Is a Terrestrial Laser Scanner Necessary for Cultural Heritage Surveys? Six Basics Before Introduction

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

In the field of cultural heritage surveys, recording accuracy, reproducibility of work, and continuity of preservation are being emphasized more than ever. Whether the subject is a building, a stone artifact, or archaeological remains, once cultural heritage is damaged it is difficult to restore to the same condition, so how accurately the state at the time of survey can be preserved is critically important. For that reason, attention is focusing not only on conventional photography, measured drawings, and visual records, but also on methods that preserve shape in three dimensions.


Among these, the terrestrial laser scanner is often considered a representative option for three-dimensional recording in cultural heritage surveys. Because it can easily capture surfaces over a given area and obtain a high-density representation of overall shape, it is suited to recording complex cultural properties and understanding large sites. On the other hand, introducing one does not solve every problem. Depending on the nature of the object and site conditions, there are situations where its performance is limited. Moreover, if you do not consider how the acquired data will be handled, you may end up unable to make practical use of the measurements despite having collected them.


Therefore, what should really be considered in cultural heritage surveys is not simply a binary decision of whether a terrestrial laser scanner is necessary or unnecessary. It is important to decide whether to introduce one after understanding for what purpose the survey will be conducted, in which situations it is effective, what limitations it has, and how it should be combined with other methods. For those responsible for cultural heritage surveys, clarifying operational assumptions before looking at equipment specifications is the quickest way to reduce failures.


This article explains the six basics you should grasp before deciding whether a terrestrial laser scanner is necessary for cultural heritage surveys. It is organized to be useful not only for those already interested in three-dimensional measurement, but also for those considering introduction or wanting to clarify differences from existing survey methods.


Table of Contents

• Why terrestrial laser scanners attract attention in cultural heritage surveys

• Basic 1 Decide the recording purpose first

• Basic 2 Assess compatibility between the object and site conditions

• Basic 3 Understand the relationship between required accuracy and work efficiency

• Basic 4 Plan measurements assuming blind spots and missing data

• Basic 5 Design post-acquisition processing and utilization methods

• Basic 6 Consider collaboration with other methods and positional information from the outset

• How to make an introduction decision that avoids failure in cultural heritage surveys


Why terrestrial laser scanners attract attention in cultural heritage surveys

The main reason terrestrial laser scanners attract attention in cultural heritage surveys is that they make it relatively easy to preserve complex shapes over wide areas in three dimensions. Cultural properties contain much information that cannot be fully captured by planar records alone. Building warp or tilt, weathering of stone surfaces, joinery relationships between members, relationships with topography, and structural deformations are elements that are prone to being overlooked or interpreted differently when using only two-dimensional drawings or photographs. If recorded as three-dimensional data, features that were not noticed on-site can be checked later, and the shape information can be handled as shared data among stakeholders.


Also, in cultural heritage surveys, it is not always possible to freely enter the site multiple times. Restrictions such as opening hours, preservation management constraints, scaffolding or access limitations, weather, and consideration for the surrounding environment can make re-surveying more difficult than in general surveying. Under such conditions, it is valuable to acquire as much shape information as possible in a single on-site visit. Terrestrial laser scanners are strong in capturing the overall shape of a subject and are effective when you want to use on-site time efficiently.


Furthermore, preservation and utilization of cultural heritage do not end with recording. The acquired data are used in many downstream processes: pre- and post-repair comparison, monitoring changes over time, visualization for exhibitions or public display, sharing research materials, and decision-making for disaster prevention or restoration after damage. Three-dimensional data obtained by terrestrial laser scanners can be applied to these multiple purposes and can become foundational data for long-term cultural heritage management beyond mere on-site records.


However, it must not be misunderstood that terrestrial laser scanners are a panacea for cultural heritage surveys. They are indeed a powerful option, but there are situations where other methods are more suitable for fine detail expression, color information, access to narrow spaces, portability, or adaptation to measurement environments. That is why it is necessary to organize the basics and clarify the intended use before introduction.


Basic 1 Decide the recording purpose first

When considering the introduction of a terrestrial laser scanner, the first thing you should decide is not the equipment but the recording purpose. In cultural heritage surveys, even when dealing with the same subject, the required recorded content varies greatly depending on the survey’s purpose. Whether you want to preserve overall shape, check deterioration, create base drawings for repair design, record entries in a preservation ledger, or prepare materials for public use affects required density, coverage, accuracy, and post-processing methods.


For example, if the goal is to understand the overall arrangement or appearance of a building, priority should be given to recording the entire subject without omission. On the other hand, if you want to confirm fine carvings or surface wear on stone artifacts, it is more important to be able to capture the necessary parts with sufficient detail than to capture the whole extensively. Moreover, in repair or conservation practice, data must be robust enough for dimension checking and section extraction, not just visually three-dimensional. Thus, even for the same cultural heritage survey, the measurement plan changes with purpose.


If you introduce equipment while leaving this ambiguous, on-site practice tends to swing toward either capturing as widely as possible or capturing as finely as possible. However, more data is not always better. Acquiring data at a density that is excessive for the purpose increases work time, processing load, and data management burden. Conversely, if the acquisition is insufficient for the purpose, you may be unable to return to the site and will be in trouble. The important thing is to preserve the necessary and sufficient information in a form that is easy to reuse.


Because multiple stakeholders are often involved in cultural heritage surveys, sharing the purpose is also important. Preservation staff, research staff, design staff, and management staff each want slightly different information. Before deciding whether to use a terrestrial laser scanner, clarify who will use the data for what, what deliverables are expected, and what secondary uses are anticipated in the future; this makes equipment selection and decisions about measurement coverage easier.


In short, whether a terrestrial laser scanner is necessary for a cultural heritage survey is determined by compatibility with the purpose, not by the fame or scale of the object. If the recording purpose is clear, it becomes easier to see whether the terrestrial laser scanner should play the leading role, be used as a supplement, or be replaced by other methods. The first step in the introduction decision is to verbalize the recording purpose, not to compare equipment.


Basic 2 Assess compatibility between the object and site conditions

Terrestrial laser scanners are an excellent measurement method, but they are not equally appropriate for all cultural properties. Before introduction, you need to confirm the compatibility between the nature of the object and site conditions. Misjudging this can leave you with results that fall short of expectations and the impression that the equipment is difficult to use.


First, terrestrial laser scanners are suitable for sites where you can take some distance to survey the subject. They are effective for capturing facades of buildings, elevations of pagodas and halls, stone walls, large archaeological features, structures within gardens, and overall spatial shapes. By measuring from multiple directions, it is also easy to record the size of the subject and its relationship with surrounding topography.


Conversely, operation becomes difficult in extremely narrow places or where it is hard to secure equipment setup positions. For example, blind spots increase near the backs of members, in densely cluttered areas around the base, in spaces with many obstructions, or when the subject is too close. Intricate shapes and deep recesses may require increasing the number of setup positions, but there are limits. For some subjects, it is more efficient to use other methods that excel at close-range photography in combination.


Cultural properties also have diverse materials. Surfaces of stone, wood, earth, plaster, metal, tiles, etc., have varying reflective characteristics. Depending on surface conditions, some areas may be easy to acquire and others difficult, leading to missing data or noise. In particular, near-mirror surfaces, strongly reflective areas, and thin, intricate decorative parts require careful site planning. It is important to understand that simply placing the equipment and measuring does not yield uniform data.


Site environment also has a major influence. Outdoors, weather, sunlight, wind, ground stability, movement of nearby people or vehicles, and swaying trees or grass can affect measurements. Cultural heritage sites often include elements that hinder measurement, such as protective fences, explanation boards, temporary facilities, and visitor flow. Indoors, lighting conditions, narrowness, steps, floor vibration, and access restrictions must be considered.


Assessing compatibility does not mean making a simple judgment about whether a site is suitable for a terrestrial laser scanner. It means deciding which areas to capture with the scanner and which areas will require supplementation. Because cultural heritage surveys often require a balance between overall understanding and detailed recording, evaluating compatibility is central to the introduction decision. If you organize the characteristics of the object and site constraints in advance, you can greatly reduce measurement failure.


Basic 3 Understand the relationship between required accuracy and work efficiency

When considering three-dimensional measurement in cultural heritage surveys, accuracy is a very important factor. However, making the introduction decision based solely on accuracy can lead to impractical operations. What matters is understanding the relationship between required accuracy and work efficiency, and finding a compromise that suits practical work.


Required accuracy in cultural heritage surveys varies by use. For preserving overall shape, priority is on capturing the subject stably. For deterioration recording or repair-related studies, local accuracy and section reliability may be more important. In other words, accuracy is not simply “the higher the better”; the required level depends on the intended use.


Terrestrial laser scanners can obtain high-density point clouds, but the quality of results depends on the number of measurement positions, settings, distance to the subject, overlap, and post-processing methods. If you capture excessively fine detail on-site, the number of measurements increases, and more time is spent moving and setting up. If the acquired data become heavy, post-processing burden increases. As a result, both on-site and office work take longer and the staff workload increases.


Conversely, if you prioritize efficiency too much and capture only roughly, you may lack necessary information for drawing or comparative analysis. Because re-visiting sites is often difficult in cultural heritage surveys, this lack can be a major problem. Therefore, it is important to clarify required deliverables before measurement and work backward to determine the information volume needed for those deliverables.


Moreover, discussions about accuracy should consider not only the equipment’s standalone performance but the overall operational accuracy. If on-site setup is unstable, overlap is insufficient, or the approach to registration is vague, you will not achieve the expected quality. In cultural heritage surveys, complex shapes and difficulty establishing references make it critical to have standardized measurement procedures. Even with high-performance equipment, inadequate planning yields unstable results.


In short, before introduction, you should consider not whether to aim for the highest accuracy but whether you can reliably secure the necessary quality without undue burden. Cultural heritage surveys are not one-off experiments; they are tasks that require recording, sharing, and passing data to downstream work. Therefore, an operational design that accounts for on-site burden, processing burden, and storage burden is required. Understanding the balance between accuracy and efficiency leads to a realistic introduction decision.


Basic 4 Plan measurements assuming blind spots and missing data

One common misunderstanding when first introducing terrestrial laser scanners is the belief that a single measurement can completely record the subject. In reality, it is safer to assume that blind spots and missing data will inevitably occur at cultural heritage sites. The important thing is not to eliminate missing data entirely but to understand where they are likely to occur and incorporate countermeasures into the measurement plan.


Cultural properties are more complex in shape than ordinary structures. Under eaves, deep within bracket complexes, highly reliefed sculptures, overlapping members, gaps between stones, back sides of steps, and areas hidden by vegetation—there are many parts where laser does not easily reach. Furthermore, you may not be free to choose standing positions on-site. Constraints such as not being able to approach for protection reasons, limited access areas, fragile floors that cannot bear equipment, or the need not to block visitor flow reduce setup position freedom.


Therefore, in measurement planning you need to think not only about where to view the subject from but also about what will become invisible. Sometimes walking around the subject is enough, but for cultural heritage you must also consider vertical relationships, interior-exterior relations, and interference with surrounding structures. Especially when you may use the data in plans and sections as well as elevations, it is important to arrange setups with overlap so that information needed later is not missing.


Also, missing data can be compensated for if noticed on-site, but it becomes difficult if you only discover it back at the office. Since re-visit is often difficult in cultural heritage surveys, a system for on-site verification is indispensable. It is not uncommon that important decorative parts, joints, or damaged areas are not well captured despite thinking they were measured. Therefore, decide in advance the verification points for each major part on-site, and do not finish work based on a mere sense of overall completeness.


Furthermore, countermeasures for missing data are not limited to increasing measurement positions. In some cases, prioritizing acquisition targets and distinguishing between essential and supplementary parts is effective. In cultural heritage surveys, it is not always realistic to capture everything uniformly at high quality. In such cases, clarifying what must not be missed and concentrating time and effort there leads to better outcomes.


Whether a terrestrial laser scanner can be used effectively depends less on avoiding any missing data and more on whether you can design measurements anticipating gaps. In cultural heritage surveys, imagining unseen risks on-site and absorbing them into the plan is crucial. Whether you adopt this mindset before introduction greatly affects operational stability.


Basic 5 Design post-acquisition processing and utilization methods

When introducing a terrestrial laser scanner for cultural heritage surveys, attention tends to focus on on-site measurement itself, but what is truly important is post-acquisition processing and utilization. No matter how carefully you measure, if you cannot organize the data and use it in the necessary form, its practical value will not increase. Before introduction, you need to consider the workflow including post-acquisition steps.


Three-dimensional data are not finished products just by being acquired. Multiple point sets must be combined, unnecessary parts trimmed, necessary extents refined, and the data prepared in a format that stakeholders can use; only then do they become deliverables. In cultural heritage surveys, uses often split among survey reports, drawing creation, comparative analysis, archival preservation, and public dissemination, each requiring different data formats and presentation styles. If this is not organized, you can end up with data that exist but are unusable.


The long-term preservation perspective is also indispensable in the cultural heritage field. Surveys should not be treated as a single-year task; it is important to store data so they can be used for future re-surveys, additional recordings, and pre- and post-repair comparisons. For that purpose, not only the data files themselves but also management information about when, where, and under what conditions the data were acquired must be organized. If file names are messy or the storage method is known only to the responsible person, reusing the data after a few years becomes difficult.


Post-acquisition processing is also closely related to staffing. If on-site staff and processing staff are separate and there are no handover rules, quality varies. In small organizations, one person may handle everything from fieldwork to processing, but in that case planning must account for the workload. Even if you can acquire a large amount of data quickly on-site, continued operation is difficult if downstream processing cannot keep up.


You should also concretely assume how you will use the data after introduction. Do you only need static figures for reports? Do you want to conduct sectional checks? Do you want to share with repair staff? Do you want to publish for the general public? The level of preparation required changes accordingly. In cultural heritage surveys, you must balance record quality and operational ease, so planning for downstream processes—not just the site work—becomes a major criterion in the introduction decision.


In short, introducing a terrestrial laser scanner is not just about acquiring equipment but about establishing an operational system for three-dimensional recording. Judging solely by the moment of on-site measurement can lead to concentrated burdens later and make continuation difficult. To make it a practicable system in cultural heritage surveys, you must design who will handle the data after acquisition, how it will be stored, and how it will be utilized.


Basic 6 Consider collaboration with other methods and positional information from the outset

To maximize the value of a terrestrial laser scanner in cultural heritage surveys, it is important not to try to make it a standalone solution. In practice, the objectives of three-dimensional recording are not singular: overall understanding, detail confirmation, sharing positions, drawing creation, temporal comparison, and public use often coexist. Therefore, rather than trying to cover everything with a terrestrial laser scanner, it is more practical to consider from the outset how it will collaborate with other methods and positional information.


For example, while terrestrial laser scanners are strong at capturing overall shape, there are situations where detailed presentation or local supplementation is needed. Conversely, close-range methods excel at details but can struggle to maintain consistency across broad spatial relationships. Because cultural heritage surveys often require simultaneous understanding of the whole and the details, an arrangement that assigns roles to different methods is effective.


Positional information becomes important here. Records of cultural properties are not only about shape but also about location and how they relate to their surroundings. Three-dimensional capture of a single building or stone artifact can leave the layout within a site or connections to surrounding topography ambiguous. By properly attaching positional information on-site, you make it easier to overlay other data later and to compare across continuous surveys. In cultural heritage work, continuity across years is important, so this perspective is particularly critical.


If positional information handling is well organized, on-site information sharing also becomes smoother. It becomes easier to determine which locations have been captured, where missing data exist, and which parts need additional investigation, reducing discrepancies in understanding among stakeholders. Since cultural heritage surveys involve multiple perspectives—preservation, research, construction, and management—being able to link shape information with positional information is a major advantage.


From this viewpoint, the decision to introduce a terrestrial laser scanner cannot be based solely on standalone performance comparisons. Consider how to position it as the equipment responsible for overall recording, how to connect it to detailed recording and on-site verification, and how to integrate it with positional information. Only then will it become an operational approach rooted in practice. In cultural heritage surveys, functionality within a recording system is more important than the superiority of a single tool.


How to make an introduction decision that avoids failure in cultural heritage surveys

As shown above, whether a terrestrial laser scanner is necessary for cultural heritage surveys is not decided simply because it is new equipment or because others are using it. What is important is to assess whether it suits your site after mastering the six basics: recording purpose, compatibility with the object, required accuracy, preparation for missing data, post-processing system, and integration with other methods and positional information.


Cultural heritage surveys deal with subjects that are not reproducible, so redoing records is difficult and measurement failures have long-lasting downstream effects. At the same time, it is not appropriate to convert everything into high-density three-dimensional data; you need to choose the appropriate scope and method for the purpose. Terrestrial laser scanners are a very powerful tool, but their necessity depends on the subject and the operational setup. The key is not to make introduction itself the goal.


If you are reviewing your cultural heritage survey recording system, first identify parts of your work where a comprehensive capture is necessary, where revisiting the site is difficult, and where you want to preserve spatial relationships—these are areas where three-dimensional measurement is truly effective. Then organize which extents will be covered by a terrestrial laser scanner, which will be supplemented by other methods, and how to connect these to deliverables; this will make the introduction decision consistent.


Additionally, in cultural heritage surveys, not only three-dimensional data itself but also on-site position sharing and continuity of records are important. Consider how to link shape measurement with positional information. Combining terrestrial laser scanner capture of overall shape with an iPhone-mounted GNSS high-precision positioning device such as LRTK can be effective when you want to more nimbly perform on-site position verification, supplementary surveys, photo records, and additional measurement standards. At large cultural heritage sites, being able to share precisely where each record was taken improves downstream organization and efficiency for additional surveys. When deciding whether to introduce a terrestrial laser scanner, consider it not as a standalone device but together with means of acquiring positional information like LRTK, and examine how to optimize overall on-site recording operations—this perspective will make the technology more compatible with practical cultural heritage survey work.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.