What is i-Construction 2.0? Explaining the three pillars and the differences from previous measures
By LRTK Team (Lefixea Inc.)
Even when they hear the term i-Construction 2.0, many practitioners find it difficult to understand what differs from conventional ICT construction, how it connects with BIM/CIM and remote site presence, and what they should consider first at the site. In fact, i-Construction 2.0 is not merely a new slogan but is positioned as the next-stage policy that, while building on the i-Construction efforts advanced since fiscal 2016, shifts the focus toward automation of construction sites. It has been officially indicated that, by fiscal 2040, workforce reduction at construction sites should be at least 30%, that is, an increase in productivity to 1.5 times, and while it lies on the same continuum as previous measures, its aims and the depth of implementation go a step further.
In this article, we clarify the fundamental concept of i-Construction 2.0 and, from a practitioner’s perspective, clearly explain the contents of its three pillars and how they differ from conventional i-Construction initiatives. Rather than stopping at definitions of terms, we go deeper to explain why this way of thinking is necessary now and where changes on the worksite will begin.
Table of Contents
• What is i-Construction 2.0?
• Why i-Construction 2.0 is needed
• Three pillars 1 Construction automation
• The second of the three pillars: automation of data integration
• Three Pillars 3 Automation of Construction Management
• Differences from conventional i-Construction measures
• How practitioners should approach implementation
• Summary
What is i-Construction 2.0?
i-Construction 2.0 is an approach within the Ministry of Land, Infrastructure, Transport and Tourism’s measures to improve productivity at construction sites that further accelerates the conventional use of ICT and aims to automate the construction sites themselves. In government materials, it is clearly shown that i-Construction, which began in FY2016, will be "deepened" in 2024 and advanced on three pillars: automation of construction work, automation of data linkage, and automation of construction management. In other words, it is accurate to regard it not simply as introducing new equipment, but as a policy package to redesign the entire construction production process into a form that is easier to automate.
A key point here is that i-Construction 2.0 does not deny the previous measures. Rather, it is closer to the reality to understand that it was precisely because of the accumulation of ICT construction, the utilization of three-dimensional data, and BIM/CIM that it became possible to move into the next stage of automation and remote operations. The fact that, from fiscal 2023, efforts toward BIM/CIM were made standard practice for directly-administered civil engineering work and construction was also part of that foundation-building. Because automation will not progress if workflows that assume paper and manual labor are left intact, i-Construction 2.0 serves to reconnect past achievements and reorganize them into forms more effective at reducing labor.
Also, the target setting for i-Construction 2.0 is quite specific. A numerical target has been set to achieve at least a 30% reduction in labor input — that is, a 1.5-fold increase in productivity — by fiscal year 2040, and it is being implemented not merely as a conceptual整理 but as a set of measures that include a mid- to long-term roadmap for institutions, standards, and implementation. This reflects a shift from the conventional "let's try it first" stage to a stage of "standardizing systems that operate with fewer people."
Why i-Construction 2.0 Is Needed
The primary reason i-Construction 2.0 is required is to prevent the development and maintenance of social infrastructure from stopping, on the premise that labor shortages will become even more severe in the future. In the Ministry of Land, Infrastructure, Transport and Tourism’s action plan, the working-age population is expected to decline by about 20% by 2040, and the construction industry is characterized by a high proportion of older workers while the increase in younger workers is only modest. With fewer people to carry out on-site work and the importance of disaster response and measures against aging infrastructure actually increasing, methods based on the same workforce size as before cannot be sustained.
Furthermore, in recent years, the increasingly severe and frequent heavy rains and landslides have created strong demands not only for routine construction but also for rapid responsiveness in emergency recovery and infrastructure maintenance. The aging of infrastructure that was developed intensively since the period of high economic growth is also progressing, and the reality is that the workload for not only creating but also protecting infrastructure is increasing. In other words, i-Construction 2.0 is not simply a policy aimed at improving efficiency, but also foundational development to maintain social functions with limited personnel.
From a safety perspective, the significance of automation and remote operation is substantial. Government materials summarize that, based on occupational accident statistics as of 2022, fatal accidents presumed to be caused by construction machinery account for about 20%. The farther people can be kept away from hazardous locations and around heavy machinery, the easier it becomes to reduce the risk of human injury. This background is why i-Construction 2.0 includes "labor-saving" as well as "ensuring safety" as clear objectives.
In addition, the way work is carried out in the construction industry itself must change. The practice of keeping people stationed on-site to manage and make decisions in outdoor midsummer heat or at dangerous worksites will increasingly put the industry at a disadvantage when it comes to securing personnel. That is precisely why i-Construction 2.0 treats improvements to the working environment as an integral part — including remote operation and remote verification from comfortable indoor settings and reducing the time required for document preparation through data sharing. This is why it is not merely the introduction of technology, but a redesign of site operations.
Three Pillars 1: Automation of Construction
The first pillar, automation of construction, is the area that is easiest to visualize. In conventional ICT construction, the focus was on using 3D design data to assist the operation of construction machinery and to streamline surveying and as-built management. In contrast, i-Construction 2.0 aims to achieve a state in which construction progresses without people having to remain continuously on-site, through remote construction, automated construction, and the aggregation and utilization of construction data. In the government's FY2025 materials, ICT construction Stage II, remote construction, and automated construction are also specified as the core of construction automation.
In practical terms, the vision shown is one in which a single person manages multiple construction machines from off-site. In examples from 2024, autonomous operation of loading backhoes and automated construction at large-scale sites have been advanced, including a case in which three controllers operated 14 automated construction machines, and a case where visualizing the position information and operating status of dump trucks and backhoes reduced the total number of transport workers by 80. The point here is not simply to make the machines more feature-rich, but to visualize construction data and link it to optimization of the entire process.
This pillar means in practice that the targets for improvement on site are no longer limited to "operator skill." Construction is shifting from work that depends on people operating equipment well to work that optimizes machine placement, transport routes, waiting times, and task sequences based on data. In other words, labor reduction on site will not be achieved by a single leap to unmanned operation; it only begins to take effect once construction planning, machine layout, communications, sensors, safety rules, and data infrastructure are all in place. That is why, under i-Construction 2.0, the formulation of safety rules for automated construction and on-site trials are being advanced in parallel.
On the other hand, not all sites will be immediately replaced by automated construction. Government documents also note that automated construction technologies are still under development and that there are constraints on the types of work and site conditions where they can be introduced. Therefore, in the near term the adoption will proceed in areas that are highly repetitive and easy to standardize—such as earthworks, transportation, tunnels, large-scale land development, and dams—and methods that prove effective will be expanded to other types of work. What is important for site managers is not to demand full automation immediately, but to determine which tasks are well suited to automation.
Three Pillars 2 Automation of Data Integration
The automation of data linkage, the second pillar, is the area that most closely approaches the essence of i-Construction 2.0. At construction sites, enormous amounts of information circulate, including survey data, design documents, quantities, construction plans, as-built data, and inspection materials. However, conventionally data formats have been separated by process, and much transcription to paper, PDFs, and 2D drawings, as well as manual re-entry, has been required, so even when digitization was achieved information often failed to connect. The Ministry of Land, Infrastructure, Transport and Tourism has set out a policy to address this issue by advancing BIM/CIM as a foundation, standardizing 3D models, linking them with 2D drawings, and promoting the use of data from design through construction, quantity estimation, and inspection.
In the government's action plan, BIM/CIM has been applied in principle since FY2023; however, at present 3D models remain as reference materials and are not being fully utilized as construction contract documents, etc., which is cited as an issue. Therefore, under i-Construction 2.0, linkage between 3D models and 2D drawings is being ensured, and the direction is to move toward using 3D models as part of contract documents in the future. The FY2025 materials also state that 86 initiatives were carried out in FY2024, and that in FY2025 they will proceed with creating a roadmap for using 3D models as construction contract documents, establishing rules for consistency checks, and considering reductions in 2D drawings.
This shift will have a major impact on construction sites. Traditionally, when reusing information created in design for construction, people had to manually transfer it into other formats, recalculate quantities, and visually check differences between drawings and models. i-Construction 2.0 aims to reduce these duplicate tasks, make design data usable for quantity takeoff and cost estimation, and directly connect it to ICT construction machinery and factory production. In other words, automating data integration is not intended merely to reduce paper, but to reduce rework and transcription errors and to turn information into something that can be used seamlessly through downstream processes.
Also, the use of digital twins is important in this pillar. By reproducing construction steps in advance with 4D models and sharing construction imagery among stakeholders using AR and VR, it becomes easier to nip potential clashes and rework in the bud before work begins. The busier the site, the more people tend to assume problems will be dealt with after they occur, but the i-Construction 2.0 approach is the opposite. Share what can be shared in advance, and remove from manual work what can be processed by computers. Those accumulations ultimately lead to reduced manpower.
Three Pillars 3 Automation of Construction Management
The automation of construction management, the third pillar, is an area that is likely to lead to the most immediate changes for on-site personnel. In government documents, this pillar is positioned as remote and off-site. The idea is to avoid relying on permanent on-site presence and paper documents for construction management, supervision, and inspection, and to combine remote attendance, the use of digital data, robots, precast elements, and other measures to separate work that must be done on-site from work that can be done off-site.
For example, remote attendance at sites is a symbolic initiative. Relevant government documents indicate that, in principle, its application has been advanced to all directly managed civil engineering works from fiscal 2022, and there is a trend to expand its application to inspections from fiscal 2024. In the context of i-Construction 2.0, this should be seen not merely as online attendance but as a mechanism to reduce travel and waiting time and to improve the productivity of supervision and inspections. If the number of tasks that can be confirmed without traveling increases, both clients and contractors will find it easier to allocate their limited technical staff to more important decision-making work.
Furthermore, the FY2025 materials introduce the use of AR for verifying earthwork as-built conditions. Three-dimensional models and as-built management drawings created during the construction phase are overlaid and projected on site, allowing visual assessment of conformity; this is said to streamline and speed up stage checks and field inspections, enable partial paperless handling of inspection documents, and reduce the need for as-built management drawings. This reflects an intention to shift construction management from "work that goes to the site and checks paperwork" to "work that makes immediate data-driven judgments on site."
In this pillar, promoting the use of precast is also positioned as important. Precast is a long-standing concept, but in i-Construction 2.0 it is being re-evaluated as a means of off-site production that reduces on-site work and shifts manufacturing to factories. Moreover, government documents indicate a direction to reassess construction-method comparisons away from the traditional cost-centered approach, evaluating values beyond price—such as labor reduction, contributions to work-style reform, improved safety, and reduced environmental impact. This means that automation of construction management is not merely a labor-saving technology, but is attempting to change the evaluation criteria for procurement, design, and construction.
Differences from conventional i-Construction measures
Put simply, the difference between i-Construction 2.0 and the previous i-Construction measures is that it has moved from a stage of using ICT to a stage of re-automating workflows themselves on the premise of ICT. In the conventional i-Construction, which began in fiscal 2016, ICT was utilized across the entire construction production process—from surveying and measurement to design, construction, inspection, and maintenance and renewal—with the goal of improving productivity at construction sites by 20% by fiscal 2025. As Top Runner initiatives, full-scale use of ICT, the introduction of overall optimization, and the leveling of construction timing were promoted.
This conventional measure has also produced significant results. In national materials published in 2024, ICT construction was applied to 87 percent of directly managed civil engineering works eligible for its use as of fiscal 2022, and an average working-time reduction of about 21 percent compared with fiscal 2015 was confirmed. In prefectures and designated cities, the number of public notices for ICT construction rose sharply from 84 in fiscal 2016 to 13,429 in fiscal 2022. In other words, the conventional measures have steadily fulfilled the role of "spreading ICT to worksites."
However, i-Construction 2.0, building on those achievements, recognizes that merely extending the conventional approach has limits for reducing labor. Conventional ICT construction was essentially based on operators riding machines on site to perform high-precision work. In contrast, 2.0 moves toward reducing the tasks people must perform and shortening on-site time through remote construction, automated construction, construction data-sharing platforms, the formalization of 3D models as contract documents, remote site presence, AR inspections, and the use of precast elements. The difference lies not in machine performance but in how work is organized.
Another major difference is the positioning of data. Even in previous initiatives there was circulation of 3D data and use of BIM/CIM, but in practice these often remained treated as reference material, and the challenge was that they did not sufficiently connect between stages. In i-Construction 2.0, connecting data from design to construction, inspection, cost estimation, and maintenance management itself becomes the main focus. Here the goal is not "to create 3D models" but "that 3D models are automatically used in downstream processes." This difference is very significant.
Furthermore, the evaluation criteria are also changing. Traditionally, the selection of construction methods and formats tended to focus on cost, but related materials for i-Construction 2.0 indicate an approach that evaluates values beyond price—such as labor savings, contribution to workstyle reform, improved safety, and reduced environmental impact. In other words, i-Construction 2.0 is not simply a measure to build cheaper and faster, but is shifting to measures that allow sites to be operated safely and sustainably with fewer personnel.
How Practitioners Should Approach Implementation
When practitioners consider i-Construction 2.0, the first thing they should be aware of is not "what to buy" but "where tasks are being duplicated two or three times." On sites, many redundant tasks remain: reorganizing survey results into drawings, converting design information for construction use, and reformatting as-built records and inspection documents into different formats. It becomes easier to understand i-Construction 2.0 if you see the elimination of these redundancies as the entry point to reducing labor. Even if you introduce new technologies, work will not decrease unless the data are connected.
Next, it's important not to try to make the site unmanned all at once. While automation of construction tends to attract attention, in reality many cases start with places where manpower can be partially reduced, such as remote inspections, utilization of point clouds and 3D models, data linkage between design and construction, and replacement with precast. In practice, it is more important to determine which processes can reliably reduce waiting time, travel time, transcription work, and rework than to focus on whether full-scale implementation is possible.
Also, decisions about implementation should be made not for a single type of work but by including the preceding and following processes. For example, even if only construction machinery is advanced, if the preconstruction survey, design data, as-built verification, and preparation of inspection documents remain as before, the expected benefits will not materialize. Conversely, if surveying through as-built management can be linked using the same standards, coordinates, and data formats, it becomes easier to increase throughput without substantially increasing on-site personnel. The automation that is a keyword of i-Construction 2.0 should be understood as applying to the entire workflow, not to individual tasks.
From that standpoint, the first step in on-site implementation is to organize the data inputs. Capturing existing conditions with accurate positional information and keeping them in a form that is easy to reuse for design and construction management will determine the labor savings in later stages. The more you aim for sophisticated analysis and advanced automation, the more critical the accuracy and usability of the input data become. If practitioners are to embrace i-Construction 2.0 as their own, it is essential that they first review the basic actions of measuring, recording, and sharing with downstream processes in mind.
Summary
i-Construction 2.0 is the next-stage initiative that, while building on the conventional i-Construction, advances productivity improvement on construction sites from "ICT utilization" to "automation." The three pillars are the automation of construction operations, the automation of data linkage, and the automation of construction management, and they are not independent measures but work together to operate sites safely, comfortably, and with high quality by a smaller number of personnel. The difference from previous initiatives lies not in adding technologies but in redesigning the way work itself is carried out.
Moreover, what matters in practice is not viewing i-Construction 2.0 as a distant-future concept. A realistic first step is to identify where redundancies and waiting occur in surveying, design, construction, as-built verification, and inspection, and to streamline processes starting from the data entry points where information connects. In particular, the accuracy and speed of assessing current conditions and verifying as-built results will determine the effectiveness of subsequent data integration. In that respect, iPhone-mounted GNSS high-precision positioning devices like LRTK, which make it easy to quickly obtain high-precision location information on site, are a good choice for laying the practical groundwork for i-Construction 2.0. If you are serious about reducing on-site labor, it is recommended to first reassess things from the perspective of how to organize the data entry points.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.