top of page

What Will Change with the Ministry of Land, Infrastructure, Transport and Tourism’s i-Construction 2.0?整理 of the Latest Direction

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Table of Contents

How to initially view i-Construction 2.0

What i-Construction is in the first place

Scope covered by i-Construction

What changes with i-Construction 2.0

The three pillars at the heart of the change

What construction automation means

The direction indicated by advanced data integration

The significance of automating construction management

Differences from the previous i-Construction

Why the direction has become clearer in 2.0

The perspective of creating a system that works with few personnel

The approach to sustaining safety and high quality

Viewing i-Construction 2.0 within the DX trend

How beginners should interpret it

How to summarize what changes in one sentence

Conclusion


How to initially view i-Construction 2.0


The original i-Construction is a productivity-improvement initiative that covers everything from surveys and measurements, design, construction, inspection, to maintenance and renewal. In other words, it is not about improving only a part of construction work, but a way of thinking that raises productivity by overseeing the entire flow from start to finish. This is the starting point.


On that basis, i-Construction 2.0 sets out three pillars: automation of construction, advanced data integration, and automation of construction management. Furthermore, although the original initiative also aimed at improving overall productivity, 2.0 more clearly articulates the goal of creating systems that can sustain infrastructure development and management safely and with high quality even with a small number of personnel.


In other words, the change with i-Construction 2.0 is not that the direction suddenly shifted. The foundation of productivity improvement remains the same; what has become clearer is how to achieve it and the intent behind it. Beginners will find it easier to grasp the overall picture by first understanding this point.


What i-Construction is in the first place


First, i-Construction is a measure aimed at improving productivity. What is important here is not merely shortening work time, but viewing it as a way of rethinking the overall approach to reduce strain and waste so that work proceeds more stably. Although “productivity improvement” may sound broad, i-Construction is meaningful because it seeks to realize that improvement across the series of processes related to construction and infrastructure.


Second, its scope is wide. It is not limited to surveys and measurements, nor to construction alone, nor to inspection alone. It includes design as well as maintenance and renewal. In other words, improving only earlier processes is insufficient, and improving only later processes tends not to lead to overall optimization—this way of thinking is reflected directly in the scope of the initiative.


When beginners try to understand i-Construction, it is easier to think of it as a set of policies and a way of thinking to improve productivity across the entire body of construction and infrastructure work rather than memorizing it as a specific technical term. With that understanding, the new directions indicated in 2.0 will naturally connect and become clearer.


Scope covered by i-Construction


What is particularly important in understanding i-Construction is that its scope is very broad. The fact memo states that it includes surveys and measurements, design, construction, inspection, and maintenance and renewal. Just reading this sequence shows that i-Construction is not a measure focused on a single part of the process but one that looks at the whole.


Surveys and measurements concern the stage of understanding before starting work. Design is the stage of determining form based on that understanding. Construction is the stage of actually forming it, and inspection is the stage of verifying the results. Including maintenance and renewal means that the finished project is not left outside the scope. i-Construction considers productivity improvement through these flows.


This wide scope is directly connected to understanding i-Construction 2.0. Of the three pillars presented in 2.0, automation of construction and automation of construction management appear closely related to the construction phase, but advanced data integration is meaningful across multiple stages. Because the original i-Construction was conceived to include the entire process from the beginning, 2.0 also emphasizes connections between stages.


A common mistake for beginners is to think i-Construction is only about construction. However, compared with the fact memo, that understanding is too narrow. i-Construction is a policy to improve productivity from start to finish. If you lose sight of this foundation, it will be hard to see why “advanced data integration” is one of the pillars in 2.0.


Conversely, if you correctly understand the scope of i-Construction, 2.0 will appear not as just a new renaming but as an arrangement to more strongly link the overall flow so that work can proceed with fewer personnel while maintaining safety and high quality.


What changes with i-Construction 2.0


So, what changes with i-Construction 2.0? This is what many people are most curious about. Organizing the content of the fact memo as it is, the changes can be seen from two major perspectives.


The first is that the pillars are clearly presented. In i-Construction 2.0, automation of construction, advanced data integration, and automation of construction management are set as pillars. The previous i-Construction also aimed to improve overall productivity, but in 2.0 it is more clearly organized what the core axes for moving forward are.


The second is that the way goals are presented has become more concrete. While the previous initiative also aimed at productivity improvement, 2.0 more clearly highlights building systems that can sustain infrastructure development and management safely and with high quality even with a small number of personnel. This is very important. It is not just about improving efficiency; it emphasizes that work should be maintainable with fewer people, that safety is preserved, that high quality is maintained, and that these conditions are sustainable.


Put simply, whereas the previous i-Construction had the broad direction of “advancing overall productivity improvement,” i-Construction 2.0 more strongly emphasizes the perspective of “how to create systems that can sustain operations safely and with high quality even with few personnel.”


Thus, what has changed is less the purpose itself and more the aspects of the purpose that are particularly emphasized and the clear axes for achieving it. Therefore, when understanding 2.0, it is closer to reality to view it as “the same flow with a clearer direction” rather than a complete break with the past.


The three pillars at the heart of the change


You cannot avoid the three pillars when trying to understand i-Construction 2.0: automation of construction, advanced data integration, and automation of construction management. These are not merely listed; they represent the direction of 2.0 itself.


First, there is automation of construction. This indicates that 2.0 strongly emphasizes automation in actual construction scenes. While the previous i-Construction also aimed at overall productivity improvement, 2.0 positions how to change the construction itself as one clear pillar.


Next is advanced data integration. Considering that i-Construction originally covered everything from surveys and measurements to maintenance and renewal, this pillar is extremely important. Because the process is wide, the fact that information handled at each stage is connected has significance. 2.0 makes clear the direction of advancing those connections to a higher level.


And then there is automation of construction management. The fact that not only construction itself but also its management is a target for automation is a distinguishing feature of 2.0. It is not only the hands-on work that is expected to change but also how the work is managed. This is strongly tied to the goal of sustaining systems that operate safely and with high quality even with few personnel.


These three pillars are not separate stories. If construction is automated but data does not connect well, the overall effect will be weak. If data integration progresses but construction management remains unchanged, it will be difficult to establish a system that operates stably with few personnel. Only when construction, data, and management come together does the system 2.0 seeks to build become visible.


What construction automation means


The phrase “automation of construction” stands out within i-Construction 2.0. Beginners may find this the most striking point. However, based on the fact memo, the important point is that construction is not everything.


That construction automation is set as a pillar shows that 2.0 sees the construction phase as an important locus of change. The previous i-Construction included construction, but 2.0 places a stronger focus on how construction itself should proceed. This is one characteristic of 2.0.


However, construction automation does not exist alone. The fact memo simultaneously lists advanced data integration and automation of construction management as pillars. In other words, construction automation should be positioned within the overall flow rather than as simply making some tasks automatic.


Also, because 2.0 more clearly emphasizes building systems that can sustain infrastructure development and management safely and with high quality even with a small number of personnel, the aim of construction automation is not just labor-saving. It is tied to being able to operate with fewer people, to keep safety, to maintain high quality, and to make these conditions sustainable.


Therefore, when understanding construction automation, it is insufficient to ask only “Will work become easier?” Viewing it from the perspective of “How does this connect to building a system that can be sustained safely and with high quality even with few personnel?” brings you closer to the intent of 2.0. The goal is not automation for its own sake but how construction changes within a sustainable system.


The direction indicated by advanced data integration


Among the three pillars of i-Construction 2.0, advanced data integration may be somewhat harder for beginners to grasp. However, this pillar is extremely important for understanding the essence of i-Construction. That is because i-Construction has always been a measure covering surveys and measurements, design, construction, inspection, and maintenance and renewal.


The wider the process, the harder it is to improve overall productivity if each stage is disconnected. Conversely, the more the stages are connected, the smoother the overall movement becomes. The phrase “advanced data integration” in the fact memo can be understood as indicating a direction to strengthen this overall coherence.


What matters here is that data integration is not a mere auxiliary item but is presented as one of the pillars of 2.0. Automation of construction and automation of construction management tend to draw attention to construction scenes, but advanced data integration plays the role of connecting the stages. Because of this, i-Construction 2.0 does not become just a measure to improve construction efficiency but stands as a direction that looks across the whole process.


Also, considering that 2.0 clearly highlights building systems that can sustain infrastructure development and management safely and with high quality even with few personnel, advanced data integration can be seen as a foundational support for that system. The fewer the people involved, the more burdensome it becomes if information is fragmented across stages. To maintain safety and quality, a connected way of working is essential.


In short, advanced data integration may be a less conspicuous term, but it is a central pillar supporting the direction of i-Construction 2.0. Understanding 2.0 becomes easier if you see it not only as changes to construction itself but as strengthening the connections between stages.


The significance of automating construction management


In i-Construction 2.0, automation of construction management is presented as a pillar alongside construction itself. This is a very important point. Even if the hands-on work changes, if the approach to management and how work is advanced does not change, the overall effect can be limited.


As noted in the fact memo, 2.0 more clearly emphasizes building systems that can sustain infrastructure development and management safely and with high quality even with a small number of personnel. Given that the word “management” is included, automation of construction management is deeply connected to the intent of 2.0.


Construction management is not separate from construction; it is an important part that enables construction to take place. That is why 2.0 lists automation of construction management alongside automation of construction. This perspective shows that it is not enough for only field work to change; the way work is advanced and supported also needs to change.


Moreover, to proceed sustainably with few personnel, it is necessary to rethink not only the work itself but also management burdens and procedures. To continue infrastructure development and management while preserving safety and high quality, how management is performed becomes important. This explains why automation of construction management is a pillar in 2.0.


Beginners tend to focus on automation of construction, but automation of construction management is equally important. In fact, only when construction, data, and management are all in place does it become more feasible to build the systems 2.0 aims for—sustainable, safe, and high-quality operations with few personnel. Grasping these three elements as a set is the quickest path to understanding.


Differences from the previous i-Construction


To understand i-Construction 2.0, you need to grasp the differences from the previous i-Construction. However, be careful not to overemphasize differences to the point of losing sight of continuity. Based on the fact memo, it is appropriate to recognize that both share a common foundation and that 2.0 clarifies the direction more explicitly.


What they share is the goal of improving productivity. The previous i-Construction also aimed at improving overall productivity, and its scope included surveys and measurements, design, construction, inspection, and maintenance and renewal. In that sense, 2.0 did not suddenly adopt a whole-process perspective; that perspective has been there from the beginning.


The difference lies in what is emphasized more clearly. In 2.0, creating systems that can sustain infrastructure development and management safely and with high quality even with a small number of personnel is more clearly presented. In other words, while the previous i-Construction had the broad direction of overall productivity improvement, 2.0 makes it more concrete under what social and practical conditions that productivity improvement should be realized.


Furthermore, 2.0 sets out three pillars: automation of construction, advanced data integration, and automation of construction management. This makes it easier to read what the initiative will focus on. While the previous i-Construction indicated a broad direction, 2.0 clarifies the priorities for realizing it.


Seen this way, 2.0 does not negate the previous i-Construction. Rather, it inherits the earlier flow while bringing to the fore the perspectives that should be emphasized now. For beginners, it is easier to understand by asking not “What has completely changed?” but “Within the original way of thinking, what has been emphasized more strongly?”


Why the direction has become clearer in 2.0


The fact memo states that 2.0 more clearly highlights the creation of systems that can sustain infrastructure development and management safely and with high quality even with few personnel. The expression “more clearly” captures the essence of 2.0.


The previous i-Construction also aimed at overall productivity improvement. In other words, the need for efficiency and improvement was already recognized. But 2.0 more clearly shows the shape of the system-building that lies beyond that. The key point is that the elements of few personnel, safety, high quality, and sustainability are presented together as a coherent goal.


This clarification is important because the phrase “productivity improvement” alone can make the purpose appear abstract. Productivity improvement is important, of course, but by itself it can be hard to see how to change on-site and management practices. 2.0 makes the direction easier to grasp by articulating the goal as “building systems that can sustain infrastructure development and management safely and with high quality even with a small number of personnel.”


Also, the fact that three pillars support this goal contributes to the clearer direction. Because 2.0 organizes not only construction but also data integration and construction management, it shows that system-building cannot rely on a single element. Precisely because i-Construction covers a wide range of processes, 2.0 makes the emphases clearer than before.


For beginners, it helps to view 2.0 not merely as a revised edition with a new number but as “the same direction as before expressed in the more concrete language of building sustainable systems.”


The perspective of creating a system that works with few personnel


The aspect of i-Construction 2.0 most succinctly expressed is that it more clearly highlights building systems that can sustain infrastructure development and management safely and with high quality even with few personnel. This single sentence condenses the thinking of 2.0.


First, note the phrase “with few personnel.” This is not merely another way to say efficiency. The perspective of ensuring work can be carried out with fewer people implies a need to rethink how work is advanced and supported. That is why 2.0 includes not only automation of construction but also advanced data integration and automation of construction management as pillars.


Next, the condition “safe and high quality” is specified. It is not sufficient merely to enable work with fewer people if safety or quality deteriorates. 2.0 requires that fewer personnel, safety, and high quality be achieved together. In other words, it is not about simply reducing headcount but about creating systems in which safety and quality can be maintained with fewer people.


Furthermore, the phrase “sustain” is important. The emphasis is on lasting viability, not temporary success. This also indicates that 2.0 looks toward long-term mechanisms rather than short-term fixes.


From this perspective, the three pillars of 2.0 should be understood not as separate improvement measures but as components for sustaining safety and high quality with fewer personnel. Changing construction, strengthening data connectivity, and changing management—the combination of these three makes the notion of system-building concrete.


The approach to sustaining safety and high quality


In i-Construction 2.0, building systems that can sustain infrastructure development and management safely and with high quality even with few personnel is emphasized. Within this phrase, the three elements “safety,” “high quality,” and “sustainability” are not individually prioritized; they are expected to be achieved simultaneously.


Safety’s importance goes without saying. What matters here is that safety is not presented as an isolated goal but alongside few personnel, high quality, and sustainability. In other words, even when changing work practices, safety is not expected to be deprioritized. 2.0 makes clear that safety must be preserved through the changes.


The same is true of high quality. When discussing productivity improvement, speed and efficiency often take the spotlight, but 2.0 places maintaining high-quality infrastructure development and management at the forefront. This indicates that increasing speed or reducing personnel is not the sole objective; preserving quality is equally necessary.


Moreover, the inclusion of “sustainability” means 2.0 values mechanisms that can persist over time rather than one-off successes. It emphasizes the importance of systems that can continue to maintain safety and quality even with fewer people.


Putting these three together clarifies 2.0’s direction: it is not just a technical issue but a question of systems. The three pillars—construction, data, and management—are set to ensure that efficiency gains do not come at the cost of safety or quality and that the improved system is sustainable.


Viewing i-Construction 2.0 within the DX trend


The fact memo states that i-Construction is positioned as a core policy in the DX action plan for the infrastructure sector. This line is an important clue for understanding i-Construction 2.0 not in isolation but within a larger trend.


What this shows is that i-Construction is not treated as a mere on-site improvement measure but occupies a central position in the DX of the infrastructure sector. In other words, the direction of i-Construction 2.0 is to be understood as part of broader changes across the infrastructure field rather than isolated tweaks at the site level.


From this viewpoint, it is easier to understand why advanced data integration is a pillar in 2.0. Because i-Construction was already conceived to include the entire process and is positioned as a core measure in the DX action plan, emphasizing stronger connections between stages is natural. The focus is not only on construction but on increasing collaboration across the whole process, which aligns with DX trends.


Also, the clearer emphasis on building systems that can sustain infrastructure development and management safely and with high quality even with few personnel makes more sense when seen in the context of DX. Here, DX is not just a buzzword but an organizing principle supporting system-building. The three pillars of 2.0 can be understood as axes to advance that system-building.


Beginners may find the word DX daunting, but within the scope of the fact memo, it is sufficient to interpret that i-Construction sits at the center of changes in the infrastructure sector. i-Construction 2.0 is an arrangement that shows the latest direction of this central policy.


How beginners should interpret it


First-time viewers of i-Construction 2.0 may be unsure where to start. In that case, do not overcomplicate things: following the five main points in the fact memo in order is enough to grasp the whole picture.


Next, confirm that i-Construction is a productivity-improvement measure covering surveys and measurements, design, construction, inspection, and maintenance and renewal. This shows the wide scope and that it is a policy to improve across the entire process.


Then, grasp the three pillars of i-Construction 2.0: automation of construction, advanced data integration, and automation of construction management. These concretely indicate the latest direction.


Further, read that while the previous initiative also aimed at improving overall productivity, 2.0 more clearly emphasizes building systems that can sustain infrastructure development and management safely and with high quality even with few personnel. This is the core point to understand the difference from the previous approach.


Finally, note that i-Construction is a core policy in the infrastructure sector’s DX action plan. This shows that 2.0 is not a minor tweak but occupies an important position in broader changes across the sector.


If you organize your understanding in this order, beginners can grasp i-Construction 2.0 without feeling it is overly difficult. The key is to look at the overall flow, the pillars, and the intent rather than chasing individual terms alone.


How to summarize what changes in one sentence


This summary contains all the essential points from the fact memo: continuity from initiatives promoted since 2016, the broad scope from surveys and measurements to maintenance and renewal, the foundational goal of productivity improvement, the three pillars presented in 2.0, and the aim of building systems that can sustain infrastructure development and management safely and with high quality even with few personnel.


The important thing is to view “what changes” not merely as adding new functions or mechanisms but as a clarification of direction. Because the previous initiative already aimed at productivity improvement, 2.0 builds on that foundation and shows what to prioritize now.


Moreover, this change is not an internal rearrangement limited to i-Construction. Since i-Construction is positioned as a core policy in the infrastructure sector’s DX action plan, 2.0 sits within a larger flow of change. In that sense, 2.0 is not just a name change but an important orientation for thinking about the future of the infrastructure sector.


When beginners try to understand it, it is better not to remember only the aspect that “construction automation will increase,” but to think of it as “an arrangement that more clearly advances a system that can be sustained with few personnel while protecting safety and quality through the three directions of construction, data, and management.” That will give a more accurate understanding.


Conclusion


In 2.0, automation of construction, advanced data integration, and automation of construction management are presented as pillars. These three pillars represent a direction to change not only construction itself but also the overall connections and approaches.


More importantly, while the previous initiative also aimed at improving overall productivity, 2.0 more clearly highlights building systems that can sustain infrastructure development and management safely and with high quality even with few personnel. This is the core of the latest direction. Although the overarching goal of productivity improvement remains, what is emphasized has become clearer than before.


Also, i-Construction is positioned as a core policy in the infrastructure sector’s DX action plan. This indicates that i-Construction 2.0 is not an isolated improvement measure but a central idea in the larger transformation of the infrastructure field.


In conclusion, what changes with i-Construction 2.0 is that, while inheriting the prior flow of overall productivity improvement, it more clearly sets out the three directions—construction, data, and management—toward building systems that can sustain infrastructure development and management safely and with high quality even with few personnel. For beginners, grasping this single axis is sufficient to understand the overall picture of i-Construction 2.0.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page