How Will Construction Sites Change with i-Construction 2.0? Six Practical Impacts Explained

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Table of Contents

• What is i-Construction 2.0?

• Practical Impact 1: How construction planning is done will change

• Practical Impact 2: Surveying and as-built management will be based on 3D

• Practical Impact 3: On-site inspections and construction management will become easier to do remotely

• Practical Impact 4: Document work will decrease, but the importance of data management will increase

• Practical Impact 5: The type of personnel required on site will change

• Practical Impact 6: The differences in implementation benefits are decided during the preparation stage

• What practitioners should do now in the i-Construction 2.0 era

• Summary


What is i-Construction 2.0

i-Construction 2.0 is a concept put forward by the Ministry of Land, Infrastructure, Transport and Tourism to further improve productivity at construction sites, organized as an initiative that advances conventional ICT use one step further and places greater emphasis on automating construction sites. The direction it seeks is not simply the introduction of equipment; it aims to create sites where work proceeds safely, comfortably, and stably with fewer people. A goal has been announced to reduce labor at construction sites by at least 30% and to increase productivity to 1.5 times by fiscal year 2040, along with a structure centered on three pillars: construction, data linkage, and construction management.


What is important here is that i-Construction 2.0 is not merely a new slogan. Under the conventional i-Construction, a major theme was the introduction of individual technologies such as ICT-equipped construction machinery, 3D surveying, and the use of BIM/CIM. By contrast, i-Construction 2.0 emphasizes not digitalizing only parts of the site, but connecting construction, data integration, and construction management to change the way the work itself is carried out. In other words, it is an approach closer to redesigning the entire construction production process rather than making point improvements.


Therefore, the impact on practitioners is considerable. Order handling, preparatory work, management of completed work, responses to supervisory inspections, in-house training, and the division of roles with partner companies will all need to be reviewed across a wide range of areas. This does not mean that the rules of thumb that have worked on site until now will become unnecessary, but there will be more situations in which they alone will not be sufficient. From now on, the ability to convert experience into data, make decisions based on that data, and carry the results of those decisions into the next process will become the very source of on-site competitiveness.


Operational Impact 1: How Construction Planning Will Change

One of the first things likely to change with i-Construction 2.0 is the way construction plans are developed. Traditionally, the process centered on 2D drawings, schedules, site inspections, and assembling construction procedures based on experience. But going forward, there will be a stronger trend toward treating 3D data as the basis and considering construction conditions, the surrounding environment, work sequences, equipment used, and as-built verification as an integrated whole. To advance automation in construction, judgments that people used to flexibly make on site need to be defined in advance as much as possible through data and rules.


This change may also seem to mean an increased burden during the planning phase. In fact, there is that aspect in the early stages of implementation. The list of preparations increases: three-dimensional understanding of the existing terrain, alignment with design data, organizing the conditions of the construction scope, confirming the data formats to be used, and standardizing handover methods with partner companies.


However, precisely because of that, it becomes easier to reduce rework after construction begins. This is because it allows you to proactively suppress misunderstandings that tend to occur in later processes, coordinate shifts, differences in the interpretation of control cross-sections, and omissions in photos and as-built records.


In on-site practice, the quality of construction plan documents is also changing. Going forward, plans accompanied by data such as 3D models, location information, time-series management, and machine operating conditions — not just plans explained in text — will be more likely to be valued. When aiming for automation or semi-automation of construction, the more ambiguous instructions and subjective judgments remain, the more unstable the operation becomes. Conversely, if information is organized at the planning stage, the site can be run more easily with fewer people.


In other words, under i-Construction 2.0, the construction plan will no longer be a document submitted before the start of construction, but will become an operational blueprint for carrying out the work. Whether it is possible to switch to this perspective is a major practical turning point.


Practical Impact 2: Surveying and as-built management will be based on 3D data

Another major change is a shift in the approach to surveying and as-built management. In i-Construction 2.0, automation of data linkage—not just construction itself—is included as a pillar. This means reexamining the fragmented flow of finishing with surveying, finishing with drawing, and finishing with report generation, and moving toward making acquired data usable as-is in the next process. The use of 3D surveying and 3D design data lies at the center of this.


At past sites, surveying has often been treated as work for establishing reference points and verifying as-built conditions, and results were converted into reports and drawings for sharing. However, going forward it will be assumed that point clouds, TINs, 3D models, and geotagged photos will flow into construction management, inspection, and maintenance. Therefore, more than simply being able to measure, it becomes important to preserve data in forms that can be used later. In addition to the concept of measurement accuracy, it will be necessary to organize matters including unifying coordinate systems, how to assign attributes, interoperability of deliverables, and methods for comparing current conditions with design.


As-built management will also change. Rather than merely checking limited control cross-sections as before, the trend toward grasping the construction state as surfaces and spaces and confirming progress and quality in three dimensions is strengthening. This makes it easier to increase the density of checks, but at the same time the amount of data also grows. What matters on site is not recording everything in fine detail, but deciding up front what should be recorded, to what level of accuracy, at what timing, and in what format. If measurements are increased without an operational plan, the management workload will instead balloon.


Moreover, when operating on a three-dimensional basis, on-site personnel are required to serve as a link between surveying staff and construction management. The more construction managers who can understand surveying data and the more surveyors who can understand construction conditions, the greater the benefits of implementation tend to be. i-Construction 2.0 is more practically viewed not just as the advancement of surveying operations but as an initiative that uses surveying as a starting point to speed up decision-making across the entire site.


Practical Impact 3: On-site inspections and construction management become easier to perform remotely

Another important change in i-Construction 2.0 is that construction management will become easier to carry out remotely. Documents from the Ministry of Land, Infrastructure, Transport and Tourism also indicate a direction toward automation of construction management, remote construction management, and labor-saving through supervisory inspections. This is not simply about increasing the number of online meetings. The essence is to grasp site conditions from a remote location and to enable necessary checks and decisions to be made efficiently.


The practical benefits are clear. Reductions in travel time, increased inspection frequency, easier concurrent management of multiple sites, and centralized record-keeping can be expected. In particular, for companies that must oversee multiple sites with a limited number of staff, the importance of remote operations grows. If information sharing among site representatives, supervising engineers, survey staff, design staff, and the client becomes smoother, it will be easier to shorten decision-making time lags.


However, remote operations do not mean you no longer need to go to the site. Rather, what is required is the precision to distinguish between situations that require a site visit and those that can be verified by data. Safety checks, on-the-ground feel for the natural ground and surrounding conditions, responses to neighbors, and other information that can only be obtained locally remain important. On the other hand, confirmation of as-built conditions, sharing progress, daily situation awareness, and organizing records become increasingly feasible remotely as data integration advances.


Here the difference comes down to how site data are collected. Sites that are easy to assess remotely have photos, location information, 3D data, and timestamp information accumulated according to consistent rules. Conversely, when each photographer records data differently, coordinates are ambiguous, file names are inconsistent, and it is unclear which data are the latest, remote operations do not function. i-Construction 2.0 means not only introducing equipment for remote inspection but shifting to operations that can continuously retain verifiable data.


Operational Impact 4: Administrative Paperwork Will Decrease, but the Importance of Data Management Will Increase

One of the effects that working-level staff are likely to expect is a reduction in paperwork. In fact, the direction of i-Construction 2.0 includes elements such as digitization, going paperless, reducing paperwork by leveraging on-site data, enhancing supervision, and improving inspection efficiency. Moving toward reducing paper-based transcription tasks and double data entry is a significant benefit for worksites.


However, what must not be misunderstood here is that a reduction in paperwork is not synonymous with easier management. Even if paper documents decrease, if the data is not properly organized, the workload will increase in other forms. For example, if file formats are not standardized, the handling of coordinate information differs from site to site, updates after design changes are not communicated, or the linking between photos or survey results and work categories is ambiguous, work to reconcile these issues will be required later. In other words, digitization can bring to light burdens that were hard to see in the paper era.


Therefore, what is needed in the i-Construction 2.0 era is not just the ability to create forms and reports, but the ability to organize data. If you do not decide which data will serve as the master copy, what the naming rules will be, at what point a version is finalized, and who will be responsible for updates, the site will quickly become confused. Data management on site is not an administrative support task; it becomes a foundational operation that supports construction quality and progress management.


Also, changes will occur in client interactions. Going forward, it will become increasingly important not only to neatly compile the final paper deliverables but to coherently accumulate data from intermediate stages. In other words, the practice of trying to reconcile everything at the end will become less viable. How daily records are kept, how verification results are linked, and how change histories can be traced will be the factors that differentiate the quality of work.


Operational Impact 5 The profile of personnel required on-site will change

i-Construction 2.0 will certainly change the types of personnel required on site. What will be needed is not simply people who can operate new equipment. Rather, it will be people who understand the site’s objectives, select the necessary data, and translate it into operational procedures in a form that stakeholders can understand. A cross-disciplinary understanding that is not limited to just one area—construction, surveying, design, quality control, or safety management—will be strongly required.


For example, going forward construction managers will need, in addition to schedule coordination and safety management, to understand the meaning of 3D data and to be able to consider its connections to as-built management and inspection data. Survey personnel will be stronger if they can do more than just measure accurately and can also envision how their results will be used in construction and inspections. Site supervisors and managers will be required not only to compare the performance of technologies being introduced but also to judge whether those technologies can be operated effectively within their company’s on-site organization.


At the same time, this does not mean that veterans’ experience will become unnecessary. On the contrary, the value of experience will increase. However, what matters is whether that experience can be shared beyond an individual’s hunches as decision criteria and operational rules. i-Construction 2.0 does not deny experience; rather, it is a movement to transform experience into reproducible forms. People who can link what to observe on site, where deviations are likely to occur, and under which conditions risks increase to data will be increasingly valued.


The way training is conducted will change. Until now, much of the learning may have come from following senior staff around the site, but going forward, review and standardization using data, models, and records will become important. Even in new employee training, it will be easier to make them understand why these records are necessary and why this coordinate management is important. One of the practical values of i-Construction 2.0 is that it enables a shift from person-dependent instruction to reproducible training.


Operational Impact 6: Differences in implementation effectiveness are determined during the preparation phase

The success of i-Construction 2.0 is largely determined during the preparation phase rather than after work begins on site. This is a reality common to many sites. In cases where implementation does not go well, it is often not the technology itself that is to blame, but that the objectives and operational design were left vague from the start.


A common problem is that the introduction of equipment or software becomes an end in itself. In that case, even if a site appears to be digitized temporarily, the conventional work ends up continuing in parallel and only the burden on staff increases. For example, whether you want to speed up assessment of the current status, make as-built verification more rigorous, streamline handling of supervisory inspections, or monitor multiple sites remotely will change the data and workflows required. If the purpose isn’t defined at the outset, both the data you collect and the way you evaluate outcomes will be inconsistent.


Also, aligning understanding with partner companies and clients is extremely important. Even if your company proceeds on the assumption of 3D data, if handover conditions and expectations for deliverables are not shared, conversion work and explanatory tasks will increase along the way. i-Construction 2.0 is unlikely to succeed if a single site staff member works hard alone; it requires an approach that involves the organization and stakeholders.


There are common traits among worksites where implementation readily produces benefits. First, it is clear which process is targeted and by how many hours it should be reduced. Next, the necessary data items and the timing of their collection are determined. Furthermore, responsibilities by person and data storage rules are well organized. In other words, the key to success lies not so much in advanced technology itself as in the care taken to prepare for implementation on the ground.


What practitioners should do now in the i-Construction 2.0 era

So, what should practitioners start doing now? First, concretely identify which tasks are taking the most time on their site. Whether it’s surveying, as-built verification, photo organization, document preparation, or coordination and confirmations with the client, you cannot determine the priority for implementation unless you make this clear. Because i-Construction 2.0 covers a wide range, pursuing it vaguely will make it difficult to become established on site.


Second, gradually shift operations from being centered on 2D documents to ones that leverage 3D and location information. There is no need to change the entire process from the outset. It is realistic to start with areas where the effects are easy to see, such as current-condition assessment, as-built verification, and progress sharing. The important thing is not to end with a one-off demonstration, but to retain it as a procedure that can be reproduced at the next site.


Third, decide—even if only briefly—on data naming, storage locations, and update rules. This is unglamorous, but it determines the effectiveness of the implementation. No matter how high-precision your data is, it’s meaningless if no one can find it, if the latest version is unclear, or if it can’t be reused. Workplace DX is set apart by this kind of basic groundwork rather than by flashy technology adoption.


Fourth, ensure on-site personnel use consistent terminology. If terms such as coordinates, model, point cloud, as-built condition, attributes, and final version mean different things to different people, operations will quickly break down. In i-Construction 2.0, establishing a common language to connect data among the field, surveying, design, and management teams is more important than before.


Finally, it is important to choose a system that can be used on site. Even if it is highly functional, a system that takes too long to prepare, is difficult to handle on site, or makes data sharing cumbersome will not become established. The busier the site, the more important it is that measurements are easy to take, can be shared immediately, and lead to the next decision. In that sense, an approach like LRTK—which uses location information to streamline current-condition assessment and simple surveying and makes it easier to incorporate the collection and use of site data into daily workflows—naturally aligns with the practical work of the i-Construction 2.0 era.


Summary

The changes brought to sites by i-Construction 2.0 are not simply an expansion of ICT adoption. The way construction plans are created will change, surveying and as-built management will assume a three-dimensional basis, construction management will become easier to carry out remotely, paperwork will decrease while the importance of data management increases, and the profiles of personnel required will also change. Moreover, differences in implementation effectiveness widen more during the preparation phase than after work on site has begun.


For practitioners, what matters is not just viewing i-Construction 2.0 as a major institutional change and leaving it at that. It is important to concretely identify what will change at your own worksite and where to start to achieve results, and to operationalize those changes into small, repeatable practices. With on-site labor shortages, the need to ensure safety, improve quality, and advance workstyle reform all requiring simultaneous progress, i-Construction 2.0 is an unavoidable theme.


Going forward, the competitive edge at construction sites will be how experience and data are connected. What’s needed now is not chasing difficult terminology, but putting in place practical processes for data acquisition, sharing, and decision-making that can be used on site. Those cumulative efforts will lead to creating work sites that can respond to i-Construction 2.0.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page