Revolutionizing Construction Sites with the Latest Technology That Guides Pile-Driving Coordinates with cm level accuracy (half-inch accuracy)

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Table of Contents

• What is pile-driving guidance?

• Guiding pile-driving coordinates to cm level accuracy (half-inch accuracy) with RTK technology

• Improved work efficiency using smartphone RTK

• Use cases of RTK pile-driving guidance

• How to introduce an RTK pile-driving guidance system

• Simple surveying with LRTK

• Summary

• FAQ


What is pile-driving guidance?

"Pile-driving guidance" is the process of directing workers to the correct points in order to drive piles or install survey stakes at the exact positions specified on design drawings in civil and construction works. For road and bridge construction, piles must be driven at the designated coordinates such as foundation locations and structural endpoints. The accuracy of these pile-driving positions is a critical factor that affects the quality of the entire structure; even small deviations can lead to overall construction misalignment or mistakes, so high accuracy at the centimeter level (inch-level accuracy) is required.


However, traditionally this pile-driving guidance work has relied on experienced crews and manual surveying. In common practice, surveyors use the coordinates from drawings and set out points on site with tape measures or a total station (optical surveying instrument), then indicate pile-driving positions by driving wooden stakes or marking with spray paint. This manual positioning work requires multiple people and time, and is prone to human error. If coordinates are misread or markings are misplaced, rework to redo piles becomes necessary. Furthermore, in sites with complex terrain or poor visibility, visual guidance has limits, and conventional methods face the challenge that it is difficult to drive piles both efficiently and accurately.


Guiding pile-driving coordinates to cm level accuracy (half-inch accuracy) with RTK technology

One of the latest technologies attracting attention in recent years to solve these traditional problems is pile-driving coordinate guidance using RTK (Real-Time Kinematic). RTK is a high-precision positioning method using GNSS (Global Navigation Satellite System). It uses two GNSS receivers, a base station and a rover, that receive satellite signals simultaneously and correct the difference in their position information in real time, reducing positioning error to about a few centimeters (a few inches). While standalone GPS positioning used to have errors of several meters (several feet), RTK positioning can reduce errors to almost within a few centimeters (a few inches), achieving dramatically greater accuracy.


Applying this RTK positioning technology to pile-driving work enables guiding piles to the target coordinates on the design drawings with cm level accuracy (half-inch accuracy). For example, a terminal with a GNSS receiver can be mounted on a pile driver or a worker can carry a GNSS terminal to check the difference between their current position and the target pile position while driving the pile. The terminal screen displays direction arrows and distance information to the target point, so by aligning according to these indicators, piles can be installed at the intended points with almost no deviation. Parts of the work that used to rely on the survey crew’s stakes or painted marks and on judgement and experience can now be performed by simply following digital guidance provided by RTK coordinate navigation, allowing even less-experienced personnel to perform high-precision pile-driving. As a result, positioning errors, construction mistakes, and rework are prevented, maintaining consistently high construction quality. Improved pile-driving accuracy directly prevents misalignment in subsequent trades and ensures the overall quality of the structure, so RTK-based pile-driving guidance is becoming an indispensable technology on sites.


Improved work efficiency using smartphone RTK

While RTK adoption delivers major gains in accuracy, it also offers dramatic advantages in work efficiency compared with traditional methods. If GNSS-based coordinate guidance is available on site, the surveying and stake-out processes that previously required multiple people and careful work can be greatly simplified. For example, a pile position set-out that used to be performed by a two-person team can, with RTK guidance, be completed by a single worker from positioning to pile driving. Reducing to one person lowers staffing burdens and cuts labor costs. Also, guiding around heavy machinery can be done with fewer people, reducing the risk of contact between personnel and equipment and improving safety.


Work time savings are also notable. Because current position can be obtained in real time with high precision, the speed of setting out survey points increases dramatically, reducing unnecessary movement and surveying. In one comparative experiment, using a pile-driving system that combined GNSS and AR technologies reduced the time required for pile position setting to about 1/6 compared to the conventional optical surveying method. This is because workers can reach survey points simply by following on-screen guidance and there is no need to re-establish the surveying instrument, allowing work to proceed efficiently. From the site-wide perspective, the number of pile-driving points that can be handled per day increases, contributing significantly to shorter construction schedules.


Thus, RTK-based pile-driving guidance also offers cost-reduction benefits through labor savings and speed improvements. Simplifying the surveying process reduces outsourced surveying and labor costs, and cutting rework and shortening schedules reduces wasteful expenses. Moreover, digital technology enabling anyone to perform surveying and stake-out work can address the construction industry’s shortage of skilled workers. New employees and temporary staff can accurately drive piles by following on-screen arrow guidance, so everyone on site can become productive. This leads to more uniform and improved work quality and offers significant advantages in quality control.


Note that RTK positioning using GNSS typically provides accuracy on the order of ± a few centimeters (± a few inches). Millimeter-level accuracy required for specialized tasks (such as installing precision equipment) still requires optical precision surveying instruments, but for most civil surveying tasks centimeter-level accuracy (inch-level accuracy) is sufficient. Rather than pursuing excessive precision at the cost of time and money, it is important to achieve overall optimization by using RTK and conventional methods as appropriate.


Use cases of RTK pile-driving guidance

RTK-based pile-driving guidance technology is increasingly being used at various construction sites. One reason for this spread is the Ministry of Land, Infrastructure, Transport and Tourism’s promotion of "i-Construction (ICT construction)," which encourages the adoption of GNSS positioning technology on sites. Specific use cases include the following:


• Road construction: RTK guidance is used for pile-driving along road centerlines and property boundaries. Based on reference point data from design drawings, it is possible to set out positions such as pavement edges and drainage structures with centimeter-level precision (inch-level precision). In some cases, operators were able to perform accurate cut-and-fill work up to the final line themselves using GNSS guidance without installing the conventional batter boards (temporary lines set up for layout).

• Bridge construction: RTK pile-driving guidance has been introduced for locating pile foundations used for piers and abutments. Instead of surveying and marking multiple pile positions across a wide area in advance, crews used GNSS-equipped terminals on site to guide each pile position individually. This enabled reliable pile installation at designated positions even in mountainous areas with poor visibility, contributing to improved accuracy in girder and abutment installations.

• Underground infrastructure works (water/sewer, communication cables, etc.): RTK guidance is also used for setting excavation positions for buried pipes and cables. Over wide sites or long runs, piles or marks can be installed at regular intervals to design coordinates with high precision. On some sites, AR pile-guidance functions that combine GNSS antennas and cameras display the direction to the next excavation point on the screen for intuitive identification. Workers can follow the on-screen arrow guide to place accurate markers at start/end points and bends of buried utilities, helping reduce trench location errors.


As shown, success stories of RTK pile-driving guidance have been reported across fields from roads and bridges to general infrastructure. Because of its combined benefits of high precision and efficiency, major contractors and surveying firms are actively adopting it, and RTK technology is steadily penetrating site digitalization (DX). In Japan in particular, the development of the Quasi-Zenith Satellite "Michibiki" (QZSS) has enriched high-precision GNSS environments, further supporting the wider use of this technology.


How to introduce an RTK pile-driving guidance system

So what is required to introduce RTK pile-driving guidance at your sites, and what steps should you take? Recently, the barriers to adoption of this technology have dropped considerably, and with basic surveying knowledge it can be operated after short training. Typical preparation and workflow are as follows:


• Equipment preparation: Prepare a high-precision GNSS receiver (rover) that supports RTK positioning and a terminal to display and operate its positioning information (a dedicated controller or a smartphone/tablet). The rover GNSS receiver can be mounted on a survey pole for handheld use or installed on heavy machinery as needed. If receiving correction information from a base station via the internet, prepare the communications environment by inserting a SIM card into the receiver or terminal or carrying a mobile Wi‑Fi router.

• Setting reference points: If there are known reference points (points with accurate coordinate values) near the site, register those coordinates in the RTK system. If setting up your own base station, install the GNSS antenna in a stable location where errors are less likely to accumulate and operate it as the base station receiver. Alternatively, connecting to a network RTK service (VRS, etc.) that uses the Geospatial Information Authority’s reference station network allows you to start high-precision positioning without placing a physical base station.

• Uploading coordinate data: Prepare a list of design coordinates for planned pile locations and import them into the application on the terminal used for guidance. Cloud-enabled systems are convenient because you can upload coordinate data on the web in advance and sync it with on-site terminals to complete the setup. Recently, systems have appeared that can directly import points from digital construction drawings (CAD data or BIM/CIM models).

• On-site guidance work: Turn on the GNSS receiver and start positioning, then select the target point you want to guide to in the guidance app on the terminal. The app will display the offset (direction and distance) from your current location to the target coordinates, and you move the receiver (for example, the pole tip) according to that guidance. The screen shows arrows indicating the direction to go, remaining distance, and, if necessary, elevation difference, so anyone can intuitively navigate to the target location. When you reach the desired point, mark the spot and drive the pile.

• Recording and sharing: Mark completed pile points in the app or save the measured coordinates. With cloud-integrated systems, pile locations and work history data obtained on site are uploaded to the cloud immediately and can be shared in real time with office staff or other teams. This eliminates the need to take surveying results back to the office for reorganization, streamlining progress management and quality checks.


With these steps, an RTK pile-driving guidance system can be operated relatively simply. Recently, user-friendly surveying apps that utilize smartphones have appeared, and interfaces that even site workers can operate intuitively have been developed. In addition, the cost of the required equipment set has fallen significantly compared to the past, making it feasible for small- and medium-sized construction sites to adopt these systems.


Simple surveying with LRTK

Among the various RTK pile-driving guidance systems, a solution recently gaining particular attention is "LRTK," developed by Refixia (a startup from Tokyo Institute of Technology). LRTK distinguishes itself from conventional systems, and its greatest feature is that it realizes RTK positioning and AR guidance using a handheld smartphone.


Where traditional pile-guidance devices often required dedicated controllers or large equipment, LRTK offers the convenience that work can be completed with a single smartphone. By attaching a dedicated ultra-compact GNSS receiver to an iPhone, iPad, or similar device, an ordinary smartphone quickly becomes a high-precision positioning device. The receiver module weighs only a few hundred grams and has a built-in battery, making it compact enough to carry in a pocket. The system introduction cost is also very reasonable compared to conventional high-precision surveying equipment, so a new style in which each worker carries a smartphone RTK device is becoming realistic.


LRTK’s use of AR (augmented reality) technology to provide visual pile-guidance is another key feature. The smartphone camera view is overlaid with target points from the design and directional arrow signs to intuitively navigate workers to the target location. For example, using LRTK’s "coordinate navigation" feature, workers holding smartphones can be guided to pre-specified target coordinates in the cloud with centimeter precision (inch precision). The screen always displays the direction to go and the remaining distance, allowing even beginners to reach the target without getting lost. What is particularly impressive is that the device assists with the final fine adjustments as you approach the target, supporting automatic alignment so that only a few centimeters (a few inches) of error remain. This enables the final fine-tuning of pile positions, which traditionally relied on experience, to be performed accurately and easily thanks to digital assistance.


LRTK also offers the unique ability to place virtual piles (AR piles) on site. Even on asphalt pavements where you cannot drive a physical pile or in hazardous locations, the smartphone screen can display a virtual pile to indicate the position, allowing accurate confirmation of locations where physical marks cannot be left. Additionally, for distant points or steep slopes that are difficult to approach, combining photogrammetry functions to acquire coordinates and projecting piles onto AR enables safe position setting. These features represent an innovative approach that makes pile-guidance possible in situations that were previously difficult.


LRTK can also be used as a simple surveying tool. Coordinates of points collected on the smartphone and captured photos are saved immediately to the LRTK cloud and can be shared with stakeholders. Therefore, there is no need to take field survey data back to the office for reworking, and progress and results can be shared with the entire team in real time. Because multiple devices can synchronize data, even on large sites the whole team can easily work while always checking the latest pile point information. In short, LRTK is a next-generation smartphone RTK surveying system that combines ease of use, high precision, visual clarity, and cloud integration, enabling "simple surveying" that anyone can use on site.


Summary

So far, we have introduced pile-driving guidance using smartphone RTK, covering its precision and efficiency improvements and the features of the latest system LRTK. You can see how pile position setting, which used to rely on manpower and experience, is dramatically improved through the application of RTK technology. With the power of RTK-GNSS to pinpoint positions at the centimeter level (inch-level accuracy), any worker can drive a pile at the intended position, resulting in more uniform and improved construction quality. At the same time, the efficiency gains in surveying reduce schedules and staffing needs, achieving both productivity improvements and cost reductions.


Smartphone RTK solutions like LRTK in particular have the potential to further accelerate digital transformation (DX) in construction. Intuitive AR guidance is turning tasks that once required mastery into tasks that anyone can perform. Realizing high-precision construction and improved productivity benefits both clients and contractors, and ultimately contributes to the overall efficiency of infrastructure development.


As GNSS satellite systems evolve and communications environments improve, RTK-based pile-driving guidance will become even more accessible and reliable. Consider adopting the latest smartphone RTK technology and experience the convenience and benefits LRTK can bring to your sites. Efficient pile-driving construction with cm level accuracy (half-inch accuracy) is sure to become the new standard for future construction sites.


FAQ

Q. How can a smartphone achieve centimeter-level positioning? A. A smartphone’s built-in GPS has errors on the order of several meters (several feet), but using the RTK method enables centimeter-level accuracy. Specifically, a high-precision GNSS receiver connected to the smartphone obtains positioning data and compares it with correction information received from a base station over the internet. This corrects even small satellite signal errors and computes high-precision positions in real time. In short, combining a dedicated small GNSS sensor with correction data allows an ordinary smartphone to be used as a high-precision surveying instrument.


Q. What equipment and environment are required for introduction? A. Basically, you need a high-precision GNSS receiver (RTK-capable rover) and a smartphone or tablet. The GNSS receiver can be attached directly to the smartphone or mounted on a survey pole. To obtain centimeter-level accuracy (inch-level accuracy), you must receive correction information from a base station in real time, so provide an internet connection environment. This can be done by using commercial Ntrip services (which distribute base station data over the network) or by setting up your own base-station receiver at a known point and transmitting correction data wirelessly. In addition, install a dedicated guidance application (surveying app) on the smartphone and load construction drawings and coordinate lists. In short, have "RTK-capable GNSS receiver + smartphone (app) + communications environment (correction data)" ready.


Q. Can it be used without specialized knowledge or experience? A. Yes, basic operations are designed to be intuitive for anyone. You simply move following the arrows and distance information displayed on the smartphone screen, so you can be guided to the specified coordinates without advanced surveying knowledge. Understanding RTK principles and positioning mechanisms is desirable, but current smartphone RTK apps are very user-friendly, and new staff can operate them after short training. On site, anyone can easily perform surveying and pile-setting, reducing errors caused by lack of experience.


Q. Are there cost benefits compared to conventional surveying equipment? A. Yes. Initial equipment costs differ significantly. Equipping a set of conventional surveying instruments such as a total station requires a large investment, whereas smartphone RTK can be implemented relatively affordably by combining an ordinary smartphone with a comparatively inexpensive GNSS receiver. Since tasks that previously needed two or more people can be done by one person, it reduces labor and outsourcing surveying costs. Considering time savings as well, the overall cost performance of smartphone RTK is very high.


Q. Can GNSS-based pile-driving guidance be used at any site? A. Basically, it is most effective in outdoor sites where the sky is open and GNSS satellite signals can be received. Conversely, it is difficult to use RTK positioning in tunnels, indoors, or areas surrounded by tall buildings or mountains where satellite signals are blocked. In such places, conventional optical surveying instruments or other positioning technologies may still be necessary. Also, when using network RTK (Ntrip services, etc.), mobile phone reception is required. However, even in mountainous areas with unstable communications, operation is possible by setting up your own mobile base station (a portable base station and radio communication unit). Thus, GNSS-based systems can be used at most outdoor construction sites, but consider combining them with conventional methods according to site conditions.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.