One Person Can Drive Stakes! Achieving Both Labor Savings and Centimeter-Level Accuracy with Smartphone RTK Surveying
By LRTK Team (Lefixea Inc.)
Current Status and Challenges of Pile Driving Work
In construction sites, pile driving work requires driving piles accurately to the positions specified in the design. However, traditional pile position layout relied entirely on surveying specialists, and sites faced several challenges. First, surveyors determine positions from coordinates on drawings using tapes and optical instruments, then mark the ground (make marks) or drive wooden stakes as markers — this work is time-consuming and labor-intensive. During this work, other processes often stop and become "waiting for surveying", which reduces overall productivity. Furthermore, the problem of reliance on specific individuals is significant, as it depends on the skills and experience of experienced surveyors, so amid labor shortages there is the concern that placements cannot always be made at the optimal timing. In practice, confirmation of pile positions and marking relies heavily on the experience of the person in charge, and the work tended to concentrate on specific individuals.
Traditional methods also harbor accuracy-related risks. If poor communication between the surveyor and the workers causes misalignment, or if installed reference stakes or markings are lost or moved due to the passage of heavy machinery, those errors affect construction accuracy as stake position deviations. Also, in places such as slopes (embankments) and waterfronts—where it is physically difficult to install reference markers—accurate layout was inherently difficult. In narrow urban sites and underground work where visibility is poor, surveying with conventional total stations requires repositioning the equipment and two-person teams, thus demanding time and manpower. To ensure accuracy, large sites require caution such as double-checking by multiple surveying teams, and the reality has been that considerable effort has been expended. Even so, it is difficult to completely prevent human error, and preventing staking mistakes has been a major source of pressure for site managers.
Solutions that equip heavy machinery with dedicated GPS machine-guidance devices, allowing operators to check their positions themselves, have begun to appear, but because they are extremely expensive and have a high barrier to implementation, they have not spread to small and medium-sized sites. Ultimately, many construction sites cannot achieve both ensuring pile-driving accuracy and efficiency, and there is a growing awareness of the issue: "Is there any way to make pile-driving guidance more accurate and faster?"
Solutions Brought by Smartphone RTK Surveying
One solution attracting attention as a key to solving these issues is smartphone surveying that utilizes RTK positioning technology. RTK (Real Time Kinematic) is a technology that corrects errors in satellite positioning such as GPS in real time using correction information from a base station, enabling positions to be determined with an accuracy of several centimeters (cm level accuracy, half-inch accuracy). In other words, it is a "ultra-high-precision GPS usable on-site," and it makes it possible to match the coordinates on design drawings exactly with positions on the ground. For example, if you set the coordinates of the point where a pile should be driven into an RTK-compatible device, you can simply set up the pile-driving machine according to the position indicated by that device and achieve markedly less positional deviation in piling than before.
By incorporating RTK-based coordinate guidance, a major advantage is that steps such as intermediate layout marking and temporary stake installation can be omitted. Until now, surveyors used tape measures and transits to determine pile positions and workers relied on those marks to install piles, but with RTK positioning you can navigate directly to the target point on the survey data, eliminating the need for survey staff to mark the site. As a result, anyone can identify and guide to pile positions with the same level of accuracy, reducing reliance on the intuition and experience of skilled workers. For heavy equipment operators as well, if a receiver mounted on the machine or pile allows them to see in real time the offset between their position and the target coordinates, they can align from the safe operator’s cab without waiting for signals from ground personnel. RTK positioning technology can thus perform real-time and high-accuracy navigation to pile-driving positions, and is bringing a small revolution to pile-driving guidance.
In recent years, smartphone RTK surveying, which enables this RTK positioning to be used more easily on-site, has begun to emerge. Smartphone surveying, as the name implies, is a method of using a smartphone as a surveying instrument, and by simply attaching a dedicated compact RTK-GNSS receiver to a smartphone, centimeter-level positioning becomes possible. For example, a device called "LRTK Phone" developed by a startup from Tokyo Institute of Technology functions as a pocket-sized surveying instrument simply by attaching a slim receiver weighing about 165 g to a smartphone with one touch. Precision positioning that used to require expensive stationary equipment can now be achieved with only a small additional device per smartphone. This makes the era in which each field worker can carry a "one device per person" high-precision positioning unit imminent.
The smartphone RTK surveying system (LRTK) provides unprecedented convenience not only through its intuitive operability but also through its abundance of additional functions. On the dedicated app screen your current location and the target point are displayed, and you are guided to the designated position simply by following arrows and distance guidance. As you approach the target, a crosshair target and a display such as "○ cm (○ in) remaining" appear on the screen, supporting even the final fine adjustments. The mechanism that allows anyone to place a stake at an accurate coordinate just by following the on-screen guidance—without complex surveying knowledge—can truly be called coordinate guidance that anyone can use.
The feature that visualizes stake positions in the smartphone camera view using AR (augmented reality) to visualize stake positions is also noteworthy. Even in locations where you cannot drive an actual stake into the ground, you can place a virtual "AR stake" on the smartphone screen and indicate "a stake is here," so, for example, on concrete-covered floors or in dangerous, inaccessible areas you can virtually confirm stake positions from a safe location. AR stakes have made it possible to guide stake placement in situations that were previously impossible.
Furthermore, the smartphone RTK app can upload acquired coordinate data to the cloud on-site and easily share in real time with the office or other teams. Positioning results and photos are automatically linked with high-precision location information, making report preparation and as-built record keeping smooth.
In this way, smartphone × RTK surveying simplifies the stakeout positioning tasks that had previously been subjective and cumbersome, and dramatically improves accuracy. So what kind of changes actually occur on-site when it is implemented?
Changes at the worksite resulting from implementation: reduced manpower, faster operations, improved accuracy, and enhanced safety
By introducing a smartphone RTK surveying system to the worksite, you can gain the following significant benefits.
• Reducing manpower in construction (personnel reduction): Because surveying and stakeout work that traditionally required two or more people can be completed by a single person, the required personnel can be reduced. For example, stake positioning that used to be done by a surveyor and a worker as a pair can be performed by one worker using a smartphone. Eliminating the need to call a specialized surveying team each time also removes setup waiting time, allowing work to proceed efficiently even on sites experiencing labor shortages.
• Significant increase in work speed: Thanks to guidance from RTK and AR, the time required for staking out pile positions is dramatically reduced. In actual comparisons, there are reports that staking with the new GNSS×AR method was completed in about one-sixth the time of conventional optical surveying. There are cases where marking pile positions that used to take half a day can be finished in about an hour, and because surveying is no longer a bottleneck, this leads to a shortening of the overall construction schedule. Movement to the next point and position adjustments are also guided on-screen with no wasted motion, greatly reducing waiting time due to rearranging work steps.
• Improved construction accuracy: Because positioning errors consistently stay within centimeter-level positioning errors (cm level accuracy (half-inch accuracy)), you can minimize pile positional deviation to the greatest extent. Previously, human error and equipment limitations carried the risk of errors of a few centimeters to several tens of centimeters (a few in to several dozen in), but RTK-enabled systems can minimize the gap between design coordinates and actual pile positions. Even in foundation work that drives many piles, it becomes easier to prevent impacts on structures caused by the accumulation of individual errors, improving quality and safety. Reducing re-surveying and re-marking decreases rework caused by mistakes and helps reduce the burden of quality control.
• Improved safety: Introducing smartphone RTK also improves work safety. This is because it reduces the number of times people need to enter hazardous areas for surveying. For example, stake positions on steep slopes can be checked via an AR display from a safe foothold, so workers no longer need to force themselves into dangerous spots. It also reduces instances of people approaching heavy machinery to guide operations; operators can make adjustments while looking at the screen, lowering the risk of contact accidents. Shorter work times also help reduce the risk of heatstroke and accidents. In this way, the use of the latest technology contributes to both labor savings and ensuring safety.
Applications beyond stake-out — Multipurpose smartphone surveying
Smartphone RTK surveying can be used in many situations beyond stake-out guidance. Introducing a single system can rapidly accelerate on-site DX (digitization). Below are some of the main application areas.
• General positioning and layout marking: It can be used as-is for various positioning tasks other than pile driving, such as locating building foundations and the placement of structures. If you import the drawing’s coordinate data into a smartphone, it will guide you to the necessary points on site, simplifying the processes of layout marking and batter-board setup that previously relied on the survey crew. Because any layout shape can be managed with digital coordinates, if changes occur later you can quickly remeasure and re-mark.
• Use in special construction such as top-down construction: In underground urban works that adopt the top-down construction method, advanced surveying control is required because surface and underground work must be carried out in parallel within limited space. The smartphone RTK's high-precision AR navigation demonstrates its power even under difficult conditions like top-down construction. Even in underground spaces where visibility is blocked by upper slabs or beams, it can receive satellite correction information through small openings or gaps in the slab and pinpoint the pile center location with arrow guidance on the smartphone screen. Even on narrow sites hemmed in by surrounding high-rise buildings, smartphone guidance can guide users directly to positions right up against adjacent structures. There have been reports that precise pile positioning, which formerly required survey teams to re-measure and double-check multiple times, can be completed in a single guided operation after introducing smartphone AR navigation. Not limited to top-down work, smartphone RTK is playing an active role as a new solution in situations that require high-precision, confined-space surveying.
• Construction verification and inspection using AR: The AR functionality of smartphone RTK systems can be applied not only to guiding pile positions but also to on-site verification and inspection during construction. For example, by importing 3D model data from design drawings into a smartphone and overlaying it on the site view, you can share the envisioned finished state on the spot. If you AR-display the design model on the completed structure, you can visually check whether it has been constructed according to the design. It has become practical for construction managers to patrol the site with a smartphone in hand and use AR to verify that the positions and inclinations of columns and walls do not deviate from the model. Remote walkthrough-style uses are also expected, such as conveying the current site conditions via AR footage to remote clients or designers to build consensus. Smartphone-based AR inspection is a new method that makes it easier to discover discrepancies between drawings and the actual site on the spot, helping quality control and preventing rework.
• As-built management and point cloud measurement: Smartphone RTK is also a powerful tool for as-built management (post-construction verification of shape and dimensions) after pile driving. If you measure and record pile heads and structure positions with the same device immediately after driving the piles, data collection for as-built inspections is completed right away. Furthermore, if you perform point cloud scans (3D measurement by photogrammetry) using the smartphone’s built-in camera or optional equipment, the completed object's three-dimensional model can be saved in the cloud and used for as-built documentation. Because all acquired point clouds and survey points are assigned high-accuracy coordinates, checks of as-built dimensions, which previously required separate surveys, can be managed digitally in one place. Cloud-stored data can also be used for future maintenance, and the surveying data accumulated from construction becomes an asset for the entire lifecycle.
Thus, smartphone RTK surveying, using stakeout work as the entry point, has the potential to broadly cover existing-condition surveying→construction→inspection→maintenance and management. It is also worth noting that introducing just one system can promote digitization and labor savings on site in many ways.
Why the barrier to adoption is low
The latest smartphone RTK surveying systems are advanced technology, yet one of their attractions is that the barrier to adoption is extremely low. Here are a few reasons.
• Compact, lightweight, and highly portable: The smartphone-mounted RTK receiver is palm-sized and lightweight at just a few hundred grams, compact enough to fit in a pocket. It doesn’t require bulky tripods or fixed mounts, so you can operate it one-handed while moving around the site. With a built-in rechargeable battery and minimal wiring, setup doesn’t take long. Because of this, you can take it anywhere and use it whenever, allowing you to start surveying immediately when needed, which is convenient.
• Low cost and easy to implement: Traditionally, GNSS equipment with centimeter-level accuracy required an investment on the order of several million yen. By contrast, smartphone RTK surveying devices are offered at a very low cost, making one-device-per-person deployment a realistic option. We are shifting from an era when high-precision equipment was shared by a team to one in which each worker can have their own dedicated device. Because the cost burden is small, it is easy for small and medium-sized enterprises and small-scale construction projects to adopt them, allowing the benefits of the latest technology to be enjoyed broadly across the industry.
• Easy to master with a smartphone UI: The device used is the smartphone people are accustomed to using every day, so it can be operated intuitively without special training. The app is displayed in Japanese and has a simple interface, so even first-time users won’t get lost if they follow the guide. There are cases where elderly veteran workers feel uneasy about operating IT equipment, but once they actually try it, they often evaluate it as easier than expected. Some training time is required when introducing it on-site, but thanks to AR screens that can be used like a game and simple button operations, the learning cost is kept very low. The low psychological barrier of “If I can do it on my smartphone, I’ll give it a try” is another factor that promotes adoption.
• Smartphone RTK can utilize the electronic reference point network operated by the Geospatial Information Authority of Japan and the correction information (CLAS) provided by Japan's Quasi-Zenith Satellite System (Michibiki), so high-precision positioning is possible without installing a dedicated base station. It has the versatility to be used anywhere nationwide as long as there is network coverage, and in areas where communication is difficult, such as mountainous regions, positioning can be maintained by receiving Michibiki signals. In other words, by fully leveraging existing positioning infrastructure, an environment is increasingly being put in place that allows anyone to easily start centimeter-level surveying (cm level accuracy, half-inch accuracy).
Summary
Traditionally, the challenges of "labor", "time", and "accuracy" in pile-driving work have been greatly improved by a new approach called smartphone RTK surveying. Without relying on specialized surveying teams, each on-site worker can effectively use centimeter-level position information (cm level accuracy (half-inch accuracy)), and an era in which both improved pile-driving accuracy and increased productivity can be achieved simultaneously is imminent. Of course, there are constraints specific to satellite positioning (instability in environments where signals cannot reach) and handling precautions for the equipment, but these can be sufficiently covered by establishing appropriate operational rules and backup measures. Overall, construction guidance that combines RTK positioning and smartphones has the potential to become a new standard on future construction sites.
A smartphone RTK surveying system that allows a single person to accurately perform pile driving is a groundbreaking solution that responds to on-site needs for both labor reduction and high precision. In fact, voices from the field have begun to say, "Work has become dramatically more efficient" and "We can never go back to conventional surveying." Make good use of smartphone surveying technology that overturns previous assumptions, and let’s advance the creation of job sites where anyone can carry out high-quality construction without mistakes. Smartphone RTK solutions, including LRTK, are introduced in detail on official websites and the like. If you are interested, please look them up. Why not adopt cutting-edge technology and take your job site to the next level?
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.