is not just applicable to large-scale projects; it is a solution that enables a new way of working where “each person is a surveyor, everyone is a construction manager” even on small- and medium-scale projects and in infrastructure maintenance. LRTK aligns with the Ministry of Land, Infrastructure, Transport and Tourism’s *i-Construction* initiative and is expected to become increasingly widespread on sites.
With technological progress, even lighter GNSS receivers and helmet-mounted AR devices may become widespread in the future, transforming how site work is performed. With improvements in positioning environments through 5G communication and augmentation signals from quasi-zenith satellites like “Michibiki,” real-time cloud processing of massive 3D data to provide immediate feedback becomes increasingly realistic. These future prospects are promising, but first it is important to take a step forward in the immediate site DX.
Simple surveys that previously required time and manpower—such as reference point checks and as-built checks—can be completed astonishingly quickly with just a smartphone using LRTK. By simultaneously achieving labor reduction and improved accuracy, LRTK is a powerful ally for active civil engineering construction managers. Why not experience the benefits on site starting with simple surveys using LRTK?
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.