top of page

8 Examples of Using the Geospatial Information Authority of Japan Heat Map for Disaster Management

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

In disaster response, it is crucial how quickly and how intuitively responders can grasp information that is difficult to assess from maps alone. Especially in situations where complex risks such as heavy rainfall, flooding, landslides, earthquakes, and road disruptions overlap, there are limits to tracking conditions using only numbers and lists. Accordingly, attention is turning to the use of heat maps that visualize hazard levels, concentrations, and extents of impact with color gradients based on topography, elevation, and map data provided by the Geospatial Information Authority of Japan.


A heat map is not just a technique that makes things easy to see. It is a practical tool for quickly organizing where risks are concentrated, which areas should be prioritized for inspection, evacuation guidance, and information gathering, and where personnel and equipment should be allocated. By combining it with maps and elevation data from the Geospatial Information Authority of Japan, on-site decision-making can move beyond a flat plan view and more readily lead to judgments that take terrain conditions into account.


However, heat maps are not a panacea. Darker-colored areas are not necessarily the only dangerous spots, and if you choose the wrong types of data or layer them improperly, the visualization can become detached from reality. That is precisely why, when using them for disaster countermeasures, you need to be clear about what your objective is, which data to use, and how to visualize it. This article, aimed at practitioners searching for "heat map Geospatial Information Authority of Japan", organizes eight representative use cases useful for disaster response and explains them clearly, including the concepts and operational tips you should keep in mind when implementing them.


Table of Contents

• Why the Geospatial Information Authority of Japan's Heat Maps Are Emphasized in Disaster Management

• What to Know About the Geospatial Information Authority of Japan Heat Map Before Using It

• Use case 1 Prioritizing high-risk locations for landslide disasters

• Use case 2 Visualizing inundation risk and biases in evacuation behavior

• Use Case 3 Streamlining patrol planning around rivers

• Use case 4 Consider alternative routes when roads are cut off

• Use Case 5: Grasping the spatial extent of impacts on critical facilities

• Use Case 6: Narrowing down candidate locations for supply hubs and temporary storage sites during disasters

• Use Case 7: Make it easier to share damage survey results among stakeholders

• Use Case 8 Determining priority construction areas in the recovery and reconstruction phase

• Considerations when using heat maps for disaster management

• Summary


Why the Geospatial Information Authority of Japan (GSI) Heat Maps Are Emphasized in Disaster Response

In disaster response, simply possessing map information is not enough. What matters is converting it into a form that allows the information needed for decisions to be read quickly within a limited time. The Geospatial Information Authority of Japan’s map data has a major strength in that it includes the basic information required for disaster response—terrain, elevation, map features, roads, and water systems. By using these as a foundation to create heat maps, trends that are hard to capture with points or lines become easier to grasp as continuous areas.


For example, individually checking the distribution of steep slopes, areas with large elevation differences, low-lying areas along rivers, communities far from shelters, or road sections where closures have a significant impact takes time. However, a heat map makes it possible to see at a glance where hazards are concentrated and where impacts are uneven, making it easier to decide the order of on-site checks and patrols. Especially in large-scale disasters, it is not realistic to treat everything with the same priority. That is why a two-step approach—first scanning the whole area by intensity, then examining the details—is effective.


Furthermore, heat maps help build a common understanding not only among specialists but also among stakeholders with different roles, such as local governments, construction management, maintenance and inspection personnel, and regional disaster prevention staff. Even if coordinate values and elevation figures themselves are technical, color distributions are intuitively easy to understand, making them easy to use in meetings and during initial response decision-making. The value of the Geospatial Information Authority of Japan’s heat maps in disaster response lies not only in precise analysis but also in their ability to create decision-making materials that are easy to share in the field.


Basics of the Geospatial Information Authority of Japan (GSI) Heat Map to Know Before Using It

Before using the Geospatial Information Authority of Japan heat maps for disaster response, the first thing to understand is that a heat map is nothing more than the original data represented as colors. In other words, what you see changes greatly depending on which data you use. Whether you base it on elevation, emphasize slope, overlay past damage history, or add population and facility distributions, the results can differ even for the same area.


An especially important point in disaster management is not to treat topographic conditions and social conditions separately. For example, the fact that an area is low-lying helps in assessing flood risk, but that alone does not allow you to determine the likely scale of actual damage. Only when you overlay conditions—such as whether residential areas are densely populated, whether there are facilities for the elderly, and whether routes to evacuation shelters are secured—do high-priority areas for countermeasures become clear.


Also, the appearance of a heat map can change dramatically depending on its color settings. If you choose settings that emphasize even very small differences, hazards can appear to be too widespread; conversely, if you make the range too broad, differences that should be noted will be obscured. When using heat maps for disaster response, prioritize interpretability over aesthetics, and use color schemes and threshold settings that clearly define what is considered high risk.


Furthermore, when used in the field, it is important to operate heat maps on the assumption that they will be combined with on-site inspections rather than relied on alone. Areas that appear darker on the map are not necessarily dangerous in their current state, and conversely, even where the color is lighter there may be factors—such as structural deterioration or poor drainage—that can only be identified on site. A heat map should not be used as a substitute for on-site inspection but as an entry point to make on-site inspections more efficient.


Use Case 1 Prioritizing high-risk locations for landslides

One of the clearest uses in disaster management is using a heatmap to prioritize landslide hazard locations. In mountainous and valley areas, steep slopes and collapse-prone terrain are scattered, and even if you have a list of hazard sites, deciding the order of patrols and monitoring is not easy. By combining elevation difference, slope, valley topography, past collapse history, and proximity to roads and settlements into a heatmap, it becomes much easier to see where monitoring should be prioritized.


What is particularly effective is to evaluate not by simply emphasizing steep slopes, but by taking into account the magnitude of their impact on people and roads. For example, even with the same gradient, a slope located behind houses and a slope deep within a sparsely visited forest will have different priorities for countermeasures. A heat map can represent this difference by overlaying terrain information with data on inhabited areas. As a result, you can create gradations not only in hazard level but also in the urgency or necessity of response.


Under normal conditions, it can be used to identify priority monitoring areas and to develop inspection plans, and during rainfall it helps determine which areas to prioritize for patrols by cross-referencing rainfall and warning information. After a disaster, narrowing down areas with a high risk of secondary disasters also helps ensure safety during emergency response. In landslide disasters, because there are often too many hazardous locations to inspect at the same density, prioritization using heat maps is a highly effective approach in practice.


Use Case 2 Visualizing Biases in Flood Risk and Evacuation Behavior

For flood inundation measures, the Geospatial Information Authority of Japan heat map is a very well-suited method. Low-lying areas, riverbanks, and landforms prone to inland water accumulation are easy to grasp spatially based on elevation data and terrain representations, and by visualizing expected inundation depths and where water is likely to gather, it can help revise evacuation plans. In particular, on plains where residential areas spread, slight differences in elevation affect flooding conditions, so differences that are hard to discern from contour lines alone become intuitively easier to read with a heat map.


What's important here is not only to show areas prone to flooding but also to assess how difficult evacuation would be. For example, overlaying distance to shelters, slopes of main roads, locations of bridges, and surrounding population density can reveal areas that should be prioritized for evacuation assistance apart from simple flood hazard zones. Even where the terrain is relatively safe, the importance of pre-emptive measures increases in regions with many elderly residents who take longer to move or in districts with limited evacuation routes.


Also, considering the practical work after issuing evacuation information, heat maps are useful for resident briefings and internal coordination. By using colors to show flooding trends that are hard to convey with numbers alone, it becomes easier to explain which roads are likely to become unusable first and which areas will need mobility support. Visualizing flood risk is valuable not only when developing disaster prevention plans but also for promoting residents’ understanding and designing training.


Use Case 3: Streamline patrol planning around rivers

During heavy rain or when a typhoon is approaching, patrols and monitoring around rivers become important, but the sections to be covered are often long and must be handled with limited personnel. In such cases, combining the Geospatial Information Authority of Japan's map information with heat maps makes it easier to determine priorities for where to patrol. By spatially highlighting river bends, sections adjacent to low-lying land, locations where populations or critical facilities are concentrated behind levees, and areas that have previously experienced overtopping or inland flooding, you can vary the density of patrols.


The advantage of this approach is that you can assess not only the river itself but also the surrounding area that could be affected. For example, even with the same rise in water level, the extent of damage varies depending on the land-use situation behind the river. Sections dominated by farmland require different precautions than sections where residential areas, hospitals, or government offices are nearby. By presenting the information as a heat map, it becomes easier to expand decision-making from a narrow river-management perspective to an overall community disaster-prevention perspective.


Another aspect that should not be overlooked is how well it pairs with recording patrol results. By storing the results of checks for hazard indicators, slope abnormalities, blockages in drainage facilities, and occurrences of roadway flooding together with location information, and then converting them into heat maps, you can improve the accuracy of subsequent patrol planning. Patrols tend to be one-off responses, but by shifting operations to accumulate and visualize location information, experience is preserved as an organizational decision-making asset.


Use Case 4 Considering alternative routes when roads are cut off

During disasters, not only damage to the roads themselves but also the concentration of traffic onto limited passable routes can greatly reduce the efficiency of movement over wide areas. In particular, in mountainous and coastal areas, the closure of a single road can isolate communities and delay the transport of supplies. The Geospatial Information Authority of Japan’s heat map is useful for understanding such roadway disruption risks and for examining alternative routes.


Specifically, we extract sections along steep slopes, sections with many embankments and cuttings, areas immediately before and after bridges and tunnels, low-lying roads prone to flooding, and sections with few detour options, and visualize, using colors, the extent of the impact in the event of a disruption. Doing so reveals not only the locations that are themselves likely to suffer damage but also areas that have low alternatives if those locations become unusable. This is a critically important perspective for disaster prevention, because places that are vulnerable to damage and places whose interruption would cause serious problems do not necessarily coincide.


In pre-disaster measures, it can be used to plan the placement of emergency recovery supplies, traffic restriction plans, and to organize what information should be communicated to the community. After an incident, it becomes a basis for deciding which routes should be prioritized for clearance and where to deploy heavy machinery and survey teams first. Furthermore, by overlaying critical movement routes by use—access to shelters, emergency medical transport, delivery of daily necessities—you can decide priority routes not merely from the perspective of road management but from the standpoint of maintaining community functions. Measures against road severance may appear to be line management, but in reality require consideration of area-wide impacts, and heat maps are effective for organizing that.


Use Case 5: Understanding the spatial extent of impacts on critical facilities

The targets that must be protected in a disaster are not limited to homes. Government offices, evacuation shelters, schools, medical facilities, welfare facilities, water supply facilities, telecommunications facilities, and other critical facilities that support regional functions—quickly understanding the impacts on these facilities can determine the success or failure of the initial response. The Geospatial Information Authority of Japan’s heat map proves valuable when evaluating such groups of facilities not as points but spatially, including surrounding conditions.


For example, a shelter located in low-lying land prone to flooding may be difficult to use in practice even if it has been officially designated. Also, even if the facility itself is safe, the risk to continued functionality increases if connecting roads are prone to inundation, surrounding slopes are at risk of landslides, or conditions tend to concentrate users. Heat maps can layer multiple risks around a facility location, enabling assessment of operational danger beyond a simple site-level evaluation.


This approach is particularly effective for reviewing plans under normal conditions. It brings concreteness to facility disaster-prevention decisions such as reassessing designated evacuation shelters, organizing candidate alternative bases, selecting facilities that should be prioritized for disaster-hardening, and pre-positioning emergency supplies. After a disaster, it also informs decisions about which facilities to inspect first and where to send advance support. Facilities are point information, but disaster impacts need to be understood as areal information that includes surrounding topography and movement routes; being able to adopt that perspective is a major advantage of using heatmaps.


Use Case 6: Narrowing down candidate locations for supply hubs and temporary storage during disasters

During disasters, it is necessary to secure temporary bases such as staging areas for relief supplies and temporary storage sites for disaster debris in a short time. However, in practice, if candidate sites are chosen based on area alone, problems often surface later—weak access routes, surrounding areas prone to flooding, large impacts on nearby residences, or poor ground conditions. Therefore, it is important to use the Geospatial Information Authority of Japan heat map to visualize terrain and access conditions from the candidate screening stage.


When selecting candidate sites, we comprehensively consider flatness, elevation, the surrounding road network, distance from rivers, proximity to densely populated residential areas, and landslide risk. By creating a heat map, it becomes easier to compare usability that includes the surrounding environment rather than focusing only on the site itself. For example, even if the area is sufficient, if there is only a single connecting road and the location is prone to flooding, it is unreliable as a hub during disasters. Conversely, even if a site is somewhat distant from urban areas, it can be a strong candidate if it is easy to deliver to, is at higher elevation, and has minimal impact on the surrounding area.


This method is also useful when preparing multiple candidate sites during peacetime. Instead of searching from scratch after a disaster, having a list of candidate sites organized by conditions on a heat map allows you to quickly choose according to the situation. Both supply bases and temporary storage sites are areas where decisions made in haste after a disaster are likely to fail. Heat maps that utilize terrain information from the Geospatial Information Authority of Japan provide a means to improve the quality of that prior preparation.


Use Case 7 Making it easier to share damage assessment results among stakeholders

After a disaster, damage surveys gather a large amount of information from the field. However, when photos, notes, location data, road passability, and the status of emergency measures are scattered separately, it becomes difficult to grasp the overall picture. In such cases, consolidating survey results on the Geospatial Information Authority of Japan's maps and visualizing damage concentration and unconfirmed areas as heat maps makes sharing among stakeholders much easier.


What is particularly effective is using it to visualize response priority and inspection density rather than the raw number of damage reports. For example, by color-coding areas where damage reports are concentrated, areas that have not yet been sufficiently investigated, and areas that need re-inspection, you can see what to do next. A major advantage is that stakeholders with different roles—field teams, internal coordination teams, construction teams, contractors, and so on—can look at the same map and make decisions.


Also, damage survey information should not be left as mere records; it needs to be connected to future disaster prevention and recovery plans. By accumulating survey results with location information and making them comparable as heat maps by time period and by disaster type, you can identify areas and trends that are more prone to damage. This also helps in designating future priority intervention zones and in prioritizing facility upgrades, drainage improvements, and slope countermeasures. Returning damage surveys to the map and understanding them as geographic areas is an important step toward moving from one-off responses to continuous improvement in disaster prevention.


Use Case 8 Determining Priority Construction Areas in the Recovery and Reconstruction Phase

Disaster management does not end with the immediate initial response after an event. In practice, it becomes even more difficult during the subsequent recovery and reconstruction phase to decide where to start. With limited budgets and personnel, when restoration targets such as roads, slopes, drainage, rivers, and public facilities overlap, it is difficult to determine the order based solely on individual requests. Here too, the Geospatial Information Authority of Japan heat map is useful.


In the recovery phase, priorities must be determined by looking comprehensively not only at the extent of damage but also at impacts on daily life, traffic effects, the risk of further damage, and the relationship with nearby facilities. For example, even with similar levels of damage, sections that include school routes or local roads, access routes to critical facilities, or locations where additional heavy rain is expected to enlarge damage are given higher priority. By overlaying these conditions on a heat map, practical priority repair areas that are not visible from simple damage amounts become apparent.


Also, by reflecting statuses such as not started, in progress, emergency measures completed, and final restoration completed on a map as restoration work progresses, it can be used as a shared progress-management document. In meetings with relevant departments and community briefings, this makes it easy to intuitively show which areas are at which stage, facilitating coordination. Because post-disaster recovery tends to be a long-term effort, a mechanism that allows decision criteria to be shared on a map is important. Heat maps are a practical visualization method that can be used not only for the initial response but also for mid- to long-term recovery planning.


Precautions When Using Heat Maps in Disaster Management

So far we've looked at examples of application, but when using heat maps for disaster preparedness there are several points to be aware of. First, the intensity of the color does not necessarily mean that a danger is confirmed. Heat maps are, at best, a relative evaluation based on the conditions set. If the source data is old, updates are delayed, or on-the-ground changes are not reflected, there can be discrepancies with the actual situation.


Second, while overlaying multiple datasets is convenient, it carries the risk of making the evaluation axes unclear. If you combine slope, elevation, population, facility distribution, past damage, and so on all at once, the map may look easy to interpret, but it can be hard to explain what is causing certain areas to appear more intense. When using these maps for disaster response, it is important to narrow the evaluation axes according to each intended use. Preparing separate heat maps for different purposes—evacuation planning, patrol planning, prioritizing recovery, etc.—will make them easier to use on the ground.


Third, be aware that appearance changes with scale. Trends that were effective in wide-area displays can be too coarse at the field scale, and conversely, making things too detailed for on-site use can make them unsuitable for wide-area decision-making. In disaster response, it is practical to treat overview use and on-site operational use separately.


And finally, an important point is not to let a heat map remain a desk-based judgment. Once you have narrowed down candidate danger spots and priority areas on the map, you must ultimately confirm them with on-site verification. A map is a tool to speed up decision-making, not a substitute for on-the-ground checks. By following this order, the heat map becomes a strong ally in disaster countermeasures.


Summary

Heat maps that utilize map information from the Geospatial Information Authority of Japan are a practical method that supports situational awareness, prioritization, and information sharing among stakeholders in disaster management. Their range of use is very broad—from monitoring landslide hazards, assessing inundation risk, river patrols, and measures against road severance, to evaluating impacts on critical facilities, selecting candidate sites for supply hubs and temporary storage, sharing damage survey results, and determining priority construction for recovery and reconstruction—and they are consistently useful from preparedness in normal times through post-disaster response.


However, while heat maps are easy to read, they are tools whose interpretation can change depending on the settings. That is why it is essential to organize the data used according to the purpose, clearly define the meaning of the colors, and use them in combination with on-site verification. In disaster response, what truly matters is not creating a pretty diagram, but making a map that enables you to decide what to do next.


Once you've identified danger levels and priorities on a map, it becomes important to quickly confirm those locations in the field and accurately record the necessary points. GNSS high-precision positioning devices like LRTK, which can be attached to and used with a smartphone, are effective for this. If you can head directly to the priority locations identified by a heat map and efficiently carry out coordinate checks and simple surveys, both initial disaster response and recovery decision-making become easier. View the whole area on a map and verify it accurately on site — as a means to connect that workflow in practical operations, LRTK is a well-suited option for disaster response.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page