AR navigation changing soil surveys: accurate point measurements anyone can take without getting lost
By LRTK Team (Lefixea Inc.)
Even on large sites with no ground markers, if you point your smartphone camera at the scene, invisible survey points will appear right there—that futuristic sight is becoming a reality in soil survey work. In soil surveys conducted by environmental consultants and construction engineers, it is important to pinpoint survey locations accurately to collect samples and perform measurements. However, in conventional soil surveys, GPS errors or misreading maps have often caused teams to lose points and become confused on site. Fortunately, in recent years two technological innovations—AR (augmented reality) navigation and centimeter-level positioning (inch-level positioning)—are solving this problem. By overlaying digital arrows and markers on the camera view to reliably guide surveyors to the target points, and by using advanced satellite positioning corrections to reduce positioning errors to a few centimeters (a few in), anyone can now measure the intended points with high accuracy without getting lost.
This article explains how AR navigation and high-precision positioning are transforming soil survey sites. We summarize the challenges pointed out in traditional survey work and how the new technologies overcome them, and look at how they are useful in various soil survey scenarios—environmental impact assessments, pre-construction geological surveys, agricultural pH measurements, contaminated soil investigations, slope collapse inspections, and more. At the end of the article, we also touch on the current state in which these advanced technologies are beginning to be integrated into daily operations via simple surveying tools that combine smartphones and small positioning devices.
Challenges faced on soil survey sites
The primary challenge in soil surveys is the difficulty of reaching survey points. It is not easy to find specific locations on large planned development sites, farmland, or forests where there are no landmarks. Even relying on coordinates specified in the survey plan and using maps or handheld GPS, if an error of several meters (several ft) occurs you may overshoot the target location or end up sampling at a slightly offset point. In particular, in contamination surveys and environmental impact assessments, a positional offset of a point is directly linked to the reliability of the data. If a sample is taken at the wrong location, there is a risk that the true extent of contamination or environmental impact cannot be accurately assessed.
Conventional methods also have issues with work efficiency. Time can be wasted going back and forth searching for target points, and the order of visiting multiple survey locations can become inefficient. Walking around with paper maps or a compass thinking “it should be around here…” is by no means efficient. Points that experienced surveyors can quickly locate by intuition can be difficult for less experienced staff, forcing reliance on person-dependent know-how.
Furthermore, the workload involved in recording and organizing data collected on site cannot be ignored. When summarizing the locations of soil samples gathered at each point into a report later, the tedious task of reviewing handwritten notes and photos to confirm coordinates one by one is required. There can be record-keeping errors or missed photos, which can affect the accuracy of the survey results. Soil surveying is both physically demanding outdoor work and desk work that requires precise data management, and the burden is large on both fronts.
AR navigation, centimeter-level positioning, and related digital technologies are set to solve these issues and enable soil surveys that are “without getting lost,” “high-precision,” and “efficient.”
Reach survey points without getting lost using AR navigation
Using AR navigation greatly reduces the risk of losing survey points on site. Digital arrows and flags indicating the specified coordinates are overlaid on the real-world view shown on a smartphone or tablet screen, making the location of points as obvious as if physical markers were in place. For example, even when taking soil samples at multiple points in a forest for an environmental assessment, the device will provide real-time direction guidance toward the preset coordinates, so surveyors can reach their destinations without getting lost even in dense undergrowth.
AR’s visual guidance is intuitive and easy to understand, allowing even inexperienced staff to sensibly identify positions. There is no need to interpret contour lines on topographic maps or to stare at numeric coordinates on a GPS device as before. This is especially advantageous on sites where understanding distance and direction is difficult—such as steep planned development land or vast farmland—since you simply walk in the direction the on-screen arrows indicate.
Moreover, AR navigation enables planned巡回 of multiple points. Select the next coordinate to visit and the direction is immediately shown, allowing surveyors to efficiently move between dispersed survey points. If the survey leader specifies the order in advance, each team member on site only needs to follow the AR guidance in sequence. This secures efficient team movement and contributes to shorter on-site survey times.
Measurement accuracy improved by centimeter-level positioning
For AR navigation to perform precisely, digital markers need to be aligned with the correct real-world positions. The GPS built into conventional smartphones typically has errors on the order of several meters (several ft), so AR-displayed markers could be offset from the actual points. This is where RTK-GNSS-based centimeter-level positioning technology has recently attracted attention.
RTK (Real-Time Kinematic) positioning reduces errors to a few centimeters (a few in) by using real-time correction information in addition to satellite positioning signals. Specifically, high-precision positioning augmentation data is received from networks such as the Geospatial Information Authority of Japan’s reference station network or satellite systems (for example, the CLAS signal provided by Japan’s quasi-zenith satellite Michibiki), and a small GNSS receiver attached to the smartphone applies corrections. As a result, the positioning error that used to be about 5~10 m (16.4-32.8 ft) can be improved to the order of a few centimeters (a few in), enabling current position awareness with survey-grade precision comparable to professional surveying instruments.
The benefits of centimeter-level positioning dramatically increase the data accuracy in soil surveys. For instance, when investigating the spread of contaminated soil, if sampling locations are off by several meters (several ft), large errors will appear in contamination distribution maps. But if positions can be pinpointed to the centimeter-level (inch-level), the extent of contamination can be accurately determined. Similarly, when mapping pH distribution in farmland, accurately locating each sample allows highly reliable analysis when mapping data in a GIS later.
Previously, such high-precision positioning required expensive surveying instruments and antennas, but today it can be achieved with the simple setup of a smartphone + small GNSS receiver. Just attach a device weighing a few hundred grams to your phone, and there is no need to set up a tripod and a surveying instrument. For soil surveys that move frequently between sites, this method is ideal because it provides high precision without sacrificing mobility.
Visualize current conditions with 3D scanning
In addition to AR navigation and high-precision positioning, 3D scanning technology is also proving powerful on soil survey sites. The latest smartphones and tablets are equipped with LiDAR sensors, which can be used to quickly scan surrounding terrain and structures and acquire point cloud data. When combined with centimeter-level positioning, the acquired point cloud can be given accurate coordinate information, allowing the current terrain to be recorded as a digital three-dimensional model.
For example, when investigating the amount of soil loss at a steep slope collapse site, what used to be measured manually with tapes and staffs can now be scanned to obtain a detailed terrain model in a short time, making volume calculations of the collapsed area easy. Scan data can be shared instantly to PCs and tablets via the cloud, so office staff can grasp the on-site three-dimensional situation without being there. Scanning the existing terrain of a planned construction site also allows later overlaying with planned design surfaces to verify pre- and post-development terrain changes.
In soil surveying, scanning exposed stratigraphic faces in trenching investigations or borehole exposures and recording them aids detailed geological analysis back at the office. Surface irregularities and textures that are hard to convey in photographs can be treated quantitatively with 3D point cloud data. If you scan an entire survey area, you retain data not only for specific spots but also for the surrounding terrain, which can yield unexpected insights.
Thus, 3D scanning for capturing current conditions increases the accuracy of survey records and strongly supports post-survey analysis work.
Labor savings through automatic saving of photo records and observation logs
Introducing technologies such as AR navigation, high-precision positioning, and 3D scanning also greatly streamlines on-site record-keeping. With a dedicated application, positioning data, photos, and notes can be automatically linked and saved for each survey point. For example, when you take a photo with your smartphone while collecting a soil sample at a point, that photo is automatically tagged with the capture location’s coordinates, orientation, and timestamp. Surveyors no longer need to leave handwritten notes like “Point XX, lat/long…”—a single button press accumulates accurate observation logs in the cloud.
With cloud integration, data recorded in the field can be checked immediately from office PCs. Even when teams divide multiple areas among members, progress and collected data from each member can be monitored in real time. Information sharing such as “which points have been sampled” and “where to go next” becomes smooth, strengthening coordination between the field and the office. Eliminating the need to bring paper notebooks back to manually transcribe into spreadsheets removes wasted effort and reduces post-survey administrative time.
Moreover, digitally saved observation logs are directly applicable to reporting and analysis. Photos and measurements with attached location data can be displayed on maps within specialized tools and output as PDF reports when needed. This allows compilation of survey results with one click, freeing experts to focus on review and additional analyses. A seamless workflow from field records to report generation contributes to shortening the overall lead time of soil surveys.
Field work anyone can do and team standardization
While advanced technologies might sound like they require specialized knowledge, the new soil survey style using AR navigation and centimeter-level positioning aims to enable field work that anyone can do. The system is designed so that you simply follow the guidance displayed on a smartphone screen, allowing young or new staff to use it intuitively. Tasks that previously depended on veteran intuition—like roughly locating a point—are now as simple as standing where the device indicates, enabling newcomers to achieve the same accuracy.
This also standardizes work quality within teams. By compensating for differences in survey experience with technology, anyone can produce results at a consistent level. Moving away from person-dependent know-how and enabling highly reproducible surveys will likely improve organizational credibility. Also, if one smartphone positioning tool per person becomes the norm, many measurements that used to be carried out by two-person teams can be completed by individuals, increasing efficiency on sites where labor shortages are an issue.
In terms of training, visual support from AR and feedback from automatic logs accelerate learning. When a newcomer performs a point measurement for the first time, instead of a senior standing next to them to teach map reading, they can learn in the field by looking at the smartphone screen. Since results are immediately saved to the cloud, a supervisor in the office can check the newcomer’s work that same day and provide appropriate advice. Sharing data across the team while improving field skills makes introducing these technologies a way to strengthen organizational capability.
Main use cases for soil surveys
The technological foundations discussed so far—AR navigation, high-precision positioning, and 3D scanning—are being applied in various soil survey use cases. Here are some representative scenarios.
• Environmental impact assessment: For environmental assessments related to factory construction or development plans, soil, water quality, and ecosystem impacts around the planned site are investigated in advance. By using AR navigation to reliably reach pre-set soil sampling points and obtaining high-precision location information with centimeter-level positioning (inch-level positioning), the reliability of survey data is enhanced. Survey results can be shared instantly via the cloud, allowing environmental analysts to monitor the situation in real time and issue instructions for additional surveys if necessary.
• Geological and soil surveys before construction/land development: Before building structures or infrastructure, borehole investigations and soil tests are conducted to understand ground strength and soil properties. When surveying multiple points across a large site, AR navigation provides smooth guidance to each borehole location. High-precision positioning records the exact location and elevation of each test hole, aiding later ground analysis and foundation design. Survey points that once required driven markers can be replaced by AR displays, eliminating the need to leave extra markings on site.
• Soil pH surveys in agricultural land: In agricultural soil analysis, samples are collected from multiple points in a field to measure pH and nutrient concentrations. AR navigation makes it easy to visit sampling points at uniform grid intervals even in large fields, preventing missed samples or positional bias. Recording positions to the centimeter-level (inch-level) enables creation of precise soil maps that visualize fine pH variations within fields. Accumulated data is managed in the cloud and can be continuously used to plan fertilization and verify the effects of soil improvement.
• Confirming distribution of contaminated soil: When contamination by hazardous substances is suspected at sites such as former factories, it is necessary to investigate the extent and concentration. High-precision positioning and AR navigation allow comprehensive surveys that cover grid-pattern sampling points without omission. Because positional errors are small, the boundary between “contaminated” and “not contaminated” can be captured precisely, enabling accurate identification of areas requiring remediation. Survey results plotted on cloud-based maps can be shared with stakeholders, facilitating assessment of contamination and smooth communication with residents.
• Inspection of collapse points on rivers, roads, and slopes: After heavy rains or earthquakes, inspections are carried out to check for collapse or deformation on river embankments, roadside slopes, and other areas. Even for wide-ranging patrol inspections, AR navigation prevents missing specified checkpoints. Especially when inspecting slopes adjacent to forests where spatial awareness is difficult, AR guides inspectors reliably to checkpoints. Where collapse is found, 3D scanning can record shapes for use in later restoration planning. If photos of damage are taken with positioning and camera functionality, they can later be checked on the point cloud with capture locations, making them extremely useful as deformation records.
Conclusion
Digital technologies such as AR navigation for coordinate guidance, centimeter-level positioning, 3D scanning, and cloud integration are beginning to bring definite changes to soil survey sites. The emergence of simple surveying tools that combine these technologies is making advanced surveys possible even without expensive equipment or specialist skills. A representative example is LRTK (smartphone-mounted RTK-GNSS receiver), an innovative solution that transforms a single smartphone into a surveying device capable of centimeter-level positioning and AR display. By adopting simple surveying with LRTK, everyone from environmental consultants to construction site technicians can easily use advanced functions in their daily work—acquiring high-precision location information, intuitive on-site guidance via AR, 3D scanning, and cloud data sharing.
Even field-centric work like soil surveying is steadily being swept by digital transformation (DX). Tasks that required manpower and time are becoming more efficient, and as data accuracy and reproducibility dramatically improve, the reliability of environmental surveys and construction planning will increase. Once AR navigation and high-precision positioning make “accurate point measurements without getting lost” the norm, soil surveying will surely evolve into even faster and more precise practice. In the near future, anyone with a smartphone may be able to diagnose soil with surveyor-level accuracy and make data-driven decisions—such a time is just around the corner.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.


