What changes when ICT construction machinery is introduced? Real-world examples of improved site efficiency and cost reduction

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

What changes on site when ICT construction machinery is introduced? In recent years, the term "ICT construction machinery" (construction equipment that utilizes information and communication technology) has become increasingly common in the construction industry. While you may have seen claims such as "improves work efficiency," "can compensate for labor shortages," and "leads to cost reductions," many may still be skeptical about how effective it really is in practice. ICT construction machinery is by no means a cheap investment and involves new tasks such as creating 3D data, so many site managers and executives hesitate to adopt it. However, as real-world examples show, introducing ICT construction machinery dramatically improves on-site productivity and, as a result, significantly enhances cost performance. This article focuses on how sites specifically change when ICT construction machinery is introduced, explains the key points for efficiency gains and cost reduction, and presents actual cases where implementation produced measurable effects.


What is ICT construction machinery? Background on why adoption is needed

First, let’s briefly confirm what ICT construction machinery is. ICT construction machinery is the latest type of construction equipment equipped with ICT technologies such as GPS, sensors, and 3D design data, enabling high-precision work through automatic control and monitor guidance. Tasks such as excavation and grading, which were conventionally carried out relying on the operator’s intuition and experience, can be carried out semi-automatically by ICT construction machinery using pre-created 3D data. For example, by equipping hydraulic excavators and bulldozers with 3D machine guidance (MG) or machine control (MC) functions, operators can work while checking the target shape and the current blade or bucket position on a monitor, and the machine will automatically control blade or bucket height as needed. As a result, the conventional need for batter board installation (height markers installed based on surveying) and repeated height checks is eliminated, enabling even inexperienced operators to achieve levels of precision comparable to veterans.


The spread of ICT construction machinery is drawing attention against a backdrop of chronic labor shortages and the need to improve productivity. In the construction industry, the aging of skilled workers and a decline in young entrants have become serious problems, and securing personnel has become difficult due to the image of the industry as “tough, dangerous, and dirty.” In fact, of the roughly 3.4 million construction skilled workers in the country, about 1.1 million are aged 50 or over, and it is predicted that a large number of veterans will retire over the next 10 years. Meanwhile, workers under 29 years old account for less than 10% of the total. To address this challenge, the Ministry of Land, Infrastructure, Transport and Tourism has promoted a productivity revolution called i-Construction since fiscal 2016, making full use of ICT technologies at construction sites a key pillar. Since the start of i-Construction initiatives, the number of public works projects using ICT has increased year by year, and a target has been set to improve on-site productivity by 20% by fiscal 2025. The adoption of ICT construction machinery is expected to be a trump card for improving productivity in this era of labor shortages.


Key points for on-site efficiency improvements with ICT construction machinery

How exactly does on-site work efficiency improve when ICT construction machinery is introduced? Here are the main points.


• Major efficiency gains in surveying and as-built verification work: By using ICT for pre- and post-construction surveying and as-built (as-built quantity) management, tasks that used to take a long time can be dramatically shortened. For example, by using drone-based 3D surveying, site surveys that once required several people working for several days to a week can sometimes be completed in just a few tens of minutes. Similarly, post-construction as-built measurements can be performed quickly and accurately with laser scanners or drones. What used to require dispatching a survey team to check points one by one can now measure many points in a short time with ICT, leading to significant time savings across the entire sequence from start to inspection.

• Reduction in labor for batter board installation and intermediate inspections: ICT construction machinery can directly import 3D design data into the machine, allowing the operator to always know coordinates and heights while working, so the batter board (layout marking) work that used to be essential is no longer necessary. The need for intermediate inspections such as “stop here and call the survey staff to check” is also reduced. In one manufacturer's experiment, using ICT construction machinery resulted in direct working time being reduced by about 43%. This was because time spent on setting and measuring batter boards and the operator’s fine adjustments was drastically reduced. The experiment also reported that tasks that previously required three people (one operator + two helpers) could be completed by one operator, reducing personnel by 67% (from 3 people to 1 person). In other words, ICT construction machinery not only speeds up the work itself but also dramatically increases total efficiency by reducing ancillary tasks and personnel.

• Shorter construction time and consistent quality through automatic control: The machine control functions of ICT construction machinery automate and optimize blade and bucket operations. Regardless of the operator’s skill level, the finish can match the design, reducing wasteful rework caused by over-excavation or over-filling. Achieving the targeted precision in one pass prevents extra time for recovery. Also, because even non-expert operators can work at a certain standard of quality, work does not bottleneck with specific individuals, smoothing overall site progress. With ICT construction machinery, inexperienced young workers can work efficiently, increasing flexibility in staffing and improving team-wide productivity.

• Reduced operator burden and improved safety: ICT construction machinery increases the amount of time operators work seated while viewing a monitor, and because deviations between targets and current positions are always visualized, psychological burden is reduced. There are reports that operators feel less fatigue for the same level of precision, which helps maintain concentration and reduce mistakes. In addition, because fewer people need to enter near heavy machinery for batter board installation or verification, the risk of contact accidents is reduced. Improved safety along with efficiency gains is a significant benefit for sites.


As described above, introducing ICT construction machinery can reasonably be expected to achieve about a 20–30% reduction in total process time. In fact, a report by the Ministry of Land, Infrastructure, Transport and Tourism shows data indicating that “a series of earthwork tasks from initial surveying to final inspection could be reduced by about 30% on average compared with conventional construction.” With such improvements in site efficiency, not only is schedule compression possible, but the same limited workforce can handle multiple sites in parallel, directly contributing to improved productivity across the company.


Cost reductions expected from introducing ICT construction machinery

Next, let’s look at cost effects from adopting ICT construction machinery. Improved work efficiency and shorter schedules are themselves major cost-saving factors, but specifically, the following points can be expected to reduce costs.


• Labor cost reductions: As mentioned above, ICT construction machinery often makes it possible to reduce the number of required workers. Surveying, batter board, and inspection personnel become unnecessary, and operations can be completed by a single operator, leading to lower labor costs. In a situation of labor shortage, hiring new workers or subcontracting increases costs, but by adopting ICT, more work can be done with the current workforce, mitigating the risk of rising labor costs.

• Reduction in machinery operating expenses and fuel costs: Because ICT construction machinery shortens working time, operating hours and fuel consumption for heavy equipment also decrease. Avoiding unnecessary excavation or filling—i.e., reducing over-excavation and rework—leads to lower fuel consumption. In fact, tests with ICT bulldozers reported fuel consumption reductions of about 25–30%. In addition to saving fuel costs, reduced engine running hours can extend maintenance intervals for heavy equipment, yielding lower maintenance and parts replacement costs.

• Reduction in indirect construction costs: Shorter project durations reduce indirect on-site expenses. For example, costs for temporary offices, temporary toilets, security guards, and utilities such as electricity and water accumulate by the day. By compressing the schedule through ICT use, indirect construction costs such as “common temporary construction costs” and “site management costs” can be reduced. Also, reducing construction days can shorten lease periods for machinery and vehicles, saving rental costs.

• Elimination of waste costs through quality improvement: The ability of ICT construction machinery to achieve design-level quality in one pass leads to reduced rework. Historically, costs from additional excavation/filling, repeated surveying and inspection due to poor finishes were unseen burdens. ICT construction methods make it easier to obtain high-precision as-built results from the start, cutting excess materials, labor, and time spent on defect correction. This not only reduces on-site cost losses but also improves reliability with clients, which can lead to future business opportunities and larger orders.

• Order-winning benefits from ICT utilization: Slightly different from direct cost savings, introducing ICT construction machinery itself creates economic effects from strengthened competitiveness. In public works, there is a system that grants an incentive to the estimating unit price (unit rate) for projects that use ICT, allowing a higher amount to be included in estimates. National and local governments also offer preferential measures such as adjustments to expense rates to promote ICT construction, and under certain conditions ICT construction can be more profitable. Furthermore, owning and effectively using ICT construction machinery becomes a corporate strength, making companies more competitive for the increasing number of ICT-specified projects. Companies that adopt early and accumulate know-how are more likely to be “chosen,” contributing to increased sales and profits.


Given these points, investment in ICT construction machinery should be seen not as a pure cost increase but as an investment that leads to future cost savings and revenue growth. Initial installation costs can indeed be about 1.5 to 2 times those of conventional machines in some cases, but cost recovery is fully expected through schedule compression savings and incentive-related additional income.


Examples: How much sites changed after introducing ICT construction machinery

We’ve discussed efficiency gains and cost reductions, but you might wonder, “Does it really work that well?” Here are some actual cases where introducing ICT construction machinery produced results.


• Shortened schedules: One civil construction company was able to complete a job that previously took 150 days in about 130 days after introducing ICT construction machinery (a reduction of about 20 days). At another site, they succeeded in shortening a five-month schedule to four months. Both represent roughly 20% schedule compression, and client evaluations improved. Even shortening a schedule by several weeks substantially reduces on-site management costs and gives more flexibility in coordinating other projects.

• Improved fuel efficiency: At the site mentioned above where the schedule was shortened by one month, data showed that machine fuel efficiency improved by about 30% (fuel consumption reduced by 30%) due to operational efficiency. This resulted from avoiding unnecessary idling and excessive excavation, and completing concentrated work in a short period. A 30% reduction in fuel use directly cuts operating expenses and also contributes to CO2 emission reductions, offering an environmental benefit as well.

• Increased productivity and sales: A construction company in Kagawa Prefecture actively used ICT construction machinery to shorten schedules and improve safety, and as a result, managed to double annual sales compared with before despite labor shortages. This remarkable achievement was largely due to finishing projects faster and thereby being able to accept and complete more projects with limited staff. On-site feedback included comments like “After ICT adoption, job turnover has sped up and profit margins have improved,” and such success stories have led hesitant executives to decide on additional investments.


These examples show that site productivity greatly improves, costs are reduced, and corporate competitiveness is enhanced through the introduction of ICT construction machinery. Of course, ICT construction machinery is not a magic wand; to maximize its effects, proper work planning and operator training remain essential. Nonetheless, it is clear that ICT enables far greater efficiency and labor savings compared with traditional methods and can be a significant support in today’s challenging site environment.


Conclusion: How much sites change with ICT construction machinery

Regarding the question “How will the site change if ICT construction machinery is introduced?”, this article explained with concrete examples how dramatic improvements in work efficiency and cost reduction can be achieved. In summary, utilizing ICT construction machinery can transform surveying, construction, and inspection processes, making it possible to complete projects in roughly 70–80% of the previous time and cost. In an industry facing labor shortages, long working hours, and rising costs, the effects of introducing ICT construction machinery are no longer negligible.


That said, concerns such as “high initial costs” and “operational difficulty” remain real. In such cases, starting small with ICT adoption is one option. You don’t have to immediately purchase expensive ICT-enabled heavy machinery; you can first digitize surveying tasks and experience the benefits. For example, a simple surveying system provided by LRTK allows a single person on site to perform high-precision surveying easily without specialized survey equipment or expert skills. With an easy smartphone-based system, you can quickly acquire on-site 3D data, making it an ideal first step in ICT adoption. Experiencing the digital advantages with such tools will give you a tangible sense of efficiency gains on site and build confidence for fuller ICT construction machinery adoption later. Consider introducing ICT utilization to your sites and realize the benefits of improved efficiency and cost reduction.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.