What kind of personnel does i-Construction 2.0 require? Five essential skills
By LRTK Team (Lefixea Inc.)
Table of Contents
• Why the required personnel profile changes with i-Construction 2.0
• Common traits of personnel sought by i-Construction 2.0
• Required Skill 1: Ability to handle 3D data
• Required Skill 2: Ability to run digital construction management
• Required Skill 3: Coordination skills that connect the site and technology
• Required Skill 4: Operational ability to balance safety and automation
• Required Skill 5: Ability to keep learning and embed change
• Company approaches to personnel development
• Summary
Why the required personnel profile changes with i-Construction 2.0
The main reason the desired personnel profile is changing is that the construction industry can no longer operate smoothly with the same staffing mix and role divisions as before. The White Paper on Land, Infrastructure, Transport and Tourism organizes that aging of workers and a decline in young entrants are expected in the construction and transportation industries, and securing and developing mid- to long-term successors is an urgent issue. Furthermore, the number of construction engineers is expected to decline by approximately 1.5–3.0% every five years after 2020, and the number of skilled construction workers is expected to decline by roughly 7–8% every five years, with those aged 50 years or older projected to account for about half of skilled construction workers by 2025. As manpower decreases, simply trying to cope by increasing personnel in the traditional way has its limits, so it is necessary to change the way work on sites is conducted overall.
Accordingly, i-Construction 2.0 is not merely about mechanization; it is being advanced as an initiative to link workflows with data, to enable remote and labor-saving site work, and to improve the quality and speed of decision-making. In the FY2025 action plan, concrete measures are listed such as linking 3D models with 2D drawings, standardizing attribute information, supervision and inspection using digital data, and creating environments for remote and automated construction. What can be read from this is that the people who will be needed going forward will not be specialists in a single task but those who can see across from data input to outcome verification.
Common traits of personnel sought by i-Construction 2.0
An important point here is that no one needs to master everything alone. It is fine for staff to have strengths leaning toward surveying, construction management, or design. However, going forward, the value of people who, while grounded in their specialty, understand surrounding digital processes and can converse with other professions will increase compared with those who never touch areas outside their specialty. For example, if site personnel understand how to read 3D models, they can more quickly spot recognition gaps with design. If construction managers understand the meaning of point clouds and as-built data, inspections and consultations can be streamlined. It is easier to understand if you think that evaluation criteria will shift from the ability to take on tasks personally to the ability to connect workflows.
Required Skill 1: Ability to handle 3D data
This skill is necessary because in future sites it will no longer be sufficient to say "being able to read 2D drawings is enough." In the FY2025 action plan, to use 3D models as contractual documents, linking 3D models and 2D drawings is to be made a principle, with rules for confirming linkage, pilot projects, and reductions in the effort needed to create 2D drawings being promoted. This indicates that in future work, 3D models will shift from being reference materials to becoming the basis for practical decisions. Therefore, personnel who will be valued are those who do not passively regard 3D data as something produced by a specialist department, but who can think about how to use it in their own responsibilities.
However, the ability to handle 3D data does not mean only being able to operate advanced specialist software freely. What is first important in site practice is being able to understand what to check when looking at a 3D model or point cloud. For example, it is important to read interference points that affect construction planning, differences in slopes or structure shapes, discrepancies between design and existing conditions, and the relationship to reference surfaces needed for as-built verification. In addition, being aware of data update timing, how coordinates and reference frames are handled, and whether expressions will be interpreted the same way by anyone will greatly reduce rework on site. A person who can make good use of 3D data is not someone who performs flashy operations, but someone who can accurately read the information necessary for site decisions.
Required Skill 2: Ability to run digital construction management
What is needed here is not so much detailed knowledge of devices as an understanding of the purpose of construction management. Why are measurements taken? At what timing should records be made to make downstream work easier? Which data formats are easy to use in consultations and inspections? In what format and to whom should data be shared to speed decision-making? People who can design these aspects will achieve different results even using the same technology. Conversely, if data is collected on site and left unused in an unusable format, digitalization will have no effect. What i-Construction 2.0 seeks is not device specialists but construction managers who keep data flowing.
Also, people who can run digital construction management directly reduce site burdens. Trials of supervision and inspection using digital data suggest using AR and similar technologies to visually grasp the acceptability of as-built conditions on site, thereby improving efficiency, speeding up phased confirmations and on-site inspections, and moving toward paperless operations. This is not merely introducing a new way to present information. It means changing site confirmation work into forms that take less time and are easier for everyone to form a common understanding. Therefore, future construction managers must bring, in addition to accuracy in creating reports, the mindset to use data to raise the quality of site confirmations.
Required Skill 3: Coordination skills that connect the site and technology
What this fact indicates is that in future personnel evaluations, the ability to bridge multiple fields will be more important than the ability to work independently. For example, introducing technology without understanding site circumstances will stumble on issues such as communication environments, construction procedures, safety zones, or as-built confirmation methods. Conversely, avoiding new technologies by focusing only on site constraints will miss opportunities for labor-saving and work style reform. People with coordination skills can create realistic compromise solutions in the middle. Those who can organize feasible implementation conditions, delineate who should prepare what, and break down pre-introduction concerns into concrete discussion points are extremely valuable as promoters of i-Construction 2.0.
When thinking about coordination skills, people tend to imagine someone good at meetings, but the essence is more practical. It is important to be able to resolve in advance ambiguous points such as who will manage coordinates and reference frames, where responsibility for updating 3D models lies, where construction data will be stored, what formats will be used for inspections, and whether the site network conditions are sufficient. In i-Construction 2.0 sites, the success of technology introduction often depends less on the presence of expensive equipment and more on role clarification among stakeholders and the precision of information transmission. That is why core personnel going forward will need planning and coordination skills as much as technical knowledge.
Required Skill 4: Operational ability to balance safety and automation
For this reason, personnel needed going forward must be more than just positive about new technologies. They need to be able to consider which tasks can be automated, where human checks should remain, how to switch over in abnormal situations, and how to make judgments when communications are interrupted or measurement errors occur. On site, it is not enough to introduce something because it seems convenient; it is important to be able to translate it into procedures that reduce risk, stabilize quality, and are acceptable to stakeholders. People who can balance safety and automation are those who can consider aggressive introduction and defensive operation simultaneously. Without this perspective, no matter how much new technology is introduced it will not take root on site.
Moreover, this operational ability is easier to develop in those with site experience. That is because they know dangerous situations, steps prone to stoppages, and procedures that easily suffer from missed confirmations. The strength of veterans is not clinging to traditional methods but converting their experience into new operational designs. What i-Construction 2.0 truly needs is not to set the digital sensibilities of younger staff against veterans’ hazard prediction, but to create personnel who can connect both and develop safe standard procedures.
Required Skill 5: Ability to keep learning and embed change
The fifth essential skill is the ability to keep learning and embed change. i-Construction 2.0 is not a fixed system that ends once training is completed. Annual trials, rule-making, and operational improvements advance regularly in areas such as making 3D models contractual documents, standardizing attribute information, remote construction, and digital supervision and inspection. In the FY2025 action plan as well, rules for checking consistency between 3D models and 2D drawings and pilot use as contractual documents are progressing, and revisions and new trials continue in construction management. In other words, people who are strong are those who have the habit of tracking changes and translating them to the site rather than memorizing the current correct answers.
What is important here is not to regard learning as limited to obtaining qualifications or classroom study. Trying one new measurement method, digitizing the as-built confirmation flow for just one step, shifting consultation materials from 2D-centered to 3D-combined, reviewing rules for photo organization—people who can continue these small improvements are more likely to embed change on site. What i-Construction 2.0 needs is not genius-level digital talent but people who do not resist change and who can move things forward while adjusting them to fit site realities.
Company approaches to personnel development
The five skills examined so far cannot be acquired by individual traits alone. Company-level development planning is necessary. Particularly important is not completely isolating site, surveying, design, and construction management roles. i-Construction 2.0 aims precisely for cross-process data linkage. If training is closed by role, 3D data may be created but not used, site measurements may not connect to inspections, and remote operations may slow consultations—such fragmentation is likely. In development, it is essential to incorporate cross-boundary learning that helps staff understand upstream and downstream processes alongside individual skill training.
Also, digital talent development is not only a theme for younger staff. In the Hokkaido Development Bureau’s action plan, in addition to promoting three types of automation, digital talent development for both contractors and clients is identified as urgent. In other words, if middle-level staff closest to site operations and veteran staff with deep decision-making experience are not involved, introduction may advance but not take root. It is effective to divide tasks so that younger staff handle operations and veterans make decisions, but it is also necessary to cultivate a common language so conversations between them can take place. Creating a state where everyone can at least understand terms such as coordinates, 3D models, point clouds, as-built conditions, attribute information, and remote verification will greatly change the speed of introduction. Harbor Bureau
Furthermore, the starting point for development does not need to be large-scale investment. What is important is increasing the frequency with which data is handled in daily operations. For example, instead of leaving existing-condition checks as just photos and notes, keep them with location information; adopt the mindset of checking as-built condition by area rather than by point; or use 3D representations even once in design-construction meetings—these small practices build the foundational strength of personnel. If digital work remains the task of a specific person, the organization will not change. It is realistic to increase simple entry points that anyone can use and then build advanced operations on top. This approach is especially effective for small and medium-sized businesses.
Summary
The personnel required by i-Construction 2.0 are not simply those who can operate new devices. They are people who can read 3D data, run digital construction management, connect the site and technology, balance safety and automation, and keep learning to embed change. In other words, personnel who can convert data and digital technology into practical site work, grounded in site experience, will be increasingly valuable on future construction sites. i-Construction 2.0 is not a topic only for advanced sites; it relates to all sites facing workforce shortages and seeking productivity improvements. Therefore, rather than searching for special people, it is important to create an environment in which existing personnel can gradually enhance their digital capabilities.
An effective first step is to digitize as simply as possible the daily tasks of measuring, recording, and sharing. When site staff can handle location information and 3D understanding without difficulty, downstream explanations, confirmations, consultations, and inspections will certainly change. If mechanisms that make it easy for site personnel to start daily positioning and recording—such as LRTK, an iPhone-mounted GNSS high-precision positioning device—are introduced, it becomes easier to raise data utilization across the entire site rather than confining it to a specialist department. In developing personnel who can respond to i-Construction 2.0, the most realistic and effective approach is to first establish digital practices in forms that can be used on site.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.