How to Start i-Construction 2.0 | 5 Steps to Take Now
By LRTK Team (Lefixea Inc.)
Moreover, this trend does not simply mean introducing new machines. For directly managed civil engineering projects, the principle-based application of BIM/CIM has progressed since FY Reiwa 5, and in FY Reiwa 6 trials began for 3D design, BIM/CIM-based quantity estimation, and supervision/inspection using digital data. The FY 2025 initiatives also specify a flow of creating trial guidelines, conducting trial works and tasks, formulating and revising procedures for full-scale operation, and full application. In other words, what is truly needed is not a list of device or software names, but to organize work procedures that make the data generated on site reusable across processes.
Table of contents
• Why you should hurry to respond to i-Construction 2.0
• Step 1 Take stock of your company’s target tasks and site issues
• Step 2 Prepare the entry point for 3D data
• Step 3 Decide the rules for data linkage first
• Step 4 Start digitizing construction management on a small scale
• Step 5 Run a continuous cycle from small-scale trials to standardization
• Common failures in i-Construction 2.0 adoption
• Summary
Why you should hurry to respond to i-Construction 2.0
With this in mind, i-Construction 2.0 is not about whether you can immediately introduce advanced unmanned construction. Rather, the important point is how far data can be connected across the flow of surveying, design, construction planning, construction, as-built verification, and supervision/inspection. In practice, BIM/CIM has been applied in principle for directly managed civil engineering projects since FY Reiwa 5, and in FY Reiwa 6 trials began for 3D design that aligns 2D drawings with 3D models, BIM/CIM quantity estimation using attribute information, and supervision/inspection using digital data. Shifting the information used on site from paper to data, and from isolated uses to continuous uses, has already become a major direction in practice.
Furthermore, looking at the main initiatives for FY 2025, the use of construction data, remote construction, automated construction, 3D–2D coordinated checks, contractual documentation of 3D models, quantity estimation, and supervision/inspection using digital data are being advanced in parallel from trials to procedure development and full-scale operation. What can be read from this is that the essence of the response is not “introducing a single technology” but “redesigning site operations around data.” That is why it is important to start small now and organize measures in an order that makes failure less likely.
Step 1 Take stock of your company’s target tasks and site issues
The first thing to do is not choose tools, but decide which of your company’s tasks will be targeted for i-Construction 2.0. The three pillars—automation of construction, automation of data linkage, and automation of construction management—can be used as axes to organize site operations. For example, as-is surveys at the start of work and as-built verification sit at the boundary between construction and data, design checks and quantity confirmation are close to data linkage, and stage inspections and supervision/inspection fall in the realm of construction management. If you aim for overall optimization without clarifying where to start, the discussion will grow large but progress will stall.
In the inventory, first list the tasks on site that actually take time. Check whether comparing paper drawings with the field takes time, whether a lot of transcription from survey results is needed, whether the same data is repeatedly recreated for meeting materials, whether photos, coordinates, and drawings are not linked for as-built verification, or whether preparation of materials for supervision/inspection has become person-dependent. The important thing here is not to look for technically advanced issues, but to verbalize site waste such as re-entry, duplicated work, waiting time, travel time, and missed checks.
In practice, it is better not to take on five or six themes from the start. For example, narrow it down to one or two themes that are easy to see the effects on site, such as “want to speed up as-is surveys,” “want to make as-built verification easier to understand,” or “want to reduce the burden of preparing inspection materials.” Then decide the target site, work type, data to be used, responsible persons, and performance indicators. The performance indicators here are best when tangible to the site, such as reduced task time, fewer site round trips, fewer rework incidents, and visualization of verification work.
If you carefully carry out this inventory, i-Construction 2.0 adoption will be reframed from “doing something new” to “reducing existing waste using data.” This stage also makes it easier to gain site buy-in. Conversely, if you skip this step, the introduced system may be unused and become merely additional work. The biggest difference in how to start actually lies in this initial organization.
Step 2 Prepare the entry point for 3D data
Next you need to prepare the entry point for 3D data. i-Construction 2.0 repeatedly emphasizes the importance of data linkage, and the foundation for that is being able to compare the existing conditions, design, and construction results in the same spatial frame. In addition to the principle-based application of BIM/CIM for directly managed civil engineering projects, trials for 3D design, BIM/CIM quantity estimation, and supervision/inspection using digital data started in FY Reiwa 6, and the FY 2025 initiatives clearly position 3D–2D coordinated checks and contractual documentation of 3D models. Being able to handle 3D data is no longer preparation only for a subset of advanced projects.
What is important here is not aiming for a perfect 3D model environment from the start. What is necessary are terrain and point clouds that represent as-is conditions, models or shape information that convey design intent, and coordinate alignment that allows those to be overlaid and compared. In other words, prioritize the minimum 3D work that will actually be used on site. If creating a polished model becomes the goal, preprocessing burdens will outweigh on-site utility and the effort will not be sustained.
What practitioners should grasp is when and which data will be updated. The data needed differs at each milestone: pre-construction as-is surveys, mid-construction progress checks, as-built verification, and final fit checks. Nevertheless, proceeding without rules for updates can lead to overlaying new design data onto outdated as-is data or losing track of which is the latest version, causing confusion. Preparing the entry point for 3D data is not just about file formats; it is about first creating update rules that allow the site to compare data with confidence.
Also, 3D work is not only for earthworks or structure construction. It speeds understanding of design content, reduces recognition gaps among stakeholders, and improves the explanatory quality of stage inspections. If you can create a state on site where “you can see and understand,” meetings and consultations are greatly shortened. In the early stages of i-Construction 2.0 adoption, this improvement in explanatory capability alone can be a sufficiently large achievement.
Step 3 Decide the rules for data linkage first
The third step is to decide the rules for data linkage first. Of the three pillars of i-Construction 2.0, this is the part most likely to be overlooked. Automated or remote construction attracts attention because it is visible, but whether the site actually becomes easier depends on whether data is connected. The FY 2025 initiatives list the use of construction data, 3D–2D coordinated checks, contractual documentation of 3D models, quantity estimation, and supervision/inspection using digital data in parallel, showing that reusing the same data across multiple processes is central in practice.
The things to standardize are not all difficult. For example: which data is the authoritative source, what to include in file names, how to unify coordinate systems and vertical datum handling, how to record the relationship between drawing revisions and model revisions, and which project number to attach photos, point clouds, and measurement results to. If these basics remain vague, differences in “what data people have” will arise between surveyors, construction staff, and supervisors, and digitization may only increase verification work.
Pay particular attention not to leave the relationship between 2D drawings and 3D data ambiguous. 2D drawings will not completely disappear on site anytime soon. Therefore, it is necessary to document which 2D drawings correspond to which 3D data and how to align both when updates occur. This is preparation that anticipates future contractual documentation and higher-level checks, and it directly prevents current rework.
When operating on site, you do not need to build a grand data platform right away. Even being clear, per project, who places what where and when, and who confirms and passes it to the next process, is highly effective. The important thing is to change handovers that relied on individual memory or goodwill into rules. The standardization of these handovers is where i-Construction 2.0 yields quick benefits.
Step 4 Start digitizing construction management on a small scale
The fourth step is to start digitizing construction management on a small scale. The three pillars of i-Construction 2.0 clearly include automation of construction management, and remote work, offsite work, and supervision/inspection using digital data are important themes. In the FY 2025 initiatives, the use of digital data for supervision and inspection is organized as an independent pillar, and trials and procedural revisions are being advanced. In other words, improving on-site management efficiency is not a peripheral issue but the mainstream.
When construction management is digitized, it does more than reduce paperwork. It makes it easier to share what was confirmed on site immediately, reduces the time needed for office-side organization, and lowers the risk of re-photographing or re-measuring for explanations. Moreover, if the range of decisions that can be made without going to the site expands, staff travel time can be reduced. This is precisely the part that directly connects to the workstyle reforms and offsite initiatives promoted by i-Construction 2.0.
It is important not to shrink the digitization of construction management to “just turning documents into electronic files.” The real aim is to link information acquired on site directly to management, verification, explanation, and inspection. If the information flow is unbroken, site decisions are faster and follow-up work decreases. This is one of the changes that is easily felt with i-Construction 2.0 adoption.
Step 5 Run a continuous cycle from small-scale trials to standardization
The final step is to run a continuous cycle from small-scale trials to standardization. Even in the FY 2025 initiatives, the flow is clear: create trial operation procedures, conduct trial works and tasks, develop and revise procedures for full operation, and full application. In other words, the national approach itself is staged: try first, confirm effects and issues, codify them into procedures, and expand. Companies will similarly find it easier to establish measures by following this order.
When selecting trial sites, you do not need a site that makes the latest technology look most spectacular. Rather, sites where the process is easy to grasp, staff are cooperative, and before-and-after comparisons are easy are more suitable. For example, if the same issues repeatedly arise in one of as-is surveys, as-built verification, photo records, or stage inspections, it becomes easier to observe improvement effects. The important thing here is to set the purpose of trials as “learning the conditions needed for standard procedures,” not “creating success stories.”
After the trial, be sure to connect it to standardization. Organize who captured which data, the timing of updates, who the checkers were, which formats were used, and what difficulties occurred on site, and turn that into procedures that can be used without hesitation next time. Success at a single site is meaningless if the process must be redone every time personnel change. Only when operations are reproducible does i-Construction 2.0 adoption become “company capability.”
At this stage, training targets also become clear. There is no need for everyone to learn everything. It is sufficient to define the minimum skills required for those who measure, those who verify, those who aggregate data, and those who use it for explanations. Progressing by dividing roles step by step reduces resistance to introduction and speeds adoption.
Common failures in i-Construction 2.0 adoption
A common mistake is trying to digitize everything at the end. If you organize photos and measurements after construction is complete and try to link them to models and documents later, information that could have been verified on site will be missing, and it will end up being supplemented manually. The trials for 3D design, BIM/CIM quantity estimation, and supervision/inspection using digital data that have progressed since FY Reiwa 6 indicate a direction of reusing data created in preceding processes for subsequent ones. Retroactive organization cannot ride that wave.
Also, aiming for full automation from the outset is dangerous. Even in the FY 2025 initiative summary, many measures proceed through stages of trials, expansion by work type, procedure formulation, and revision. If a national program proceeds in stages, it is natural that an individual company’s sites cannot jump to the final form overnight. Without the idea of starting small and standardizing where effects appear, only expectations rise and sites become exhausted.
Moreover, initiatives will not take hold if the benefits for the site are not visible. Site staff want reduced travel, fewer searches for documents or items, faster checks, and fewer reworks—not buzzwords. Even if initiated by management or headquarters, the first outcomes should always be things the site can feel. Only then will i-Construction 2.0 measures be accepted as useful rather than a burden.
Finally, a frequently overlooked point is not measuring effects. If you do not check how task time, round-trip counts, document preparation time, re-measure counts, and explanation time changed before and after introduction, you cannot identify improvements or create grounds for horizontal rollout. i-Construction 2.0 should be evaluated not by whether it was implemented, but by what decreased, what got faster, and what became safer. From that perspective, the next priorities naturally become visible.
Summary
An effective first step is to create an environment that allows accurate positioning information and as-is data to be obtained on site without difficulty. With an iPhone-mounted high-precision GNSS positioning device like LRTK, it is easy to start positioning with one hand, and you can save photos with coordinates, compare as-is point clouds with design drawings, and check earthwork volumes on site, making it easy to begin information acquisition that serves as the entry point for i-Construction 2.0 from a site-first perspective. Start with simple surveying and connect the acquired data to design checks, as-built verification, and construction management, and i-Construction 2.0 will not be a distant future topic but a current site improvement you can start implementing now. Lefixea Irtk
Lefixea Irtk
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.