top of page

Table of Contents

• Challenges in onsite safety management and helmet location information

• Effect 1: Dramatic improvement in safety

• Effect 2: Improved work efficiency and productivity

• Effect 3: Advanced site management (data utilization and DX)

• Use of LRTK for simple surveying

• FAQ


Challenges in onsite safety management and helmet location information

On jobsites with many workers, such as construction and civil engineering sites, ensuring safety is the top priority. However, when personnel are scattered across a vast work area, it is not easy to know in real time who is working where. Traditional patrols and radio communications cannot cover everyone, so blind spots inevitably occur.


If an accident or disaster occurs under such conditions, delays in response can increase the extent of damage. For example, even if you want to evacuate all workers quickly in an emergency, it will take time to rescue or perform roll call if you cannot determine each person’s location. Even in daily operations, supervisors often waste time repeatedly calling workers over radios or phones or running around a large site to find people. Not being able to view the entire site at once is a major issue both for safety management and operational efficiency.


A promising solution to these problems is the use of “helmet location information.” By attaching position-transmitting devices (GPS-equipped smartphones or dedicated tags) to workers’ helmets, detecting them with receivers installed around the site, and analyzing the data in a cloud system, each worker’s current position is automatically displayed on a digital map. Outdoors, GPS or satellite positioning is used, and in areas where satellite signals cannot reach—such as tunnels or indoors—technologies like BLE beacons or UWB (ultra-wideband) radio can supplement, enabling real-time positioning both indoors and outdoors. Managers can build a system where they can instantly see who is where on a computer or tablet screen, providing the reassurance of “watching over everyone on site.”


Below we will look in detail at three specific effects that real-time location information from helmets can bring to the jobsite.


Effect 1: Dramatic improvement in safety

The primary purpose of using helmet location information is to significantly improve site safety. By monitoring and recording each worker’s location in real time, previously unseen hazards become visible, contributing to accident prevention and enhanced emergency response capabilities. Key safety benefits include:


• Preventing entry into hazardous areas: If no-entry zones or hazardous spots are preconfigured on the map, the system can automatically trigger an alarm or send a warning notification to the helmet device when a worker approaches those areas by mistake. It can also detect and alarm when an unqualified worker approaches areas restricted to certified personnel, preventing intrusion accidents caused by human error.

• Rapid rescue in emergencies: If the system detects a worker’s fall, a fall from height, or that someone has been immobile for a certain period, it immediately sends an abnormality alert to managers. Even if an accident or disaster occurs, real-time tracking allows managers to instantly know “who has not yet evacuated” and “where someone is being left behind,” enabling prompt rescue and evacuation guidance. Even from a remote office, managers can understand site conditions and issue appropriate instructions, ensuring comprehensive safety checks even on large sites.

• Strengthening safety measures based on data: Analyzing accumulated location logs collected daily helps continuously improve safety management. Reviewing each worker’s movement history makes it possible to identify locations with frequent near-misses (hi-yari-hatto) or areas where hazards are likely to occur. Based on that information, safety training can be enhanced and layouts revised, further preventing accidents.


By fully utilizing the location information obtainable from helmets, you can dramatically raise the safety level on site. Managers can maintain a state of being able to watch over everyone at all times, and workers can operate in a more secure environment.


Effect 2: Improved work efficiency and productivity

Real-time awareness of helmet location information is not only powerful for safety but also greatly enhances work efficiency. When you can view the site’s movements digitally, waste in personnel deployment and communications is reduced, leading to higher productivity. Specific efficiency gains include:


• Optimized personnel deployment: Even remote supervisors can see all workers’ movements in real time on a screen. This makes it easy to spot at a glance situations like “too many people are concentrated in one area while others are idle” or “there are not enough people at a critical work spot,” allowing rapid redeployment or reinforcement from other areas. Instant, appropriate personnel placement enables smooth work progress without waste.

• Streamlined roll calls and communications: Whether at break time or the end of the day, you can instantly confirm on the map whether everyone has returned to the designated assembly area. This eliminates the need to walk around a large site to call roll or repeatedly call individuals over radio. For emergency notices or announcements, sending a mass message via the system notifies everyone simultaneously, removing the need for repeated individual contacts. Eliminating time spent searching for people or communicating means workers can focus on their tasks, improving overall site productivity.

• Improving work processes: Analyzing accumulated location data can reveal inefficiencies in procedures and movement patterns. Data can show trends such as which times and places are frequently congested or whether there are excessive back-and-forth trips between material storage and work areas. Based on these insights, changing layouts or reorganizing material placement reduces travel-related losses and further improves site efficiency.


Real-time location information improves both the speed and quality of decision-making by site managers. Reducing unnecessary movements and waiting times and quickly assigning the right personnel to the right place enables site operations to achieve maximum results within limited time and resources.


Effect 3: Advanced site management (data utilization and DX)

Using helmet location information has the potential not only to improve safety and efficiency but also to evolve how site management itself is conducted. Visualizing the real-time movements of people and things and integrating that data directly supports on-site DX (digital transformation). Finally, let’s look at how location information raises the level of site management.


• Centralized management of multiple teams and processes: Construction sites often involve multiple subcontractors and trades, but sharing and visualizing everyone’s location information facilitates collaboration across departments and contractors. Site supervisors can remotely grasp each team’s placement and work progress from the office and rapidly deploy reinforcements or coordinate with other departments as needed. This enables effective control over large projects and smoother overall schedule management.

• Integrated safety management for people and heavy equipment: On sites with cranes and heavy machinery, constantly monitoring the positional relationship between workers and machines provides great reassurance. A real-time position management system can alarm when a person and heavy equipment come within a certain proximity, helping prevent contact accidents. Before high-altitude or crane operations, managers can instantly confirm on the screen that no workers remain in the danger zone, ensuring thorough safety measures for heavy equipment operations.

• Tracking of materials and vehicles: The system can be applied not only to people but also to material pallets, tools, and vehicles for managing the location of things. If tags are attached like those on helmets, you can quickly search for needed materials on site, reducing time spent searching. Monitoring heavy equipment movement data can also help identify machines that idle for long periods and consider reducing the number of units, contributing to more efficient equipment utilization. Visualizing both people and things in real time brings major benefits for optimizing the entire site.

• Accelerating onsite DX: Using helmet location information aligns with initiatives such as i-Construction promoted by the Ministry of Land, Infrastructure, Transport and Tourism. Replacing paper-based and manpower-dependent site management with digital data makes it easier to discover previously unnoticed issues and enables evidence-based decision-making. Integrating real-time site data with other systems can automate daily reports and streamline attendance management, leading to further operational improvements. Helmet location information can be seen as a key that, starting from safety management, transforms how work on site is done.


As described above, leveraging location information obtained from helmets produces multifaceted effects. Beyond simply watching over workers, accumulating and analyzing data on people, materials, and processes enables a safer, leaner, and more sophisticated site operation. It is truly accurate to say, “Helmet location information transforms the jobsite.”


Use of LRTK for simple surveying

Finally, we introduce simple surveying using a tool called LRTK. When building a real-time position management system that uses helmet location information, it is essential not only to install sensors but also to obtain accurate coordinate data for site buildings and reference points. For example, if you install multiple BLE beacons or UWB antennas for indoor positioning, measuring and registering the coordinates of their installation locations in advance allows worker positions to be displayed on the digital map with higher accuracy. However, traditional surveying requires specialized technicians and expensive equipment, which adds time and cost to preparations.


LRTK is a modern solution that makes this surveying work easy for anyone. Using an ultra-compact RTK-GNSS receiver that can be attached to a smartphone, it enables centimeter-class high-precision positioning. With LRTK, a site person can simply walk around carrying a smartphone to quickly obtain and record the coordinates of reference points and sensor installation locations, making high-precision site surveying possible without hiring a specialist. For example, if you use LRTK to rapidly measure and register the exact coordinates of many beacons installed for an indoor positioning system, the subsequent tracking accuracy of workers will be greatly improved. When remeasuring dimensions or shapes inside existing buildings during renovation work, LRTK can 3D-scan the current state and digitize it, aiding fast and accurate construction planning.


By utilizing such simple surveying tools, you can smoothly carry out the preparatory work for implementing a real-time position management system and flexibly handle precision management and additional measurements after deployment. Actively adopting cutting-edge technology further accelerates the path to onsite DX. The LRTK series, in particular, achieves high precision while being operable with just a smartphone, greatly contributing to reducing surveying time and improving productivity. It is also a solution compatible with the Ministry of Land, Infrastructure, Transport and Tourism’s i-Construction initiative, strongly supporting digitalization in the construction industry. If you are interested, please also visit the [LRTK official site](https://www.lrtk.lefixea.com) to check specific product information and use cases. Let LRTK take your site to the next stage.


FAQ

Q1. How accurate is a helmet location information system? A. Accuracy depends on the technology used. Outdoors, using GPS or cellular networks typically results in errors of several meters (several ft), but combining with RTK (real-time kinematic) correction information can improve accuracy to the order of several centimeters (several in). Indoors, BLE beacons typically achieve accuracy within a radius of several meters (several ft), while UWB can achieve accuracy within tens of centimeters (a few in). Choose the positioning technology that best fits the site’s needs (required accuracy and coverage area).


Q2. How much does system implementation cost? A. Costs vary widely depending on site size and the equipment configuration chosen. A small system using existing smartphones and inexpensive BLE beacons can be started at relatively low cost, whereas a system that installs many high-precision UWB antennas to cover a large plant will require a corresponding investment. However, with the spread of IoT devices, sensor costs have been declining, and considering the benefits from improved safety, the investment is often justified. Consider starting with a small pilot implementation and expanding gradually.


Q3. Will this invade workers’ privacy? A. With appropriate operational measures, privacy impact can be minimized. The key is to restrict location information strictly to safety management and operational efficiency purposes. Specifically, configure the system not to record activities outside working hours or during breaks, and limit access to collected data to administrators to prevent indiscriminate viewing of individual movement histories. It is also important to fully explain the system’s purpose and operating rules to employees before implementation and obtain their understanding and consent. If workers understand that the system exists to protect everyone’s safety, they will generally cooperate without concern.


Q4. Can sites with many older workers unfamiliar with IT use this system? A. Yes. In a real-time location information system, what workers need to do is simply wear a position-transmitting tag or carry a compatible smartphone. No special operations are required; data collection and display are fully automated. Therefore, even workers who are not good with machines can use the system without burden, and informing them that “this is to protect everyone’s safety, so please carry it” usually results in broad acceptance.


Q5. Can you track not only people but also materials and heavy equipment? A. Yes. As with workers, you can attach position-transmitting tags to material pallets, toolboxes, and heavy equipment to track their locations in real time. You can quickly search where needed materials are on site, reducing time spent searching, and for heavy equipment, monitoring position data helps discover long idling times so you can consider optimizing the number of machines. Managing not just people’s movements but also the movement of things provides a major advantage for advancing onsite DX.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page