GNSS Rover Usage Guide: 5 Points to Improve Outcomes in ICT Construction
By LRTK Team (Lefixea Inc.)
Introduction: The Importance of GNSS Rovers in ICT Construction
Today, the construction industry is rapidly adopting digital technologies known as ICT construction (i-Construction). Driven by a shortage of skilled workers due to an aging and declining population and the need for work-style reform, improving productivity through ICT is an urgent task for the industry. Among these technologies, the GNSS rover is an essential tool that supports positioning and surveying on construction sites. A GNSS rover is a device that receives positioning signals from satellites to determine its position coordinates with high accuracy. Traditionally, stakeout work performed by surveyors using total stations or levels required two people, but with the advent of GNSS rovers, as long as satellites are visible, a single person can perform surveys quickly. Because global geodetic coordinates can be obtained directly at many locations even on large development sites, the need to set up and sight reference points each time is eliminated, greatly contributing to efficiency and labor savings in surveying. GNSS technology is also used in machine control for construction equipment such as bulldozers and in drone photogrammetry; the ability to immediately share and centrally manage survey data has dramatically improved the accuracy and efficiency of progress management and as-built inspections (measurement checks of completed structures). Incorporating GNSS rovers into ICT construction is therefore a key to achieving a productivity revolution on construction sites through labor savings and higher accuracy.
This article explains five points for maximizing the use of GNSS rovers in ICT construction to boost on-site productivity. For each major field task—such as as-built management, earthwork volume calculations, stakeout guidance, and field surveys—we describe practical GNSS rover usage techniques and their effects. We also touch on the benefits that LRTK (a next-generation GNSS surveying system using smartphones) brings—such as enabling single-person surveys and cloud integration—showing how anyone can achieve smart construction. Let’s look at the details of each point.
Point 1: Improve Accuracy and Efficiency of As-Built Management
As-built management is the process of inspecting and managing quality by checking whether the completed shapes (as-built) of terrain and structures created in civil engineering work match the design drawings. For example, in foundation or earthwork projects, heights and slopes at many points are measured after construction to confirm there are no deviations from the required design heights. Because the accuracy of as-built management directly affects construction quality, rapid and accurate measurement is required.
Using GNSS rovers significantly streamlines as-built measurement tasks. Where conventional methods estimated finished shapes by measuring only limited points, GNSS allows many points to be measured over a wide area in a short time, enabling detailed understanding of ground elevation differences and slopes. Moreover, because positioning data is obtained in global coordinates, it can be directly compared with the design reference coordinate system, allowing real-time checking of errors against design values on site. For example, by walking and measuring ground elevations at multiple points across a development site with a GNSS rover, average cross-sections can be calculated immediately to confirm as-built conditions on the spot. GNSS surveying also does not require line-of-sight, so there is no need to repeatedly set up surveying instruments, enabling high-accuracy as-built inspections in a short time. Measurement results are automatically saved as digital data, preventing omissions or transcription errors and smoothing subsequent report preparation. The introduction of GNSS rovers has thus brought major advances in as-built management in both accuracy and efficiency. By increasing the frequency of quality assurance while reducing work time, inspection steps cease to be a bottleneck, providing more flexibility in overall site schedule management.
Point 2: Complete Earthwork Volume Calculations Quickly with a Smartphone and GNSS
Calculating earthwork volumes (cut and fill quantities) is an important process in construction management. Traditionally, this required creating cross-sections from survey data to compute volumes or scanning the site with expensive equipment such as 3D laser scanners and analyzing the data in the office, which took considerable time and effort. However, combining a smartphone and a GNSS rover can dramatically streamline this volume calculation work.
The latest GNSS rover systems combine high-accuracy GNSS positioning with smartphone-integrated LiDAR scanners to quickly acquire 3D point cloud data of the terrain. The obtained point clouds have centimeter-level position coordinates (half-inch accuracy), enabling direct on-site calculation of cut-and-fill volumes or immediate analysis of differences between the design model and the as-built. In fact, when data is processed in a dedicated app, everything from distances and areas to volume calculations can be performed on a single smartphone. For example, a residual soil fill volume measurement that traditionally took half a day can be completed in minutes on site using a GNSS rover, and the results can be immediately shared with stakeholders. Furthermore, the acquired point cloud data synchronizes to the cloud instantly, allowing remote office staff to view the site’s 3D model in real time and issue instructions. This significantly shortens the cycle of progress and quantity control (as-built quantity management) and streamlines overall project progress management. Volume calculations using GNSS rovers and smartphones are rapid, low-cost, and highly accurate, making them indispensable methods in ICT construction sites today.
Point 3: Guidance Features Reduce the Burden of Stakeout Work
Stakeout work for surveying was traditionally a labor-intensive process requiring two experienced surveyors. It involved measuring distances and angles from reference points to the points where stakes were needed, using tapes and total stations for direction guidance. The GNSS rover’s coordinate navigation function can dramatically simplify such stakeout tasks.
The coordinate navigation function guides an operator on-screen to a predefined target coordinate from the design drawings. The smartphone or tablet map displays the current position and the target point, providing real-time directions on how many meters and in which direction to move. The operator simply walks following the directions and can reach the point where the stake should be driven with centimeter-level accuracy (half-inch accuracy). Modern devices like LRTK provide display guidance that is easy to see outdoors during the day, so operators can work without confusion even under strong sunlight. Additionally, using a smartphone’s AR (augmented reality) features, lines and points from the design data can be overlaid on the actual view. Being able to intuitively confirm target positions through the camera greatly enhances both ease of understanding and accuracy for stakeout and layout marking tasks. As a result, one person can efficiently handle many stakeout positions. This guidance is especially powerful on large sites or sites with few reference points, eliminating the need to set up surveying instruments for each reference and greatly reducing working time and effort. Allowing site staff to confirm and place stakes themselves also removes construction interruptions caused by waiting for survey teams and significantly improves construction efficiency.
Point 4: Simplify Reporting Tasks with Field Surveys and Photo Geolocation
Field surveys involve taking many photos, noting positions and conditions, and recording information to understand construction locations and confirm as-built conditions. Traditionally, organizing these photos and creating reports has been cumbersome, and it has often been difficult to later match “which photo corresponds to which location.”
By linking GNSS rovers with smartphones, “photo geolocation”—simultaneous photography and positioning—becomes possible, greatly simplifying reporting tasks. Using positioning photo features such as those in LRTK, photos taken with a smartphone are automatically tagged with position information of centimeter-level accuracy (half-inch accuracy) and saved to the cloud instantly. Each photo records when, where, and in which direction it was taken, enabling intuitive management and sharing of site photos on a map. For example, photos taken while searching for buried utilities retain accurate coordinates, making it easy to relocate the same spot later. If cracks in concrete structures are photographed periodically, the cloud can be used to compare past photos and quantitatively evaluate deterioration progression. These photo data synchronize to the cloud at the push of a button, and photo markers and orientation arrows are automatically displayed at the shooting locations. This greatly reduces the need for handwritten notes on site and the office work of creating photo ledgers, eliminating location recording errors. It is truly a groundbreaking feature that directly improves efficiency and reporting accuracy in site surveys.
In addition, GNSS’s high-accuracy position information is also used in photogrammetry for generating 3D models from multiple photos. When creating point cloud models from numerous photos taken by drones or smartphones, combining GNSS-positioned coordinates yields accurate, properly scaled 3D models. This is powerful for visualizing as-built surfaces and calculating earthwork volumes, allowing stakeholders to grasp the current state in three dimensions and increasing the persuasive power of reports.
Point 5: Maximize Site Productivity with One-Person Surveying and Cloud Integration
Finally, we discuss the effects of one-person surveying and cloud integration enabled by GNSS rovers. With a shortage of skilled survey technicians, the ability for anyone to complete surveying tasks alone using GNSS rovers is highly valuable. Tasks that previously required contracting specialized surveying companies can increasingly be handled in-house, reducing costs and accumulating technical know-how. For example, cases have emerged where a site supervisor completed as-built surveying of a development site alone in about one hour after introducing LRTK, whereas previously two people took half a day. In practice, even on sites without resident surveying specialists, construction managers can now perform necessary surveys with a smartphone in hand and share data to the cloud on the spot. Real-time information sharing allows office engineers to immediately check data, give instructions, and perform post-processing, smoothing coordination between site and office. Decisions that used to wait for survey results can now be made instantly on site, reducing unnecessary interruptions and rework.
The simple combination of a GNSS rover and a smartphone has ushered in an era where each field staff member can carry a personal surveying tool. The mobility of keeping a device in a pocket and being able to measure whenever needed dramatically increases site productivity. Intuitive UI designs make these tools usable even by less-experienced staff, enabling everyone to utilize survey data and proving useful for personnel development and skill transfer. It is for these reasons that smartphone GNSS surveying has been widely adopted by many construction companies.
Moreover, cloud integration enables automatic centralized management of all data acquired on site. Drawings, point clouds, photos, and other related materials are organized in the cloud, making it easy to find past data later and to export CSV or CAD data for subsequent processes. Constant sharing of the latest information among stakeholders reduces errors due to miscommunication and duplication of effort. Additionally, labor savings contribute to improved safety. By reducing the need for people to enter hazardous areas for surveying—for example on busy roadworks or steep slopes—accident risks can be lowered. Equipping each worker with a GNSS device so they can survey from safe positions contributes significantly to preventing occupational accidents. As described above, GNSS rovers that enable one-person surveying and cloud utilization are transforming how construction sites work and are the key to maximizing productivity and information utilization.
Conclusion: Simple Surveys with LRTK Make Smart Construction Accessible to All
We have explained five points for ICT construction using GNSS rovers. As-built management improves in both accuracy and efficiency; earthwork volume calculations can be completed instantly on a smartphone; stakeout guidance enables accurate single-person execution; and field survey reporting is simplified through photo geolocation. One-person surveying and cloud integration are changing how sites operate.
Particularly noteworthy is the smartphone GNSS solution exemplified by LRTK. With LRTK, RTK-level surveying accuracy can be achieved easily with a smartphone, allowing anyone to perform surveying and measurement whenever needed. Tasks that once required specialized technicians and expensive equipment can now be handled routinely through simple surveys enabled by LRTK. The era of “smart construction for everyone” is becoming a reality. These ICT construction initiatives are also expected to contribute to achieving the Ministry of Land, Infrastructure, Transport and Tourism’s productivity improvement goal for construction sites (a 20% improvement by 2025).
If you have not yet introduced GNSS rovers to your site, consider starting with small-scale surveying tasks to experience their convenience. The wave of ICT construction is expected to accelerate, and proactive adoption of digital technologies will determine site competitiveness.
Actively leverage the labor-saving and advanced benefits of GNSS rovers and LRTK to achieve both productivity improvement and quality assurance on your sites. By adopting the latest tools, construction sites of the future will become smarter and more efficient. The use of such digital tools will be a key to the future of the construction industry. Armed with GNSS rovers, let us together pioneer the future of construction sites through smart construction.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.