5 Methods for Obtaining Coordinates with Indoor Positioning: A Comprehensive Guide to Use Cases at Construction Sites, Warehouses, and Factories

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Table of Contents

• High-precision indoor positioning required at construction sites, warehouses, and factories

• Radio positioning using BLE and Wi-Fi

• High-precision positioning using UWB (ultra-wideband radio)

• Positioning systems utilizing ultrasonic sensors

• Vision-based positioning using cameras and LiDAR

• Position estimation using PDR (pedestrian dead reckoning)

• Key points for choosing an indoor positioning method

• Simplified surveying with LRTK changes job sites

• FAQ


High-precision indoor positioning required at construction sites, warehouses, and factories

At on-site locations such as factory production lines, logistics warehouses, and construction sites, position (coordinate) information is critically important for the placement of machinery and inventory, the optimization of workflow, and safety management. Until now, some decisions about placement and movement flows have relied on experience and intuition, but by visualizing location data with digital technologies, efforts are advancing to improve productivity and eliminate waste. In particular in recent years, demand has increased to measure the positions of objects and people to centimeter (cm) level accuracy (half-inch accuracy) even inside factories, warehouses, and construction sites within buildings.


If indoor positions can be measured with high precision, equipment can be installed during layout changes based on accurate survey data, and workers’ and forklifts’ movement paths inside warehouses can be tracked in detail to obtain hints for improving traffic flow. Fine adjustments and precision tasks that were difficult when errors were on the order of several meters can be performed accurately if cm-level positioning (half-inch accuracy) can be achieved indoors. In factory production-line improvement, warehouse inventory optimization, and quality control at construction sites, improvements in the accuracy of location information are becoming an indispensable factor.


However, obtaining coordinates indoors using GPS (satellite positioning) is not easy. Radio signals from GPS satellites are blocked by building roofs and walls, so they are rarely received indoors, and even if reception is possible, the errors can range from a few meters to several tens of meters. In other words, conventional GPS alone cannot provide practical accuracy in factories, warehouses, or construction sites inside buildings. For this reason, various technologies have long been explored for indoor positioning.


The following five methods are representative approaches for obtaining coordinates indoors.


Positioning using BLE beacons or Wi‑Fi – A method that installs multiple transmitters (beacons, etc.) indoors and estimates distance from the received signal strength at the device. It can be introduced at low cost, but accuracy is coarse—on the order of several meters—and errors tend to increase due to radio reflection and interference.


UWB (ultra-wideband) positioning – A method that uses very short radio pulses on the order of nanoseconds to perform high-precision distance measurements. It is used by installing multiple dedicated fixed anchor devices. Depending on the environment, positional accuracy can be improved to the range of several tens of centimeters to about 10 cm (3.9 in), but hardware and configuration tuning costs are high and there are barriers to deployment.


Positioning using ultrasonic sensors – A method that places multiple ultrasonic transmitters on ceilings or walls and calculates position from differences in the time of arrival of sound waves. It is less affected by obstacles, and with multiple sensors configured it can detect three-dimensional position including vertical direction. Some products claim cm level accuracy (half-inch accuracy), but dedicated infrastructure installation and prior calibration are still required.


Positioning leveraging cameras and LiDAR – A technology that estimates a device's position from the surrounding environment using camera image analysis or LiDAR lasers. It can be used without installing tags or markers in the space, but equipment can be expensive or it may be necessary to create a map of the entire building (3D scan) in advance.


PDR (Pedestrian Dead Reckoning) – A method that estimates movement from walking using accelerometers and gyroscopes built into smartphones, and sequentially calculates relative position from the starting point. It is effective over short times and distances, but errors (drift) accumulate over time and it becomes difficult to maintain accuracy over long distances.


As described above, the conventional technologies for obtaining high-precision coordinates indoors each have their own advantages and disadvantages. In particular, achieving centimeter-level accuracy has required deploying specialized equipment and making expensive capital investments. In addition, many methods focus on positioning in the two-dimensional plane (X, Y coordinates), and precise measurement in the vertical direction (Z axis) is also challenging. However, in recent years these technologies have advanced, and new approaches and combinations of methods have improved indoor positioning accuracy. Now, let’s take a slightly closer look at five specific indoor positioning methods that can be used at construction sites, warehouses, and factories.


Radio positioning using BLE and Wi‑Fi

Indoor positioning that uses radio transmitters such as BLE (Bluetooth Low Energy) beacons and Wi‑Fi access points is a relatively simple and low-cost method to deploy. Multiple beacon devices are installed in the building in advance, and the signal strength received by a smartphone or a dedicated receiver (RSSI) is used to estimate the distance to each beacon. By using distance information to multiple transmitters to determine the device's current position (coordinates), this system can provide an approximate location even indoors where GPS does not reach.


This method is used for indoor guidance in museums and commercial facilities as well as for a wide range of applications such as simple inventory location management within warehouses. For example, numbered beacons can be attached to product shelves in a warehouse, allowing a worker's smartphone app to display their current location. However, positioning accuracy is typically on the order of a few meters (a few ft), so precisely determining which position on a shelf an item is located is difficult, and improving accuracy requires additional measures. Also, because radio signals can be blocked or reflected by walls and machinery, reception may become unstable and errors may increase in environments such as factories with steel-framed structures or warehouses with densely packed shelving.


• Advantages: Low deployment cost and relatively simple configuration. Existing Wi‑Fi networks can sometimes be reused, making it easy to get started even at small-scale sites.

• Disadvantages: Positioning errors can be several meters, so it is unsuitable for obtaining high-precision coordinates. It is susceptible to the radio environment, and surrounding structures can further degrade positioning accuracy.


High-precision positioning using UWB (ultra-wideband wireless)

UWB is a wireless technology that, unlike conventional wireless in the 2.4 GHz and 5 GHz bands, transmits and receives extremely short pulse signals over a wide frequency band. Because the arrival time of pulses can be measured precisely, distance measurement has high resolution, and when used for indoor positioning an accuracy of around 10 cm (3.9 in) can be expected. Specifically, multiple UWB anchors (reference stations) are installed inside a building, a UWB tag is attached to the target to be positioned (people or machines), and the signals transmitted from that tag are received by the anchors. The tag’s position is calculated by triangulation from time synchronization among anchors and time-of-flight measurements.


Positioning using ultra-wideband is increasingly being deployed in factories and warehouses as an RTLS (Real-Time Locating System) for tracking locations in real time. For example, in manufacturing plants, UWB tags are given to workers and forklifts to visualize movements and help detect entry into safety zones and optimize work routes. In large warehouses, systems that attach UWB tags to product pallets and manage in real time which shelf and which position they are stored in have also been put into practical use. In the construction industry, there are examples of trial introductions of UWB for tracking the locations of construction machinery and materials, and cases have been reported where it was used for worker safety management at underground construction sites where outdoor GPS does not reach.


UWB is excellent in terms of accuracy, but installation costs and operational burden cannot be ignored. To achieve high accuracy, you need to place at least several anchors in the space and perform meticulous initial adjustments (calibration) for each site. Also, covering a wide area requires more anchors, which increases installation work and wiring effort.


• Advantages: Currently can achieve top-class high accuracy among indoor positioning technologies (approximately within several tens of cm (several in)) and can also support real-time tracking of moving objects.

• Disadvantages: System deployment costs are high and large-scale infrastructure is required. Installation and maintenance demand specialized knowledge, making it often unsuitable for implementation at small-scale sites.


Positioning system utilizing ultrasonic sensors

Using sound waves for positioning is also an interesting approach to obtaining coordinates indoors. Transmitters that emit high-frequency ultrasound inaudible to humans are mounted on ceilings or walls to build an acoustic localization network within the space. On the object to be positioned, a tag equipped with a microphone or sensor capable of receiving ultrasound is attached, and the arrival times and phase differences of the sound waves from each transmitter are measured to calculate distances. By doing this for multiple transmitters, the system determines position in three dimensions. Because sound waves, unlike radio waves, can diffract around obstacles even when blocked by walls, they have the advantage of being able to reach more easily in environments with many obstacles.


Ultrasonic positioning systems are considered useful in environments such as factories where machinery and metal are abundant and radio waves are prone to multipath reflections. For example, one application is attaching ultrasonic tags to transport robots on a factory floor lined with large machines to track their positions.


They are also used in indoor location management services to determine the whereabouts of people carrying active badges (tags) in hospitals and commercial facilities.


For higher precision, meticulous calibration is required, such as clock synchronization between ultrasonic transmitters and receivers and delay correction for the speed of sound. In theory, accuracy of several centimeters (cm level accuracy, half-inch accuracy) is possible, but because the speed of sound varies subtly with temperature and air flow, it is not easy to consistently maintain that cm-level accuracy in real-world on-site conditions. In addition, deployment inevitably requires physical infrastructure work, such as placing transmitters across the entire ceiling and performing wiring.


• Advantages: Usable even in environments where radio waves are difficult to measure (such as spaces with many obstructions), and, if properly deployed, can acquire three-dimensional positions including height.

• Disadvantages: Infrastructure deployment is complex and costly. Accuracy is easily affected by environmental factors, and covering a large area requires installing many transmitters.


Vision-based Positioning Using Camera and LiDAR

Technologies that estimate one's own position coordinates by utilizing sensors such as cameras (optical imagery) and LiDAR (laser scanners) have also emerged. This is a type of so-called self-localization (localization) that infers the current position from distinctive indoor visual information. For example, a smartphone or tablet camera captures the surroundings, recognizes features of walls and ceilings or affixed markers (QR codes, etc.) appearing in the images, and determines the device's position by matching them against pre-prepared indoor maps or CAD drawings. In addition, devices equipped with LiDAR sensors can determine current position and orientation with high precision by matching laser point clouds.


This vision-based approach is attractive because it does not require installing additional infrastructure such as radio transmitters. As an example, indoor navigation using AR (augmented reality) technology can recognize the current location simply by reading markers pasted on walls and display the direction to proceed in AR. On construction sites, there are applications in which workers can perform their own positioning (marking out) tasks by photographing reference markers (markers with known coordinates) attached to columns or walls with a tablet, acquiring their position coordinates, and then cross-referencing them with drawing data. In logistics warehouses, there are also systems where cameras mounted on the ceiling recognize and track AGV (automated guided vehicle) and forklifts on the floor to convert them into coordinates.


However, there are also challenges: the fact that equipment using cameras and LiDAR tends to be expensive; that it is affected by environmental conditions such as lighting and dust; and that high-precision positioning requires prior preparation, such as creating a 3D map of the entire building and placing markers. For example, introducing a LiDAR-equipped surveying robot can achieve high-precision maps and self-localization, but scanning and preparing maps for vast areas exceeding several hundred square meters is a tremendous effort. In addition, when the environment changes the maps must be updated, and in dynamic sites such as construction zones operation can become difficult.


• Merits: With a marker-based approach, positioning can be achieved using relatively inexpensive printed materials, and special radio devices are not required. In certain distinctive environments, combining geomagnetism and other cues can also enable stable positioning in some cases.

• Demerits: Sensor equipment tends to be relatively costly, and preparing the environment and performing calibration is time-consuming. In indoor sites where the layout changes significantly, maps must be updated each time.


PDR (Pedestrian Dead Reckoning) Position Estimation

PDR (Pedestrian Dead Reckoning) is a method of estimating the current position by accumulating the number of steps taken and the directions walked. An accelerometer built into a smartphone or a dedicated device senses footstep vibrations during walking and counts steps, while a gyroscope and a magnetometer detect changes in the direction of travel. From this information, the relative position is calculated — for example, "moved east by how many m (how many ft), and north by how many m (how many ft)" — and the current coordinates are updated sequentially. When used indoors, if an initial known start position is set (for example, the entrance on a floor plan), the approximate location reached within the building can be estimated even without GPS.


PDR alone is doomed to have its estimated position gradually drift over time (errors accumulate). However, it is quite useful for short-duration, short-distance movement and is sufficiently helpful as a simple indoor positioning method when no other means are available. For example, when conducting patrol inspections in a large factory, you can pre-register the locations of each piece of equipment on a map and navigate to inspection points by tracking the movement trajectory from the patrol start position using PDR. In practice, PDR is often used in combination with other methods, with measures such as correcting the current location with BLE beacons at regular distance intervals or mitigating drift by matching geomagnetic patterns.


In addition to pedestrians, there are also applications (vehicle navigation) that use sensors to measure wheel movement on forklifts, carts, and the like to calculate traveled distance. However, these too cannot avoid the accumulation of errors, and over long durations or distances they will inevitably diverge from the actual position, so periodic re-calibration is necessary.


• Advantages: A simple approach that can be used with only existing smartphones, allowing position estimation without special infrastructure for short-distance, short-duration movements within a confined area.

• Disadvantages: Errors increase over time, so it is unsuitable for applications that require maintaining absolute coordinates over long periods. It is often necessary to use it in combination with other positioning methods.


Points for choosing an indoor positioning method

As introduced above, there are various methods for measuring coordinates indoors. Because each has different strengths and weaknesses in terms of accuracy, cost, and operational aspects, it is important to select a method that matches your company's use case and on-site environment. The points to pay attention to when choosing are summarized below.


• Required accuracy and real-time capability: The options change depending on whether centimeter-level accuracy (cm level accuracy, half-inch accuracy) is essential or meter-level accuracy is acceptable. If you need to track people or objects in real time, UWB or camera-based systems are candidates; for surveying specific points, RTK or marker-based positioning are options.

• Implementation and maintenance costs: If budget is limited, approaches that leverage BLE beacons or existing Wi‑Fi are realistic. On the other hand, if you prioritize accuracy and adopt UWB or LiDAR positioning, a substantial investment will be needed for anchor installation and equipment purchase. There are also solutions like LRTK that are infrastructure-work-free instead of using dedicated devices.

• Site environment and infrastructure: At sites where there are constraints on where anchors or sensors can be installed, you need to choose a method that works under those constraints. For example, in warehouses with very high ceilings ultrasonic sensors’ output may not reach, and in factories with many steel frames BLE or UWB radio signals can be prone to interference. Conversely, if workers can carry smartphones, mobile-device-centric schemes such as PDR+beacons are appropriate.

• Operational burden: Consider whether marker replacement or anchor equipment maintenance will be required after deployment, or whether operation will require specialized staff on site. Large-scale sensor networks tend to increase operational workload in exchange for improved accuracy. Meanwhile, simple approaches that only require a smartphone app impose less burden on the site and are easier for the responsible personnel to handle.

• Use of positioning data: Also consider how you will utilize the acquired coordinate data. For example, if you want to use it for asset management as point-cloud data, LiDAR measurement will be necessary; if you only need to visualize current positions, BLE may be sufficient. Including cloud integration and data compatibility with other systems, it is important to choose a method aligned with your company’s DX (digital transformation) plan.


Depending on the site, it can also be effective to use multiple methods in combination. For example, you might typically obtain a coarse position with inexpensive beacon-based positioning, and measure at important points with high-precision devices—a hybrid approach like this can be considered. Identify the requirements and constraints, and consider the optimal method or combination of methods.


How Simple Surveying with LRTK Is Changing Worksites

The smartphone-linked RTK positioning device "LRTK", which has emerged in recent years, is bringing a new surveying option to on-site operations such as factories and construction sites. Traditionally, obtaining precise coordinates at the centimeter level (cm level accuracy, half-inch accuracy) required hiring a nationally certified surveyor or preparing expensive equipment such as total stations and performing specialized operations. However, with simple surveying using LRTK, on-site personnel themselves can complete measurements of the required points in a short time.


For example, when changing a factory layout, tasks that used to require requesting measurements from an external surveying company can be handled immediately within the responsible department if LRTK is available. With a small LRTK device attached to a smartphone, you position outdoors (in a place where the sky is visible) for several tens of seconds to fix a high-precision position, then enter the building and simply press the record button at the point you want to measure to acquire coordinates. If you attach the LRTK device to the tip of a monopod (pole), one person can take stable measurements. The app automatically calculates height corrections for measured points, so no difficult knowledge is required. Without complex base-station installation or prior calibration work, the convenience of being able to start measuring as soon as you arrive on site can be described as revolutionary.


By enabling on-site staff to conduct surveys themselves, the speed of decision-making will also improve dramatically. Effects of layout changes and checks on construction progress can be captured as accurate data on the spot and analyzed immediately. Because measurements can be repeated as needed, flexible responses to changes in conditions are also easy. Such an increase in operational agility will accelerate the PDCA cycle at production sites and in construction projects, and contribute to improved competitiveness.


Furthermore, simplified surveying using LRTK offers significant cost advantages. Once you have the device and a smartphone, there are no additional costs for subsequent measurements (no communication charges are required because correction signals from satellites are used). You can reduce surveying costs that were previously outsourced, and because you can measure immediately when you want, there is no waiting time. The initial investment is also far lower than introducing large, stationary surveying equipment or other fixed indoor positioning infrastructure.


By adopting a new approach that combines smartphones and LRTK, site management at factories, warehouses, and construction sites will be significantly updated. The more a site has struggled with issues like "we wanted to measure but couldn't" or "we were plagued by positional errors," the more simple surveying with LRTK will become a powerful ally. If you can freely obtain on-site location information yourselves without relying on specialist contractors, the possibilities for improving the site will expand dramatically. If you're interested, please check the details of LRTK on the [official site](https://www.lrtk.lefixea.com/lrtk-phone).


FAQ

Q. What method provides the highest accuracy for indoor positioning? A. At present, positioning methods that apply UWB or RTK-GNSS achieve top-class accuracy. Properly deployed UWB can keep errors to 10 cm (3.9 in) or less, and by combining RTK-GNSS with AR technologies as in LRTK, you can obtain the coordinates of specific points with an accuracy of a few cm (a few in). However, because the implementation hurdles are high, it is advisable to consider them only in cases where true cm level accuracy (half-inch accuracy) is required. Conversely, if applications can tolerate errors of several meters (several ft), low-cost methods such as BLE beacons or Wi-Fi positioning may be sufficient.


Q. Can you perform surveying with a smartphone? A. Yes, by combining the latest smartphones with a dedicated device, even non-specialists can obtain coordinates with near-surveying accuracy. For example, if you attach an LRTK device to a smartphone and use it, high-precision RTK positioning becomes possible, allowing you to measure the location of points with centimeter-level accuracy (half-inch accuracy) even inside buildings. By leveraging the smartphone's camera and AR capabilities, you can also easily visualize positioning results on site and cross-check them against drawing data.


Q. If I want to keep the introduction cost of a positioning system low, which method is suitable? A. If cost is the priority, methods that can start with relatively inexpensive equipment such as BLE beacons or Wi-Fi positioning are suitable. Each of these devices can be introduced from around a few thousand yen, and you can gradually expand coverage as needed. However, their accuracy is limited, so it’s a good idea to introduce them on a trial basis first to confirm whether they meet your objectives. Dedicated RTK devices such as LRTK require purchasing equipment, but they do not require installation work and have low operating costs, so consider them while balancing positioning accuracy and initial costs.


Q. How can indoor positioning data be used to improve on-site operations? A. First, it is important to store the measured coordinate data digitally and set up an environment where it can be visualized and analyzed. Using cloud services or dedicated software, for example, you can display inventory locations within a warehouse on a map or trace the movement paths of people and vehicles in a factory and convert them into heat maps to identify bottlenecks and wasteful movements. With an LRTK system, you can sync the coordinates of points and photos captured with a smartphone to the cloud and overlay and share them with 2D maps or 3D models in a browser. By leveraging such platforms, you can enable anyone on site to discuss and propose improvements based on location information.


Q. Can LRTK be used without any special knowledge? A. Yes. LRTK is designed to be operated without specialized knowledge. Simply attach the device to your smartphone and launch the dedicated app to begin high-precision positioning. During positioning, the app screen displays the current accuracy and satellite acquisition status, so even first-time users can easily grasp the situation and feel reassured. Equipment setup only requires mounting it on a pole and standing it level, with no difficult adjustments needed. Tutorials and support systems are also in place, so site staff and those without surveying experience can use it for field measurements after a short briefing.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page