How to Use PVSyst in Proposal Work|6 Steps for Handling Projects
By LRTK Team (Lefixea Inc.)
Table of Contents
• Why use PVSyst in proposal work
• Step 1: Organize project conditions and proposal objectives
• Step 2: Align site conditions and design assumptions
• Step 3: Create a base model and estimate power generation
• Step 4: Adjust shading, losses, and equipment conditions to improve proposal accuracy
• Step 5: Interpret results and incorporate them into proposal materials
• Step 6: Create comparative proposals while responding to changes in conditions
• Points to note when using PVSyst in proposal work
• Site verification and positioning accuracy determine proposal quality
• Summary
Why Use PVSyst in Proposal Work
In proposals for solar power generation systems, it is not sufficient to simply say “how much power it is likely to generate.” What customers want to know is how much generation can be expected given the planned site conditions, whether the system capacity is appropriate, how much impact shading and losses will have, and whether there is evidence that can be used for investment decisions. PVSyst is solar power generation simulation software used to quantify and organize these considerations numerically at the proposal stage.
Many practitioners who search for "How to use PVSyst" want to know not only explanations of the interface screens but also the sequence in which they should use it in actual project work. In proposal work, you are often asked for rough estimates at a stage when the design drawings are not yet finalized, and clients may suddenly request changes to the conditions. For example, there are situations where you must compare multiple patterns in a short time—such as increasing the number of modules, changing the azimuth, adding a storage battery, or changing the racking pitch.
What's important here is not to build a perfect, fully detailed model from the outset. Depending on the purpose of the proposal, decide how much detail to enter and create the model in a way that makes it easy to revise conditions later. Because PVSyst is highly capable, it offers many input fields, and beginners can easily be unsure where to start. However, if you use it according to the workflow for handling projects, it becomes a powerful tool for organizing the rationale behind proposals and strengthening your ability to explain them to clients.
This article explains the workflow for using PVSyst in proposal work in six steps. The intended readers are practitioners involved in the design, sales engineering, proposal preparation, equipment planning, and on-site surveys for solar power generation. The content is organized from a practical perspective, covering not only detailed button operations in PVSyst but also what to check during the proposal process, the order in which to build the model, and how to reflect the results in explanatory materials.
Step 1: Organize project requirements and proposal objectives
Before opening PVSyst, it is important to first organize the project conditions and the objective of the proposal. A common failure in proposal work is realizing after starting the simulation that required inputs are missing and having to re-enter data repeatedly. While PVSyst allows for detailed analysis, if you proceed with vague assumptions the output will also be vague. Therefore, you need to clarify from the outset "what you want to demonstrate with this proposal."
There are several types of proposal objectives. For an initial proposal for a new project, the goal is to indicate the estimated capacity, annual energy production, installability, and a rough equipment configuration. For a proposal prior to detailed design, comparisons that reflect array configuration, azimuth, tilt angle, shading effects, and loss conditions are required. For proposals to expand or retrofit existing equipment, compatibility with existing conditions, constraints on installation space, and the relationship with existing wiring and connection conditions must also be verified.
The metrics customers prioritize also vary by project. Some projects emphasize energy production, while others prioritize installed capacity and area efficiency at the initial proposal stage. For self-consumption projects, not only energy production but also matching with the load, the amount of surplus energy, and explanations of the effect on purchased electricity reduction are required. For projects that assume grid interconnection, connectable capacity and approaches to output control may become items for consideration. If you input data into PVSyst while the proposal’s objective remains unclear, the way to interpret the results will not be fixed, and your explanations to the customer will lack persuasiveness.
The conditions you should organize first are the project site, installation method, target building or site, assumed system capacity, module layout policy, power conditioner configuration, azimuth, tilt angle, racking conditions, how the power will be used, and the proposal submission deadline. It is fine if not everything has been finalized. It is important to manage confirmed values, assumed values, and unverified items separately. While making assumptions at the proposal stage is not itself a problem, you need to present them in a way that both internal parties and the client can understand that they are assumptions.
Also, decide up front on the model naming and version-control rules for models created in PVSyst, as this will make later comparison work easier. In proposal work, similar model names tend to multiply—initial proposals, revised proposals, capacity-change proposals, racking-change proposals, proposals reflecting shading, etc. If you lose track of which model corresponds to which proposal conditions, there is a risk of accidentally submitting results based on outdated conditions. Establish a naming convention that includes the project name, date, and the key points of the conditions, and simply keeping a change history can significantly reduce practical mistakes.
When it comes to using PVSyst, attention quickly turns to weather data and system settings, but in proposal work the most important task is organizing the conditions beforehand. PVSyst is a tool that produces results based on the assumptions entered, and the quality of those assumptions directly determines the quality of the proposal. To create a proposal that convinces the client, the first step is to clarify the questions the proposal must answer before operating the software.
Step 2: Align site conditions and design assumptions
Once the project conditions have been organized, next align the site conditions and design assumptions. In PVSyst, the planned site’s location information, meteorological conditions, the installation surface’s azimuth and tilt, nearby obstructions, and terrain conditions all affect the results. Even at the proposal stage, if site-condition checks are rough, discrepancies between simulation results and the actual design conditions are likely to occur.
The first thing to check is the location of the planned site. In solar power generation simulations, latitude, longitude, elevation, and meteorological conditions form the basis. Even a slight difference in location can change solar irradiance and temperature conditions. If the installation site within a large property is divided into multiple candidate locations, you need to decide which position to use as the representative point. For rooftop installations, confirm the building’s location; for ground-mounted installations, confirm the center or a representative point of the area where the array will be placed.
Next, we clarify the conditions of the installation surface. For roof installations, check roof pitch, orientation, roofing material, obstructions, parapets, equipment, and inspection walkways. For ground installations, check site shape, whether earthworks have been carried out, whether the site is sloped or flat, ground conditions, surrounding trees and buildings, fences, and adjacent structures. When modeling in PVSyst, you may not be able to reproduce everything as a complete 3D model, but it is important to separate elements that affect energy production from elements that should be explained in the proposal.
Azimuth and tilt angles have a significant impact on proposal outcomes. In proposal work, customers may make requests such as "I want to install as much as possible on this roof," "I want to make effective use of the site without insisting on a south-facing orientation," or "I want to increase generation in the morning and evening to match self-consumption." Being able to show the difference in generation when the azimuth or tilt is changed increases the persuasiveness of a proposal. In PVSyst, conditions can be set for each installation surface, so it can also be used for projects with multiple roof surfaces or projects considering east-west oriented layouts.
Selection of weather data is also important. In the proposal stage, general weather data are often used, but for proposals that are closer to long-term forecasts or financial decisions, you need to be able to explain the data’s source and representativeness. Because differences in weather data can change annual power generation, it is reassuring to clearly state which assumptions the results presented to the client are based on.
Also, the task of linking the information obtained from on-site surveys to the data entered into PVSyst is indispensable. When site photos, survey maps, layout plans, roof plans, elevation drawings, electrical drawings, equipment lists, etc. are available, verify the consistency of each piece of information. It is not uncommon for obstacles to appear in site photos but not be reflected in the drawings, for the orientation shown on drawings to differ from the actual orientation, or for roof pitch to vary between documents. If these inconsistencies are overlooked at the proposal stage, they can lead to significant rework in later stages.
The premise for entering data into PVSyst is that it does not completely replace the actual on-site conditions, but rather organizes those conditions for simulation purposes. Therefore, it is important to retain the rationale for input values. Record which source the azimuth was obtained from, whether the tilt angle is a drawing value or an on-site measured value, and whether obstruction heights are measured or estimated; doing so makes it easier to explain later if questions arise.
In proposal work, speed is required, but if you skimp too much on verifying on-site conditions, the simulation loses much of its meaning. To use PVSyst effectively, collecting accurate on-site condition data is as important as the data-entry work in the software.
Step 3: Create the basic model and estimate power generation
When site conditions and design assumptions are in place, create a basic model in PVSyst. The first model produced in proposal work is easier to handle if you treat it as a reference model for confirming the project's direction, rather than as a complete reproduction of the final design. With this reference model, it becomes easier to compare which elements affected energy production or losses when conditions are changed later.
In the basic model, you first set the project location and meteorological conditions, and then enter the system configuration. Modules, power conditioners, string configuration, mounting surface, tilt angle, azimuth, and other items are set in sequence, and the annual power generation is estimated. Because equipment is often not fully finalized at the proposal stage, a provisional model may be created using candidate equipment and standard specifications. In such cases, the provisional conditions are organized so they can be easily replaced later when the equipment is finalized.
In the initial estimate we want to confirm whether the predicted energy production is not excessively low relative to the system capacity, whether the string configuration is feasible, whether the voltage range and input conditions are acceptable, and whether there are any items that would cause large losses. In PVSyst, warnings may appear when input conditions are inconsistent or when particular combinations of equipment require attention. In proposal work, you should not ignore warnings and look only at the results; you need to check what each warning means and judge whether it affects the proposal.
What beginners should pay particular attention to is the relationship between system capacity and array configuration. Increasing the number of modules may seem to simply increase energy production, but you must consider the power conditioner's (inverter's) input range, the number of modules in series, the number in parallel, the concept of overloading (oversizing), and voltage changes due to temperature conditions. Because PVSyst's results are calculated based on the system configuration entered, if the configuration is not actually feasible, no matter how good the energy production looks, it cannot be used as a proposal.
When creating a baseline model, it’s important not to cram too many minor loss conditions in from the start. If you immediately fine-tune details such as shading, soiling, wiring, temperature, degradation, mismatches, or downtime rate, it becomes difficult to tell which conditions are influencing the results. Practically, first grasp the overall power generation under standard conditions, and then reflect project-specific losses afterward.
When checking the basic model results, we look not only at annual generation but also at monthly generation trends. The timing of peak generation and seasonal variations change depending on the region and the installation orientation. In proposals for self-consumption, whether generation aligns with months or times of day with high demand can be more important than the annual generation. When the proposal recipient is a factory, warehouse, store, or public facility, the explanatory focus is whether the electricity usage pattern and the generation pattern match.
After creating the baseline model, rather than submitting the results as-is, we recommend conducting an internal review. Check the input values, equipment configuration, orientation, tilt, capacity, losses, warnings, and the interpretation of the results, and remove any obvious input errors. Speed is important in proposal work, but a small input mistake in a PVSyst model can lead to a large difference in energy production. Ensuring the quality of the baseline model will make the subsequent creation of comparison scenarios more stable.
Step 4: Adjust Shadows, Losses, and Equipment Conditions to Improve Proposal Accuracy
Once you have confirmed the overall power generation with the basic model, next reflect project-specific conditions to improve the proposal’s accuracy. Important here are adjustments for shading, losses, and equipment conditions. At the proposal stage you may be uncertain about how finely to set these parameters, but in practice it is best to prioritize reflecting elements that affect customer decisions, elements that lead to design changes, and elements that require accountability.
The impact of shading is a particularly important consideration in solar power proposals. For rooftop installations, surrounding buildings, roof structures (penthouses), HVAC equipment, railings, parapets, chimneys, antennas, and so on are sources of shading. For ground-mounted installations, adjacent buildings, trees, slopes, mountains, fences, utility poles, and site grading affect shading. Presenting projected energy production without accurately evaluating shading can lead to the system producing less than expected during actual operation.
In PVSyst, you can model near-field shading and evaluate shading losses. However, at the proposal stage, on-site 3D information is often not fully available, so there are limits to the model’s accuracy. What’s important is to be clear about how much shading the model reflects. For example, a phased approach can be used: in the initial proposal, reflect only the major surrounding obstructions, and in the detailed proposal add obstacles based on on-site measurements and drawings.
Loss conditions also have a major impact on power generation. In PVSyst you can set various losses such as wiring losses, temperature losses, soiling losses, mismatch losses, equipment efficiency, degradation, and downtime rate. Beginners can be confused by the loss items, but the aim is not to configure every detail. The objective is to set reasonable values for the proposed conditions and be able to explain the rationale for them.
Wiring losses vary depending on cable length, current, voltage, cross-sectional area, and wiring route. In the proposal stage, if detailed wiring routes are not yet determined, approximate values may be used, but these should be reviewed once the wiring design is finalized in later stages. Temperature-related losses are influenced by the installation method and ventilation conditions; the way module temperature rises differs between installations placed close to the roof and those mounted on racks with adequate ventilation. Soiling losses are assessed differently depending on the regional environment, roof pitch, surrounding dust levels, bird damage, rainfall patterns, and cleaning schedule.
Mismatch losses and degradation rates are related to long-term energy production forecasts and quality explanations. In proposal work, customers may ask, "Which year does this figure assume?" or "How much will it decrease in the long term?" Whether you present only the first-year energy production or also show long-term averages and cumulative energy changes affects the settings in PVSyst and how you present materials. In long-term proposals, it is clearer to explain the first year, age-related degradation, and maintenance conditions separately.
Adjusting equipment conditions is also essential. Module specifications, the power conditioner’s capacity, number of inputs, efficiency, operating voltage range, and string configuration affect both the simulation results and the practical feasibility of the design. When comparing multiple equipment candidates at the proposal stage, you need to consider not only options with higher annual power generation but also constructability, maintainability, installation space, future replaceability, and compatibility with grid conditions.
One thing to be careful about here is not to make the losses unnaturally small just to make the simulation results look better. In proposal work, because higher power generation appears more attractive, there is a tendency to lean toward optimistic assumptions. However, if actual operation falls significantly short of those results, it will affect the trust relationship with the client. At the proposal stage, it is desirable to consider not only optimistic cases but also standard and conservative cases, and to be in a position to explain the risks.
PVSyst is software that, precisely because it allows detailed settings, tends to reflect the user's judgments in the results. Therefore, when adjusting shading, losses, and equipment conditions, it is important to manage together the rationale for the numbers, the range of assumptions, and the timing for review. Improving proposal accuracy does not mean simply computing generation more granularly, but arranging assumptions and explanations that the customer can accept.
Step 5: Interpret the results and incorporate them into the proposal materials
Once you run a simulation in PVSyst, the next step is to interpret the results and incorporate them into the proposal documents. In proposal work, simply handing the customer the PVSyst output as-is is often insufficient. You need to summarize the results according to the information the customer wants and explain them clearly together with the assumptions.
First, check the annual generation, installed capacity, generation efficiency, breakdown of losses, and monthly generation. Annual generation often becomes the central metric of a proposal, but judging by that alone can be misleading. Even with the same annual generation, generation patterns can differ — configurations that perform strongly in summer, configurations that tend to drop in winter, or configurations where generation is concentrated in the morning and evening. Especially for self-consumption proposals, alignment with demand can be more important than the annual total.
The loss breakdown is important information that helps when explaining to customers. If power generation is lower than expected, being able to explain which losses are large can point to directions for design improvements. If losses from shading are large, you can consider layout changes or excluding certain areas. If temperature-related losses are large, you may need to review the installation method or ventilation conditions. If wiring losses are large, there may be room to reconsider equipment placement and cable routing.
When incorporating PVSyst results into proposal materials, it is important to always include the underlying assumptions. Organizing details such as the project site, meteorological conditions, system capacity, azimuth, tilt angle, mounting method, main loss settings, and the extent of shading considered makes the figures easier to interpret. If you omit the assumptions and show only the energy production, it will be difficult to explain later why the numbers changed when conditions are altered.
In client-facing materials, it is also important not to overuse PVSyst jargon as-is. While sharing detailed output tables among practitioners is fine, for decision-makers you need to explain the meaning of the results in general terms. For example, when explaining the breakdown of losses, rather than simply listing item names, convert them into the meanings needed for decisions, such as "Due to the effect of surrounding obstructions, a portion of the annual energy production is assumed to be reduced" and "Wiring conditions are approximate and will be revisited at detailed design."
In proposal documents, it is also important not to overemphasize excessively detailed figures. PVSyst calculation results may show values to decimal places, but at the proposal stage there remains uncertainty in the underlying assumptions. Changes in site conditions, weather, construction, and operation can alter actual power generation. Therefore, in proposal materials it is more practical, rather than creating an impression of undue precision, to make clear that the numbers are estimates based on assumptions and to organize them in a form that can be used for comparison and decision-making.
Keeping detailed PVSyst outputs for internal use and preparing summarized materials for clients is also effective. Internal documents should record input conditions, warning messages, loss settings, equipment configuration, and change history. Client-facing materials should clearly present the proposal conditions, expected power generation, key design points, and items to be confirmed going forward. By separating materials in this way, you ensure both ease of explanation and a sound technical basis.
When reading results, it is also important not to overlook any anomalies. For example, if the energy yield is extremely high compared with similar projects in the same area, the monthly generation pattern looks unnatural, losses are almost non-existent, shadow losses are small even though there should be shading, or there is no clipping despite overloading, the input conditions may be incorrect. PVSyst is a useful tool, but instead of taking its outputs at face value, you should verify their plausibility from a practitioner’s perspective.
The value of PVSyst in proposal work is not simply producing calculation sheets. It lies in organizing the information necessary for a customer's decision-making, together with the assumptions, and converting it into a form usable for design changes and investment decisions. By mastering it through to interpreting results and preparing documentation, PVSyst becomes a practical tool that raises the quality of proposal work.
Step 6: Develop comparison proposals while adapting to changing conditions
In proposal work, a plan that has been created is not always adopted as-is. Clients often request changes such as "Can you increase the capacity a bit?", "I want to consider only part of the roof", "I want to see the case excluding areas with heavy shading", "What happens with a different tilt angle?", or "I want to switch to a plan that prioritizes self-consumption." Being able to respond quickly to such changes is also a major advantage of using PVSyst in proposal work.
When creating comparison proposals, duplicate the reference model, clearly indicate the changes, and then alter the conditions. If you overwrite the original model directly, you will no longer be able to compare it with the initial proposal later. In proposal work, because there are many situations where you need to explain the differences among multiple options, model version control is extremely important. Manage models using names that make it clear what was changed, such as capacity-change proposal, layout-change proposal, shadow-exclusion proposal, orientation-change proposal, and equipment-change proposal.
Items frequently examined in comparative proposals include installed capacity, module layout, azimuth angle, tilt angle, racking pitch, extent of shading, equipment configuration, and loss conditions. For example, a proposal to increase capacity may raise annual energy generation, but it can also increase the impact of shading and losses due to overloading. Tightening the racking pitch can increase installed capacity, while potentially increasing inter-row shading. Changing the azimuth not only affects annual energy generation but also alters the generation profile by time of day.
In such comparisons, it is important not simply to choose the option with the highest power generation, but to select the option that fits the proposal’s objectives. For projects that prioritize selling electricity, projects that prioritize self-consumption, projects that want to use roof area to the fullest, and projects that want to reduce initial design risk, the optimal option may differ. The PVSyst comparison results are material for determining the design policy, and the final decision also involves constructability, maintainability, safety, regulatory requirements, grid conditions, and the customer’s operational policy.
When presenting comparison options to a client, it is important to clarify the differences between each option. Organizing them by purpose—"Option 1: standard layout", "Option 2: maximize capacity", "Option 3: exclude areas with significant shading", "Option 4: orientation configured for self-consumption"—makes them easier to understand. Explaining not only the differences in power generation but also why those differences occur and which option is suited to which conditions will improve the quality of the proposal.
Additionally, in practice it is important to check the items with the greatest impact rather than redoing everything in detail every time conditions change. At the initial proposal stage, it may be sufficient to look only at differences in capacity and orientation. In the detailed proposal stage, you need to flesh out shading, losses, and equipment configuration. By separating the accuracy required for the proposal stage from that for the detailed design stage, you can appropriately control the amount of work time.
After creating the comparison scenarios, always verify the consistency of the results. Check whether any conditions you did not intend to change have been altered, whether the meteorological data are the same, whether loss conditions are aligned, and whether there are any inconsistencies in equipment settings. When comparing, it is important to keep all conditions except the items you changed as consistent as possible. If you compare while conditions are inconsistent, you will not be able to determine the cause of differences in power generation.
To master PVSyst in proposal work, you need to create models designed for comparison and revision rather than one-off calculations. If you structure them from the start to be easy to compare, you'll be better able to accommodate additional requests from clients. The ability to respond to changes in conditions contributes not only to proposal speed but also to client trust.
Points to Note When Using PVSyst for Proposal Work
PVSyst is extremely useful for proposal work, but if used incorrectly it can actually lead to misunderstandings. In particular, be careful not to treat simulation results as definitive values. PVSyst’s results are forecasts based on the input conditions. Actual power generation will vary due to weather, installation conditions, equipment unit variability, soiling, maintenance status, downtime, and changes in the surrounding environment. In proposal documents, you must clearly state that the figures are predictions based on the calculation assumptions.
Also, it is risky to proceed without leaving a record of the basis for input values. At the proposal stage, drawing values, on-site verification values, customer-provided information, and internal assumed values are mixed. If you do not manage which number is based on which source, you will not be able to judge when reviewing conditions later. In addition to the PVSyst model, organizing a separate list of input conditions and a change history makes it easier to prevent practical troubles.
Another common pitfall for beginners is becoming overly fixated on minor configuration items and losing sight of the overall purpose of the proposal. PVSyst has many input fields, but you do not need to set every one of them perfectly to make a proposal. Initial proposals, rough estimates, detailed proposals, and final designs require different levels of accuracy. It is important to determine, based on the proposal stage, which items should be treated as assumptions and which should be measured or set in detail.
On the other hand, downplaying important items is also problematic. In particular, azimuth, tilt angle, shading, system capacity, equipment configuration, and meteorological conditions have a major impact on the results. Presenting power generation estimates while leaving these ambiguous can lead to significant discrepancies later. Even when prioritizing proposal speed, you should at least confirm the items that have a large impact on power generation.
The internal review process is also important. If one person completes the PVSyst model alone, it becomes difficult to notice input mistakes or missing assumptions. Even having another colleague check the conditions, results, and presentation of the materials before submitting the proposal will improve quality. For large projects or proposals for important clients in particular, it is desirable that the model creator, the design engineer, and the sales representative each review it from their own perspectives.
When explaining to customers, showing only favorable numbers is not enough; presenting the associated risks and items to be confirmed going forward also builds trust. For example, explain that the current figures are estimates based on a preliminary layout and may change after detailed on-site surveying and verification of obstructions, that loss conditions will be reviewed once wiring routes are finalized, and that recalculations will be performed after equipment selection is finalized. By doing so, the meaning of the proposed values becomes clear and misunderstandings in later stages can be prevented.
PVSyst does not automatically guarantee the correctness of a proposal. Gathering the right assumptions, setting reasonable conditions, interpreting the results, and presenting them in a way that the client can understand are the responsibilities of the practitioner. The essence of using PVSyst is not just using the software’s functions, but being mindful of how to leverage it within the overall proposal process.
On-site verification and positioning accuracy determine proposal quality
The quality of on-site verification is critically important for improving the accuracy of proposals using PVSyst. No matter how carefully simulations are performed, if site conditions are not accurately reflected, the reliability of the proposal results will decline. In particular, site geometry, building locations, roof surface orientations, positions of obstructions, elevation differences, and the available installation area all have a major impact on energy yield and layout planning.
In proposal work, we may sometimes evaluate a site based solely on drawings and aerial photographs. However, drawings can be outdated, new equipment may have been added on site, or the surrounding environment may have changed. On rooftops, equipment and piping, inspection spaces, and handrails not shown on the drawings may be installed. For ground-mounted installations, trees, slopes, drainage channels, existing structures, and neighboring property boundaries can affect layout planning.
To accurately capture this kind of on-site information, records that include location information are effective, not just taking photographs. Being able to confirm later which photo was taken from which position on the site, which direction obstructions are in, and where the boundaries of the planned area lie makes it easier to proceed with modeling in PVSyst and creating proposal materials. If the site survey information is well organized, internal sharing and explanations to clients will also go smoothly.
When assessing shading in particular, the position and height of obstructions and their distances relative to the planned installation area are important. Leaving estimates at a rough level leaves uncertainty in the evaluation of shading losses. A practical, staged approach is to capture the broad impact of shading in the initial proposal and then increase accuracy in the detailed proposal using on-site positioning and measurement data. A PVSyst model is more convincing the more accurate the on-site information is.
A useful tool here is LRTK, a high-precision GNSS positioning device that can be attached to an iPhone. By using LRTK, you can record position information obtained on site with high accuracy, making it easier to organize candidate installation areas, obstructions, verification points, and shooting positions. If important points on the roof and site are recorded with coordinates during the proposal-stage site survey, it helps confirm the prerequisites for input into PVSyst and aids internal layout planning.
PVSyst is a powerful simulation tool for assessing energy yield, but the on-site information that underpins it must be collected separately. Preparing the site's location, shape, causes of shading, photographs, point clouds, and positioning data greatly increases the credibility of the simulation. By combining PVSyst's energy yield estimates with high-precision on-site data acquisition using LRTK, proposal work becomes more practical and easier to explain to clients.
Summary
The workflow for using PVSyst in proposal work is not simply operating the software to produce energy output. First, it is important to clarify the project conditions and the purpose of the proposal, align site conditions and design assumptions, create a baseline model, adjust shading, losses, and equipment parameters, interpret the results, and prepare comparative proposals in response to changes in conditions. By following this workflow, PVSyst becomes not just a calculation tool but a practical tool for organizing the rationale behind a proposal.
In proposal work, customers' requests and conditions often change partway through. Rather than hastily remaking the model each time, it's important to create a baseline model, clarify what has changed, and manage those changes in a way that makes comparison easy. The results from PVSyst can add depth to proposal materials not only through annual energy production but also by allowing interpretation of monthly trends, loss breakdowns, shading effects, and the validity of the equipment configuration.
On the other hand, PVSyst’s results depend heavily on the input conditions. If site conditions are ambiguous, no matter how detailed the calculations, there is a limit to how accurate a proposal can be. It is important to correctly capture the azimuth, tilt angle, obstructions, installation area, surrounding environment, equipment layout, and other factors, and to record the basis for the input values. While assumptions may be made at the proposal stage, you should manage assumptions and confirmed conditions separately so they can be reviewed in later stages.
When starting to use PVSyst for proposal work, it is best to begin by organizing the project conditions, creating a baseline model, and getting accustomed to interpreting the results. Rather than trying to learn all of the operation items at once, using the software in a way that connects to the decisions required for proposals will make it easier to adopt in practice.
To further improve proposal quality, it is important to review not only the simulations but also the accuracy of on-site information acquisition. By utilizing LRTK, an iPhone-mounted GNSS high-precision positioning device, you can record candidate installation areas, obstructions, verification points, photo locations, and other details together with high-precision positional information. By evaluating power generation with PVSyst and accurately capturing on-site conditions with LRTK, the rationale for proposal materials becomes clearer, making it easier to present more persuasive solar power proposals to customers.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.