Challenges Seen from the Civil Construction Management Engineer's "Real Day"

A site supervisor's day starts early in the morning. It is often the case that they go straight to the site early to prepare for the morning meeting or to meet with craftsmen. At the site, while giving safety instructions and confirming arrangements, quality checks such as measuring dimensions and recording photos are indispensable. There are many occasions when they request measurements from an experienced surveying team or take the measurements themselves.


Sometimes they return to the office once in the morning to submit documents or meet with superiors. In the afternoon, if there is another site, they drive there to check the situation, and it is not uncommon to run between multiple sites in a single day.


In the evening, after finally finishing all site tasks and returning to the office, it is time to prepare the daily report and organize documents. They are pressed with organizing photos taken during the day and preparing reports, and as a result tend to get home late every day. Such a hectic day has become the norm, and even if they feel inefficiency from being chased by travel and inspection work, it is often difficult to make improvements.


Days Chased by Travel and Inspections: Where Are the Wasteful Moments Occurring?

One of the most overlooked wastes of time at many sites is travel time. For example, if a site is a 30-minute one-way trip, it takes 1 hour round trip. If this continues five days a week, 20 days a month, that amounts to 20 hours per month, and over a 10-month construction period it adds up to 200 hours per year spent merely on travel. In addition, daily time is spent preparing for going to the site and tidying up after returning home. Changing into uniforms, loading tools, writing daily reports after returning, and cleaning tools, etc., together take about 30 minutes to 1 hour per day as ancillary tasks.


The time spent on these trips and preparations/cleanup is effectively idle "gap time" that does not contribute to productivity. However, under the long-standing assumption that "going to the site is natural," this has not been regarded as a major problem. To advance workstyle reform, it is essential to reassess such unconscious losses.


Moreover, there are also inefficiencies in on-site inspection work. For example, waiting for a specialist surveying team to come for a minor dimension check, or wasting time because you cannot proceed to the next process until a veteran supervisor gives a judgment. Ideally, confirmation and judgment could be made on the spot, but traditionally there were no such means, causing waiting times.


Overcoming the Dilemma of Fewer Personnel and Technology Handover

In recent years, the construction industry has been facing serious issues of labor shortages and aging workforce. The number of civil construction management engineers is also on the decline, and it is not uncommon for one technician to take on multiple sites. As site staffing shrinks, the transfer of skills from veterans to younger workers tends to stall. With experienced technicians retiring, the training of younger staff cannot keep up, raising concerns that long-standing know-how may be lost.


If this dilemma of having to run sites with few personnel continues, it can lead to overwork, mistakes, and increased burdens. One promising solution is improving operational efficiency through the use of digital technology. Promoting DX (digital transformation) and establishing systems that enable efficient site management by a single person are important.


Using digital tools can visualize the parts that previously relied on veterans' intuition and experience and make them accessible to anyone. For example, if surveying and inspections can be easily performed with a smartphone or tablet, even those without special skills can ensure a certain level of quality. Also, if veterans' knowledge is accumulated and shared as data, it can assist in technology handover.


Reducing Rework and Inefficiency in Surveying and Recording

On site, surveying and recording tasks can also hide rework and inefficiencies. For example, when checking the as-built shape after construction, you may not notice errors until a few days after the surveying results come in, leading to rework later. If measurements are forgotten or recording mistakes are made, re-measurement is required later, resulting in duplicated efforts. Numbers jotted in a paper field notebook may be unreadable, or the positional relationships of photos taken may become unclear, rendering the collected data useless.


To reduce such inefficiencies, it is effective to establish a system for immediate on-site checks. If quick measurement and inspection can be performed on site immediately after construction and the results confirmed right away, problems can be detected the same day and rework can be prevented. For example, if height and position are measured immediately after concrete placement and shared via the cloud, supervisors or designers at remote locations can instantly check the as-built condition. Even if there is a deviation, corrective instructions can be given on the spot, eliminating the need for large-scale rework later.


Furthermore, by using digitized surveying and recording tools, omissions and mistakes in records can be dramatically reduced. Data such as coordinates and timestamps are recorded automatically, eliminating the need to transcribe to paper and reducing human error. If data can be saved as electronic files on site and uploaded to the cloud, the risk of data loss is eliminated and the time spent organizing after returning to the office is shortened. As a result, overtime due to waiting for surveying or sorting records is reduced, leading to overall improvement in the construction cycle efficiency.


How High-Precision Positioning and AR Visualization Will Change On-Site Work

Recently introduced high-precision positioning technologies and AR (augmented reality) are poised to greatly change on-site work. RTK, a satellite positioning (GNSS)-based technology, has made it easy to measure positions with errors of a few centimeters. Tasks that previously required expensive specialized equipment and skilled surveyors for centimeter-level measurements can now be performed by anyone with a small device and a smartphone. With high-precision positioning, site personnel can perform the necessary measurements themselves without waiting for the surveying team.


In addition, advances in AR technology make it possible to overlay digital design information onto the real landscape. If you can project structures from drawings or reference heights onto actual terrain through a smartphone or tablet screen, sharing the finished image and checking differences from the design becomes intuitive. For example, you can visualize the route of underground pipes with AR to raise caution during excavation. Displaying a 3D model of the planned structure on site and sharing the intended finished appearance with stakeholders is becoming realistic.


By combining high-precision positioning and AR, new efficiency and reassurance are created in on-site work. Parts that relied on paper drawings or craftsmen’s intuition are supported by data, enabling less-experienced technicians to carry out work accurately. For veterans, digitally confirming their instincts helps prevent mistakes. Because high-precision positioning enables AR displays without displacement, on-site misunderstandings and communication errors are also reduced.


LRTK That Runs Entirely on a Smartphone: Its Mechanism and Feasibility

One solution that enables these cutting-edge technologies to be used on the site with just a smartphone is "LRTK." LRTK is a surveying system composed of a pocket-sized high-performance GNSS receiver that can be attached to a smartphone, a dedicated app, and cloud services. Attach the device to the smartphone, turn on the power, start satellite positioning with the app, and receive correction information via the internet (VRS data for network RTK). This makes it possible to measure the current position with an accuracy of about 1–2 cm (0.4-0.8 in) without preparing dedicated base stations.


LRTK operation is extremely simple; it takes less than 1 minute from arriving at the site to starting positioning. No complicated settings are required, and within several tens of seconds from starting positioning you can obtain high-precision position information (Fix solution) with an error of ± a few centimeters (± a few tenths of an inch). Compared with setting up conventional total stations and surveying, this offers overwhelming speed and ease. The smartphone app is designed so that anyone can intuitively use it with the press of a button.


LRTK was developed by a startup from Tokyo Institute of Technology and achieves positioning performance comparable to high-precision GNSS equipment that used to cost several million yen. In verification comparing it with receivers for first-class bench mark surveying, positioning results at the same point were confirmed to be within a difference of a few millimeters (a few hundredths of an inch). Yet the price is kept within a range that allows one unit per person, truly representing the democratization of high-precision surveying.


After introducing LRTK at sites, there have been reports that "daily operations have changed significantly." The need to arrange for or wait on specialist surveyors has decreased, and because one person can measure and confirm on the spot, work has become smoother. Because even new technicians can easily operate it, it reduces the burden on veterans and improves overall efficiency through one-device-per-person deployment. Some companies have begun issuing LRTK devices to construction management engineers for self-inspection, and this is attracting attention as a first step in on-site DX.


The Usual Hassles of Document Preparation and Reporting Change with the Cloud

One daily headache in site management is the effort required for document preparation and reporting. Organizing photos, creating as-built documents, and preparing reports for clients have taken much desk work time. Even if you work hard on the site, paperwork waiting at the end increases overtime—this is the "usual hassle" for construction management engineers.


LRTK streamlines this area through cloud integration. Measured coordinate data and photos taken are automatically recorded digitally and stored in the cloud, so there is no need to recompile data later. For example, photos are tagged with centimeter-level position coordinates (cm level accuracy (half-inch accuracy)) and orientation information, so you can immediately see "where and in which direction a photo was taken." The hassle of pasting photos onto paper drawings and marking positions disappears, and organizing large numbers of photos can be completed simply by taking them with a smartphone.


Collected surveying data is automatically organized in the cloud and can be one-touch exported as CSV or CAD drawings as needed. Because it can be used directly for quantity calculations and drawing creation, office work is greatly reduced. If you accumulate site progress and as-built data in chronological order, it is also easy to compare long-term changes and analyze trends.


Furthermore, data uploaded to the cloud can be instantly shared with stakeholders. If you issue a password-protected URL and send it to clients or subcontractors, they can check the current situation online without meeting for a meeting or sending documents by mail. Faster information transmission increases the speed of decision-making and enables seamless collaboration between the site and the office.


In this way, by using LRTK, the burden of photo organization and document preparation on site supervisors is greatly reduced. By streamlining the office work that site supervisors have been holding onto, they can allocate more time to safety management and schedule coordination, which they should be focusing on. Such a review of work flows brings effects that directly contribute to workstyle reform.


The Future of Sites: The Destination of Workstyle Reform Supported by LRTK

If such smart construction sites that actively utilize digital tools are realized, the look of sites will change dramatically in the future. Surveying data and photos from the site will be shared in the cloud in real time, allowing supervisors and designers who are remote to instantly check progress and quality. Even with minimal on-site staffing, a system that ensures safety and quality through data-driven remote support should be established. Also, personnel who cannot physically commute to the site due to geography or those who find it difficult to be on site constantly because of childcare or caregiving can participate in projects remotely via data.


For example, it may become commonplace for a construction management engineer to handle surveying, recording, and issuing instructions with a smartphone in hand, with remote superiors or clients viewing the data and making immediate decisions and approvals. Experienced technicians will not need to be physically present on site at all times; they can check key points via data and support younger staff online as needed. If sites can operate without relying on person-dependent experience, it becomes easier to maintain quality even amid labor shortages.


The ultimate goal of workstyle reform is to realize sites where high productivity and safety can be achieved without overburdening a small staff. High-precision site DX supported by LRTK will be a powerful driver toward that goal. These efforts are in line with the Ministry of Land, Infrastructure, Transport and Tourism's proposed direction of "i-Construction" (ICT construction), and DX in the industry as a whole is expected to accelerate further. Sites that are not chased by travel or waiting times, and where decisions can be made quickly backed by data, are not only more efficient but also contribute to the mental ease and work–life balance of workers. Future construction management aided by digital technology will be humane and yet enable resilient site operations.


Starting Site DX by One Person: The Option of Simple Surveying with LRTK

That said, when you hear "site DX" or "workstyle reform," you may brace yourself thinking that large organizational change or major investment is required. Indeed, organization-wide DX involves large plans and investments, but in practice DX started small by a single technician can also produce substantial effects. The prime example is introducing simple surveying using LRTK.


Without special training or large-scale preparation, you can digitize your site work immediately from tomorrow with just a smartphone and an LRTK device. Even just trying LRTK for as-built checks will let you feel the difference in efficiency compared to before. The experience of instantly sharing surveying data and eliminating rework will be a great stimulus to colleagues.


Thus, a small DX started by one person may eventually lead to transformation of the entire site or even the whole company. The attitude of solving on-site problems with technology is the first step toward workstyle reform. Simple surveying with LRTK is an ideal choice for taking that first step. Why not start workstyle reform of the future from the familiar site?


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.