Is drone surveying possible even on steep slopes?

Drone surveying is possible even on steep slopes. Rather, for slope faces and embankments that are difficult for people to access on foot, locations at risk of collapse, and terrain where securing footholds is challenging, it is an effective means to gain a broad overview from the air. In practical fieldwork as well, there are many situations where drone surveying is used on steep slopes, such as inspecting slopes on developed sites, understanding topography in mountainous areas, assessing conditions after disasters, estimating soil volumes on slopes, and recording the current condition of assets for maintenance.


However, you cannot expect success by flying with the same mindset as on a flat site. On steep slopes, the large differences in elevation themselves affect both flight planning and measurement accuracy. In addition, wind flows tend to become more complex, and satellite positioning conditions, the communications environment, workers' positions, and the difficulty of ensuring safety also compound the situation. Therefore, drone surveying on steep slopes should be viewed not as a question of whether it can or cannot be done, but as a task of determining under which conditions it can be carried out safely and with the required accuracy.


Many search users want to know whether measurements can really be taken on steep slopes, where failures are most likely to occur, and what preparations will prevent a loss of accuracy. In practice, many of the problems that occur on steep terrain stem less from the aircraft’s performance itself than from overlooking site conditions or from insufficiently detailed flight planning. In other words, if you prepare in advance, it is quite possible to achieve satisfactory results even on steep slopes.


In this article, we organize and explain six key points to keep in mind when conducting drone surveying on steep slopes. We also clearly summarize, from the perspective of on-site personnel, what types of tasks it is suited for and what to focus on to stabilize accuracy. If you want to decide whether to introduce this at a steep-sloped site, determine whether you can operate it in-house rather than outsource, or if you have already introduced it but have concerns about accuracy or safety, please read through to the end.


Reasons Why Surveying Steep Slopes Becomes Difficult

The main reason drone surveying becomes difficult on steep slopes is that terrain undulations greatly change the shooting conditions. On flat ground, flying at a constant altitude makes it relatively easy to keep the distance to the surface uniform, which helps suppress variations in image scale and ground pixel size. However, on steep slopes, even at the same flight altitude, the distance to the ground can differ greatly between the upper and lower parts of the slope. This makes images differ in appearance and perceived resolution, which can cause inconsistencies when generating point clouds and orthomosaic images.


Another difficulty is that, depending on a slope’s orientation, there is a clear distinction between faces that are easy to capture and those that are hard to capture. Relying only on imaging from directly overhead may fail to adequately capture the slope surface. In particular, cut or fill slope faces, slopes facing deep valleys, and areas shaded by trees or structures are prone to missing the necessary information. As a result, 3D reconstructions can have gaps, or the geometry needed for cross‑section checks can become poorly defined.


Furthermore, on steep slopes the effects of wind become harder to read. Around ridgelines, valleys, slope crests and slope toes, conditions that look calm on the ground can still produce localized updrafts and downdrafts aloft. If the aircraft’s attitude is disturbed, it can cause blurred photos and insufficient overlap, directly impacting not only survey quality but also safety. Being able to “fly” at a steep-site and being able to fly it stably are two different matters.


In terms of work arrangements, steeply sloped terrain also presents unique difficulties. Places where pilots and assistants can stand safely are limited, and securing takeoff and landing sites is not easy. When you take into account positions from which the aircraft can be kept in sight, distances to surrounding obstacles, and evacuation routes in case of emergency, there are many cases where you cannot freely choose locations on site. If flight routes are determined solely by surveying objectives, safety issues are likely to arise.


Also, the accuracy required varies depending on the intended use of the deliverables. While general overview or record-keeping purposes may be feasible, tasks such as earthwork volume calculation, as-built verification, design comparison, and deformation monitoring place higher demands on positional accuracy and geometric fidelity. On steep slopes, you must clarify "what the survey is for" in advance even more than on flat ground, otherwise you cannot determine the necessary preparations and the flight plan. If you conduct a flight with that left ambiguous, the flight itself may succeed, but the resulting deliverables often turn out to be unusable for the intended purpose.


In other words, drone surveying on steep slopes is not essentially about flying the aircraft and collecting images. The essence is to organize five factors simultaneously—elevation difference, slope orientation, wind, safety, and the intended use of the results—and reconfigure the method to suit the site. From the next chapter, we will examine six practical points to watch for.


6 Points to Watch Out for in Drone Surveying

When operating over steep slopes, the first thing to pay attention to is how you determine flight altitude. If you fly at a uniform altitude as you would over flat ground, the distance to the surface can differ greatly between the upper and lower parts of the slope. The larger the distance difference, the more likely you are to encounter variations in imaging resolution and uneven overlap between images. As a result, the density of the 3D model can become biased and some surfaces may be poorly reproduced. On steep terrain, it is important to adopt an approach that follows the terrain rather than simple constant-altitude flight. At a minimum, confirm in advance over what range the distance to the surface changes significantly, and design the mission accordingly—by splitting flight blocks, changing flight direction, or adjusting conditions for each slope as needed.


The second point to note is not to limit the shooting direction to straight overhead. On steep slopes, vertical shots from above alone may not capture the slope’s features adequately. In particular, when the embankment’s gradient is steep, a top-down viewpoint thins out surface information and makes it difficult to capture the shapes needed for creating cross-sections or checking for deformations. Therefore, it is essential to combine oblique-angle shots as necessary and adopt the idea of showing the slope’s plane itself. What matters here is not increasing the number of shots per se, but considering from which angles the desired shape should be shown. A steep slope is not a plane but a three-dimensional object. To capture a three-dimensional object correctly, you must shoot it in a way that makes it appear three-dimensional.


Third, do not judge the wind solely by how it feels on the ground. On steep slopes, local variations such as wind blowing up from valleys, disturbed wind at ridgelines, and winds accelerating along the terrain are likely to occur. Wind that would be acceptable on flat ground can cause the aircraft to be blown off course along a slope or require increased attitude control, reducing image quality. In surveying in particular, what matters is not whether you could fly, but whether you could fly stably and according to plan. If you observe any irregular behavior, do not force continuation; consider changing the flight route or revising the time of day. On steep slopes, choosing times when the wind is weak is itself part of quality control.


The fourth is securing the takeoff and landing area and the operator’s position. On steep slopes, attention tends to focus only on the flight envelope, but in reality whether there is a place to safely raise and lower the aircraft is extremely important. If there are surrounding vegetation, power lines, fences, or steps at the slope shoulder, the risks during takeoff and landing increase. Also, in locations where the operator is forced to stand in an awkward posture, both visibility and controllability deteriorate. Accidents on steep slopes often occur not during cruising flight but because of judgment errors immediately after takeoff or just before landing. It is necessary to plan in advance the aircraft’s approach direction, the emergency abort position, and the standby positions for assistants.


Fifth is the approach to calibration and validation. The steeper the slope, the more important it is not to overconfidently trust positioning results. Outputs created from aerial photographs are affected by shooting conditions, terrain, and how the ground surface appears. Especially at sites with large elevation differences, you should be clear about where on the slope you want to ensure accuracy, and have the necessary validation points and verification methods in place. Even if checks on flat ground show no problems, deviations can be much larger on slopes. On steep slopes, don’t be reassured by overall average figures alone; you need to check locations with elevation differences such as the slope crest, slope toe, and mid-slope. If the deliverable will be used for earthwork volume calculations or design comparisons, it is even more important to adopt a perspective that does not overlook local deviations.


The sixth is the influence of vegetation and occlusions. Steep slopes often contain a mix of forest edges, slope protection works, retaining walls, and temporary structures, making conditions where the ground surface is hard to see. In photo-based surveying, it can be difficult to accurately capture the ground surface shape in areas covered by grass or low shrubs. Furthermore, strong shadows caused by lighting conditions can reduce the stability of image processing. Therefore, before entering the site it is necessary to clarify "what you want to treat as the ground surface" and "which areas are likely to be unseen." On steep slopes, if you only notice missing data after flying, the rework becomes substantial. Planning that assumes vegetation and occlusions and allows room for supplementary methods or additional measurements is important.


These six items may each appear to be independent points to watch, but in reality they are strongly interconnected. For example, if the flight-altitude design is insufficient, you'll need to devise camera shooting directions, and increasing the number of shooting directions makes flight time and the effects of wind problematic. If there are constraints on takeoff and landing locations, the flight route must also be reconsidered. When conducting drone surveys on steep slopes, it is more effective to first gather and organize the overall site conditions than to simply add individual countermeasures.


Approach to Stabilizing Accuracy on Steep Slopes

To stabilize accuracy on steep slopes, you first need to work backwards from the deliverable. The required quality changes depending on whether the goal is capturing current conditions, estimating earthwork quantities, checking cross-sections, or comparing differences with the design. If you proceed vaguely with "for now, capture at high density" or "for now, increase the number of images," you only increase the workload and blur essential quality control. On steep slopes, the basic approach is to first define how much accuracy is needed for the purpose, and then decide the flight method and verification method required to achieve it.


Another important point is not to view the site as a single surface. On steep slopes, conditions differ at the upper, mid, and lower parts of the slope, at the slope shoulder and slope toe, and on the valley side versus the ridge side. Rather than trying to capture the whole area efficiently at once, dividing it into ranges with similar conditions will ultimately be more stable. Splitting the flight plan into multiple segments may seem like extra work, but it reduces the risk of reflight and makes it easier to maintain consistent data quality in downstream processes.


Also, during on-site inspections it is useful to check the slope’s orientation and sunlight exposure. On steep slopes shadows tend to be deep, and even at the same site the appearance of images can vary greatly depending on the time of day. Shadows are not inherently bad, but you should avoid shadows so strong that they hinder necessary interpretation or shape reconstruction. Choosing the time of day with consideration not only of wind but also of how the light falls will ultimately lead to more stable accuracy.


Furthermore, on steep slopes, careful post-processing checks are necessary. Even if the overall view looks clean, parts of the slope may show distortion or reduced density. Especially when planning to use the data for earthwork calculations or cross-sections, you should not judge based only on the overall view but perform zoomed inspections of critical areas. Depending on the intended use, check whether inserting cross-section lines reveals anything odd, whether the slope edges are excessively rounded, or whether there are holes in areas prone to shadowing.


When talking about stabilizing accuracy, attention tends to focus on equipment performance and processing software, but on steep slopes the real test is whether you can understand the terrain’s characteristics and change your plan accordingly. Even if you use high-performance equipment, if you haven’t worked out how to present the slope, where to validate, and how to fly safely, you won’t achieve stable results. Conversely, if you have organized the site conditions, you are more likely to obtain results that are sufficiently usable for practical work without resorting to unnecessarily complex operations.


Tasks It's Suited For and Tasks That Require Careful Judgment

A primary task for which drone surveying on steep slopes is well suited is a broad assessment of current conditions. On sites where it is difficult for people to walk and inspect the entire slope, the ability to capture the continuity of the terrain from above becomes highly valuable. It is particularly effective when you want to quickly share an overall picture—such as the presence or absence of collapse, the shape of slope faces, understanding the extent of work, and confirming the placement of temporary facilities. It also pairs well with before-and-after comparisons and fixed-point monitoring, making it easier to present three-dimensional terrain changes that are difficult to convey with photos alone.


The next suitable use is obtaining a rough estimate of earth volumes that include slopes. Of course, attention must be paid to the required level of accuracy, but even on steep slopes, if you clarify the necessary assumptions and acquire terrain data, it can help you quantitatively grasp the conditions of cut and fill. This is advantageous in situations requiring rapid decisions, such as site progress management and reviewing construction plans.


On the other hand, slopes where the ground surface is not sufficiently visible require cautious judgment. In areas with dense vegetation, where the ground is obscured by slope protection materials or nets, or where deep shadows occur, what is visible may not match the terrain you really need to know. At such sites, using acquired data without correctly understanding what it represents can actually lead to mistaken judgments.


Also, tasks that demand very high local accuracy require caution. For example, for applications that need to compare slight differences precisely or to rigorously evaluate the cross-sectional shape of a local area, it is important to consider to what extent error factors specific to steep slopes can be mitigated. Drone surveying is extremely convenient, but it is not a universal solution under all conditions. In practice, it is important to consider supplementing with ground-based measurements or combining it with other methods as needed.


In short, drone surveying on steep slopes is well suited to tasks that need to capture a broad view without approaching hazardous locations, but for jobs with strict requirements on how the ground surface appears or on required accuracy, a preliminary assessment is important. When considering whether to deploy drones, it is more realistic to judge based on the combination of objectives and conditions rather than on “it’s impossible because the slope is steep” or “a drone can do anything.”


Summary

Drone surveying can be conducted even on steep slopes. Indeed, it is particularly effective for assessing the current conditions of slopes that are difficult for people to access and hazardous locations.


However, the same approach used on flat terrain will not work. It is necessary to address issues unique to steep slopes, such as changes in imaging conditions due to elevation differences, bias in appearance depending on slope aspect, local winds, constraints on takeoff and landing locations, difficulties in validating accuracy, and the impacts of vegetation and occlusion.


To recap the six precautions introduced here: designing flight altitude, devising shooting directions, assessing wind, securing takeoff/landing and pilot positioning, the approach to calibration and validation, and measures to address vegetation and occlusion were important. Implementing only one of these measures is not sufficient; the key to success is to design them together based on site conditions and the intended use of the results.


For field operators, what matters is not just judging whether a flight is possible, but foreseeing whether the data will actually become usable results. On steep slopes, more than flying skills, the ability to interpret conditions in advance is required. To meet both safety and quality, it is essential to understand the site spatially and to prepare by working backward from the intended use.


In steep-slope sites, it is also important to tie data obtained from the air to local reference information. In situations where you want to proceed as a series—from verifying current conditions, understanding as-built status, examining earthwork volumes, to sharing with stakeholders—preparing the ground-side positioning environment makes operations easier. If you want to make such site work more efficient, using iPhone-mounted GNSS high-accuracy positioning devices like LRTK and conducting simplified surveying by linking drone-acquired information with on-site positional data can be effective. The more difficult the site is to judge—such as steep slopes—the more the idea of combining aerial situational awareness with high-precision on-the-ground positional checks will support the accuracy and speed of field operations.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page