• Why safety measures are the top priority in drone surveying

• Rule 1 Finalize flight conditions and applicable laws and regulations the day before

• Rule 2 Do not allow third parties into the flight area

• Rule 3 Do not leave weather and cancellation criteria ambiguous

• Rule 4: Do not skip the pre-flight check

• Rule 5 Decide the takeoff and landing zone and the emergency evacuation site in advance

• Rule 6 Separate the roles of the pilot and the assistant

• Rule 7 During flight, continuously monitor changes in the air and on the ground

• Rule 8: Thoroughly carry out initial response and documentation in the event of an accident

• Approach to embedding safety measures at the worksite

• Summary


Drone surveying is a highly effective method for quickly understanding large areas and producing outputs such as photos and point clouds. However, precisely because it has high value on site, safety measures must not be taken lightly. Surveying is not complete simply when data are captured; it is only regarded as a professional operation once it is finished without posing any danger to workers, passersby, nearby residents, surrounding structures, vehicles, or other aircraft.


Especially in drone surveying, risks that are hard to see on paper tend to overlap, such as low-altitude takeoffs and landings, site-specific traffic flows, the coming and going of work vehicles, temporary structures, overhead lines, strong winds, and radio wave environments. The Ministry of Land, Infrastructure, Transport and Tourism also requires safe flights that do not cause inconvenience to third parties, in addition to rules on no-fly zones and flight methods, and it requires compliance with relevant laws and municipal ordinances. In addition, unmanned aircraft with a weight of 100 g or more must be registered in advance before flight.


Furthermore, for specific flights, prior notification of the flight plan and the creation of a flight log are required by regulation, so it is necessary to consider safe operation as encompassing not only the flight itself but also the management before and after the flight. Safety measures are not something to be remembered only after arriving on site; they must be consistently structured as a flow of planning, preparation, execution, and recording.


In this article, we organize and explain, in eight rules, the safety measures that field personnel conducting drone surveying should really follow. These are not mere generalities; they are presented in a form that is easy to incorporate into surveying operations, so the content will be useful both to those who will be managing subcontractors and to those moving toward in-house operations.


Why Safety Measures Are the Top Priority in Drone Surveying

The importance of safety measures in drone surveying is not simply because it would be dangerous if the aircraft fell. Around airports, in emergency-use airspace, in airspace at 150 m (492.1 ft) or higher above the ground or water surface, and over densely populated areas, permissions may be required or flights may be prohibited altogether. In particular, emergency-use airspace cannot be flown in regardless of whether other permissions have been granted, so operations that proceed based solely on on-site judgment are extremely dangerous.


Also, the Ministry of Land, Infrastructure, Transport and Tourism's safety guidelines state not to fly over third parties, to avoid the airspace above places with heavy pedestrian traffic—such as schools, hospitals, and tourist facilities where many unspecified people tend to gather—to refrain from flying over or near highways and railways, and to keep a sufficient distance from high-voltage power lines, substations, and radio facilities. In other words, drone surveying safety measures are, before piloting skill, a responsibility to correctly judge where to fly, near whom to fly, and what to avoid.


Even more important is the responsibility after an accident. If an accident or a serious incident occurs, you must immediately suspend the flight, provide aid to the injured, and report to the Minister of Land, Infrastructure, Transport and Tourism. Putting safety measures in place beforehand is not only to prevent accidents, but also to prevent the escalation of damage in the unlikely event and to ensure accountability.


Rule 1: Confirm flight conditions and regulations the day before

The first rule is to confirm whether flying is possible by the day before. Operations that wait until arriving on site and then look at the sky to decide leave safety measures lagging. In drone surveying, in addition to airspace conditions such as areas around airports, emergency-use airspace, altitudes above 150 m (492.1 ft), and airspace over densely populated areas, procedural requirements also vary by method, such as night flights, beyond-visual-line-of-sight flights, and flights that cannot ensure distance from people or property. Furthermore, besides the Aviation Law, it is necessary to confirm municipal ordinances, instructions from land managers, rules for using rivers and parks, and privacy considerations during filming.


If you finish these checks by the day before, you'll reduce the time spent hesitating on the day about whether you can fly. In practice, it's effective to compile the flight location coordinates, takeoff and landing points, maximum altitude, flight route, access control area, operating time window, nearby hazardous materials, and emergency contacts onto a single sheet and share it with relevant parties. Safety measures should not be known only to the person flying; it's important to ensure that the site manager, ground marshals, assistants, and the client representative all share the same understanding.


In particular at survey sites, changes such as "I thought there would be few work vehicles today, but another crew came in," "foot traffic increased because of a nearby event," or "an aerial work platform was suddenly brought in" are not uncommon. If you organize the regulations and site conditions the day before and set up a system to check only the differences on the day, safety judgments are less likely to waver.


Rule 2 Do not allow third parties into the flight area

The second rule is to prevent third parties from entering the flight area. When thinking about safety measures, attention tends to focus on aircraft performance, but what greatly affects actual accident risk is people entering the area. The Ministry of Land, Infrastructure, Transport and Tourism guidelines indicate that flights should not be conducted over third parties and that care should be taken to maintain distance from people and property, and they clearly set out the idea of implementing access-control measures. Current flight manuals also require that, for flights over densely populated areas or flights that cannot maintain distance from people or property, operators monitor to ensure third parties do not enter beneath the flight path and take the safety measure of aborting the flight if there is any approach or intrusion.


A common mistake at surveying sites is focusing only on the flight path and neglecting ground traffic flow. In situations such as temporary walkways near takeoff and landing points, material delivery vehicles passing at regular intervals, or overlaps with local residents’ walking routes, the site as a whole can be dangerous even if the flight itself is stable. As basic safety measures, clearly define the perimeter of the flight area, restrict access to non‑authorized personnel, post warnings as needed, and establish a system that can immediately suspend operations if a third party’s approach is detected.


The important point of this rule is to think of it not as “avoid third parties if possible” but as “operate so that they are not allowed in.” Surveying is the work of systematically photographing a defined area, so you can greatly reduce risk by delimiting the flight area in advance and conducting operations during time slots when entry and exit can be easily controlled. Flying while pedestrians or workers from other trades can come and go freely is not a safety measure; it’s leaving things to chance.


Rule 3 Do not be vague about weather and cancellation criteria

The third rule is to avoid ambiguity about weather and cancellation criteria. The Ministry of Land, Infrastructure, Transport and Tourism's guidelines also require confirming before flight whether the weather conditions permit safe operation, and explicitly state that unmanned aircraft are susceptible to wind. The guidelines further assume that sudden gusts can make control difficult, and recommend that operators continually work to maintain their skills.


In practice, vague judgments such as "There's a bit of wind but it should be fine" or "It looks like it'll recover by the afternoon, so we'll just prepare for now" are the most dangerous. As a safety measure, cancellation criteria should be decided in advance, covering average wind speed, sudden gusts, rainfall, visibility, temperature, solar radiation, ground surface muddiness, and the likelihood of dust being raised at takeoff and landing points. If the criteria are set, it becomes easier for the site supervisor and the pilot to share the same understanding.


In drone surveying, weather cannot be ignored from the perspective of image quality. If strong winds disturb the aircraft's attitude, they can affect photo overlap and cause blur, potentially requiring re-flights. Deciding not to take risks for the sake of safety directly contributes to consistent quality of results. Safety measures and quality measures are not separate; they should be seen as extensions of the same judgment.


Also, on-site weather cannot be interpreted from broad-area forecasts alone. In cut-and-fill terrain, slope faces, gaps between buildings, along rivers, along the coast, and in mountainous areas, localized wind updrafts and downdrafts are more likely to occur. Walking the survey area to see where the wind changes and where takeoff and landing would be hazardous is also a proper safety measure.


Rule 4 Do not skip pre-flight checks

The fourth rule is to never omit the pre-flight checks. The Ministry of Land, Infrastructure, Transport and Tourism sets out the following as basic flight practices, regardless of the flight location: not flying under the influence of alcohol or drugs; performing pre-flight checks; preventing collisions with aircraft and other unmanned aircraft; and not flying in ways that cause inconvenience to others.


There are many points to check in pre-flight inspections, but on site it is less likely to miss anything if you broadly organize them into four categories: airframe, power, communications, and settings. For the airframe, check for external damage, looseness of fastenings, the condition of rotating parts, sensor contamination, and the secure attachment of any payloads. For power, check the remaining charge of the main and backup power sources, degradation, charging history, and the effects of ambient temperature. For communications, check the status of the control and video systems, the presence of radio interference, and the return/recovery behavior in abnormal situations. For settings, confirming return altitude, flight restrictions, survey route, emergency procedures, and recording settings is essential. The Ministry of Land, Infrastructure, Transport and Tourism’s guidelines also require confirming whether the aircraft has any damage or malfunctions, the condition of batteries or fuel, and that nothing will impede the flight.


What’s important here is not to leave checks only in your head. Keep checklist items on paper or digitally, and record who checked what, because doing so reduces oversights. The more accustomed you become, the more you’ll be tempted to skip pre-flight checks, but accidents usually start with omissions made when you’re familiar with the routine. Turning safety measures into a system also means not doing checks based on your mood.


Rule 5 Decide landing and takeoff zones and emergency diversion sites in advance

The fifth rule is to decide the takeoff and landing area and an emergency landing site in advance. The Ministry of Land, Infrastructure, Transport and Tourism's guidelines recommend ensuring sufficient space free of obstacles around the flight area and keeping a margin beyond the legally required distance from people and property. They also state that flights should not be conducted over or near highways and railways, nor over places with heavy third-party traffic such as schools, hospitals, and other locations where large numbers of unspecified people gather.


Applied to surveying practice, this approach means that, rather than deciding the flight route first, you should first determine where you can safely take off and land. This is because accidents are more likely to occur during takeoff and landing than in flight, and at those times the aircraft is closer to people. The takeoff and landing area should be flat, have few obstacles, produce little dust or flying debris, and be separable from third‑party routes. If possible, in addition to the usual takeoff and landing area, identify backup landing candidate sites to be used if the wind direction changes or in the event of communication failures, as this will further enhance safety.


When selecting an emergency landing site, it is important not only to decide where you can land the aircraft but also to determine where you must not land it. For example, vehicle traffic lanes, temporarily stored materials, areas near scaffolding, directly under overhead lines, puddles, muddy ground, and places where people are waiting are locations that should be avoided especially in emergencies. The quality of safety measures is determined more by how you handle escape in abnormal situations than by your normal flight planning.


Rule 6: Separate the roles of the operator and the assistant

The sixth rule is to separate the roles of the pilot and the assistant. The Ministry of Land, Infrastructure, Transport and Tourism's guidelines also state that having an assistant monitor the surroundings while flying is effective for ensuring safety, and they recommend that the pilot and assistant wear clothing that makes it clear to bystanders that they are involved in the operation.


In drone surveying, if the pilot is tasked with simultaneously monitoring the screen, checking the flight route, confirming ground safety, and responding to stakeholders, blind spots will inevitably arise. Especially on flights intended for orthomosaic images or point clouds, attention tends to focus on flying the planned route, and responses to movements on the ground can be delayed. That is why it is important to have an assistant monitor both the air and the ground and to have a system that can immediately share with the pilot any third‑party approach, vehicle entry, manned aircraft approach, changes in wind, or signs of communication abnormalities.


Assigning roles is insufficient if it only amounts to "please watch." Assistants need to know what to watch, where to stand, and what words to use to call a stop in case of an anomaly. The operator should concentrate on flying, and the assistant should focus on monitoring the surroundings and calling attention to hazards. The more a site achieves this separation, the more calmly and safely it can operate. Safety measures are not about increasing the number of people, but about clarifying roles.


Rule 7: Continue to monitor changes in the sky and on the ground during flight

The seventh rule is to continuously monitor changes in the sky and on the ground during flight. Even if you perform safety checks before flying, conditions can change while airborne. The Ministry of Land, Infrastructure, Transport and Tourism's guidelines state that if a manned aircraft is observed, do not fly; if another unmanned aircraft is observed, maintain a safe distance and, if there is a risk of collision, land the aircraft. They also warn that near high-voltage lines, substations, radio facilities, or in locations where many radio communication devices are used simultaneously, there is a risk of losing control due to radio interference, so you should keep a sufficient distance.


At a surveying site, you can't just watch the sky. On the ground, workers move, materials are delivered, nearby vehicles pass, crane operations begin, and temporary facilities are relocated. In the air, manned aircraft may approach, other unmanned aircraft may arrive, and wind direction can change. What is required for safety measures is not to keep confirming during flight whether things are "proceeding as planned," but to keep watching whether the situation allows you to "continue with the plan." If conditions change, you must decide to pause operations immediately without hesitation.


Also, under the national flight plan notification system, you can enter your planned flight and view the planned flights of other unmanned aircraft, and by registering a flight plan you can check information such as nearby aircraft, manned aircraft flying at low altitude, and locations where municipalities prohibit flights. In modern operations, it is important not to rely solely on visual observation at the scene for safety measures, but to combine it with prior information checks.


Rule 8: Ensure Thorough Initial Response and Record-Keeping in the Event of an Accident

The eighth rule is to ensure a thorough initial response and record-keeping in the event of an accident. Under the Ministry of Land, Infrastructure, Transport and Tourism’s regulations, if an accident or serious incident occurs you must immediately stop the flight, provide aid to the injured, and report details such as the date, time, and location of the occurrence. Safety measures are intended to eliminate accidents, but in practice it is just as important to prepare for possible emergencies.


Much of the confusion at an accident scene comes from not having decided what to prioritize. If the order—protecting human life, preventing secondary disasters, securing the aircraft, notifying relevant parties, and preserving records—is decided in advance, the actual response will be faster.


For example, organizing roles in advance—such as whether to approach the aircraft immediately after a crash or keep a distance if there is a risk of fire, who will contact the scene commander, and who will cordon off the surrounding area—makes it easier to prevent further damage.


From a records perspective, routine inspections and flight records are also important. The Ministry of Land, Infrastructure, Transport and Tourism requires entries in a flight logbook for specified flights, and its guidelines indicate that, in addition to daily inspections, there should be periodic maintenance checks, records of flight, inspection, and maintenance status, maintenance of skills, recommending obtaining insurance, and preparing fire extinguishers appropriate to the types of fuel or batteries. Sites where causes can be traced after an accident are more robust; conversely, sites without records find it difficult to prevent recurrence or to provide explanations.


Approach to Establishing Safety Measures at the Worksite

We've gone through eight rules so far, but what really matters is not letting them end as one-off reminders. If safety measures for drone surveying rely solely on a person's experience and intuition, they will collapse the moment responsibilities change. Only by standardizing what must be done at each site and ensuring that anyone can check to the same standard will operational quality stabilize.


For example, simply standardizing the routine each time — pre-checks, on-site reconnaissance, sharing at the morning briefing, pre-flight confirmation, in-flight monitoring, post-flight records, and debriefing — can be effective. Document cancellation criteria, decide how to respond when a third party approaches, diagram the positions for assistants, and record any near-misses after flights. These small, cumulative steps create a worksite that is less likely to have accidents.


Also, in surveying operations there is a tendency to prioritize "fly quickly and return quickly," but the more rushed the site, the more likely checks are to be skipped. To establish safety measures, reducing hesitation in decision-making should be prioritized over shortening flight time. When confirmation procedures are in place, unnecessary rework is reduced, and as a result the overall efficiency of the work improves.


Drone surveying can be an extremely powerful tool when used well. However, in the field, the teams that earn trust are not the ones that fly spectacularly, but the ones that refrain from flying on dangerous days. Thoroughly implementing safety measures should be regarded not as a defensive stance but as a proactive foundation for sustained operations.


Summary

Safety measures for drone surveying are not determined solely by flight skills. Pre-flight confirmation of flight conditions, management of third-party access, weather assessment, pre-flight inspections, design of takeoff and landing zones, division of roles between pilot and assistants, continuous monitoring during flight, and initial response and record-keeping in the event of an accident—all must be connected for operations to be safe.


If I had to sum up the eight on-site rules in one phrase: put systems in place that prevent taking undue risks. Don’t debate on site whether you can fly. Stop if people enter the area. Don’t fly if you can’t read the wind. Land if any abnormality occurs. Keep records and use them to improve next time. Simply by thoroughly enforcing these basics, the accident risk in drone surveying can be greatly reduced.


To improve the safety of surveying, it is important not only to ensure the flight itself but also to be able to accurately share on-site the takeoff and landing positions, reference points, controlled-access areas, and verification positions. If you want to carry out on-site position management and simple surveying more reliably, using a smartphone-mounted GNSS high-precision positioning device like LRTK can make it easier to improve the accuracy of positioning and safety checks before and after drone surveys. When aiming for safe, reproducible field operations, it is also useful to maintain the perspective of putting the measurement system itself in order.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page