Anyone Can Do It Easily! The Era of Accurate Staking and Layout Marking with Smartphone Surveying Has Arrived

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Challenges of traditional stake setting and layout marking work

Stake setting work on construction sites (installation of survey stakes) and layout marking work (marking reference lines and positions) are essential processes for accurately constructing structures. However, conventional methods have had many issues.


Typically, surveyors determine positions on site based on coordinates from design drawings, using tape measures and optical surveying instruments (such as total stations), and indicate them by marking the ground with chalk or stakes. This method is time-consuming and labor-intensive, and is also prone to human errors.


For example, determining pile-driving positions requires two or more people, with one person operating the surveying instrument and another holding piles or a measuring rod to guide the process. If errors in establishing survey points or layout-marking mistakes occur, rework will delay the construction schedule. Also, on sites with complex terrain or poor visibility, there are limits to conventional visual methods and surveying instruments for positioning, making it difficult to drive piles efficiently and with high precision. Installing batter boards (temporary structures for layout marking) used in foundation work is also labor-intensive, and installation itself can be difficult on narrow sites or in urban areas. In this way, traditional pile driving and layout marking were tasks that required time and manpower and inevitably relied on skilled techniques.


Innovation on Site with Smartphone RTK Surveying and AR Guidance

In recent years, one innovative technology attracting attention for solving these kinds of problems is RTK surveying using smartphones and AR guidance. RTK (Real Time Kinematic) is a real-time, high-precision positioning technique using GNSS (satellite positioning); by correcting the errors between two receivers—the base station and the rover—it can determine positions with errors within a few centimeters (within a few in). Even layout work that traditionally required skilled surveyors can be performed by anyone once RTK enables centimeter-level positioning (cm level accuracy, half-inch accuracy), allowing them to drive stakes into the targeted coordinates.


By combining a smartphone camera with AR (augmented reality) technology, design points and reference lines can be overlaid on live site footage to intuitively guide workers. Because arrows and distances to the target point are displayed on the smartphone screen in real time, there is no need to rely on intuition based solely on ground markings as before. As a result, construction accuracy is dramatically improved, and rework caused by misalignment of pile-driving positions and layout marking mistakes is greatly reduced. Being able to always build at the correct position helps ensure the overall quality of structures, and this RTK×AR-enabled smartphone surveying technology is becoming indispensable at many sites.


At the same time, this technology also transforms the work process itself. Because it can simplify procedures such as preparing specialized surveying equipment and painstakingly marking out lines with multiple people, it also contributes to significant improvements in work efficiency and alleviating labor shortages. In fact, there are reports that using an AR pile-driving system with GNSS reduced the time required to set pile positions to about 1/6 compared to traditional optical surveying methods. This is due to the ability for one person to sequentially survey and set multiple points, as well as efficiencies in movement and setup. The combination of smartphone RTK surveying and AR guidance is making the coexistence of high accuracy and high efficiency a reality on-site.


Mechanism that enables pile-center guidance and layout marking with a single smartphone

So how exactly are pile-driving guidance and layout marking performed using a smartphone? Let’s look at the mechanism. The key is a compact, high-precision GNSS receiver attached to the smartphone and a dedicated app. When you attach a GNSS receiver weighing a few hundred grams to the smartphone, the smartphone is quickly transformed into a high-precision surveying instrument. This receiver provides the smartphone with the coordinates of the current position fixed by the RTK method, and the app performs real-time position guidance.


Coordinate-guided navigation allows you to import the design coordinate data of the construction site into the app in advance and select the point you want to be guided to. The smartphone screen then displays an arrow indicating the direction from your current location to the target point and the distance, and the worker simply follows those directions to approach the desired position. As you get closer to the target, the arrow indicates finer directions and the distance display is updated down to centimeter units (in). This guides you through the final fine adjustments, so alignment of the "pile center" (center of the pile), which previously relied on the intuition of experienced workers, can now be performed digitally and accurately. By simply holding one smartphone while moving, you can tell at a glance how far and in which direction you are offset from the target coordinates.


Next, the feature of AR-based stake display is also a major characteristic. You can overlay virtual objects such as stakes and markings at target points on the live site imagery captured by the smartphone camera. For example, even on concrete pavement where you cannot drive stakes directly into the ground, or in hazardous or restricted areas, you can place a virtual "AR stake" at that location on the screen. This allows you to visually confirm the position where a stake should be from a safe distance. Similarly, you can project building corners and the shapes of structures in AR to visualize layout lines. Because the smartphone’s position and orientation are determined with high accuracy, the AR display does not shift as the user moves, and the virtual stakes and lines remain fixed at the correct positions.


In pile-driving guidance using a smartphone, recording and sharing are also automated. Once you reach the target coordinates and install and mark the pile, you check that point as complete in the app. The measured coordinates and photos of the location are then instantly saved to the cloud and recorded along with the date/time and the operator's name. This eliminates the need to manually record on-site pile-driving and layout marking information later or to compile it into reports. Because the data is uploaded to the cloud, managers in the office and other team members can share information in real time. As described above, by using a single smartphone and a dedicated app, the entire process — from guiding pile centers to positioning and recording — can be completed digitally.


Benefits That Bring Labor Savings and Increased Precision

The benefits of smartphone RTK surveying and AR-guided stake placement are manifold. Here, we will outline the main points.


• Dramatic improvement in surveying accuracy: Centimeter-level positioning using RTK and AR guidance minimizes deviations in pile-driving and layout-marking positions. Conventionally, positional accuracy depended on workers' experience and visibility, but this technology enables consistently high construction quality. By reducing pile-position errors, rework in subsequent processes and the risk of structural deformation are also reduced.

• Significant increase in work efficiency: A single worker can complete everything from surveying to stake driving with a smartphone in hand, making work with a small crew possible. Because survey teams and assistants are not required, the burden of arranging personnel is reduced, leading to lower labor costs. Furthermore, movement and setup between points become smoother, and the number of layout points that can be processed in a day increases dramatically. As mentioned above, in one on-site comparison the working time was reduced to about one-sixth, so the cost-saving effect from shortened construction periods can be very large.

• Real-time record sharing and traceability: By automatically saving data to the cloud, pile position information and photographic records obtained on site can be shared instantly with office staff and other crews. This advances visualization of progress and eliminates reporting and communication time lags. In addition, because records of when, who, and where piles were installed are retained, it also contributes to improving traceability (the ability to trace) in construction management. Compared with relying on paper survey field books, the accuracy and efficiency of data management are dramatically improved.

• Safety and improved environmental adaptability: Because fewer personnel are required, the number of workers entering the vicinity of operating heavy machinery is reduced, enhancing safety. Also, by using AR to display virtual stakes, there is no need to force work at heights or on unstable scaffolding. Even in low-visibility conditions such as at night or in underground spaces, positioning guidance can be provided by combining GNSS and inertial measurement, so there is the advantage of stable positioning and guidance in all environments.

• Cost reduction and labor savings: As a result of the above improvements in accuracy, efficiency, and safety, this leads to overall cost reductions. Simplifying surveying processes reduces outsourced surveying expenses and the costs of rework, and being able to hand over projects with shorter construction periods provides economic benefits to both the client and the contractor. Also, by lowering dependence on skilled technicians and enabling flexible personnel allocation, it becomes one solution to the labor shortage facing the construction industry.


In this way, a smartphone-based pile-driving guidance system achieves both quality and productivity, and the added value it brings to the site is very significant.


Practical application examples in actual construction scenes (road construction, residential foundations, boundary stakes, etc.)

So, let's look at some representative use cases to see exactly what kinds of on-site situations this smartphone surveying technology can be useful for.


• Road construction: It is used for staking along the road centerline, curb locations, and property boundaries. Based on coordinate data from design drawings, it can accurately lay out the pavement finish lines and the positions of drainage structures. Traditionally, batter boards were set at the roadside to indicate elevation and width, but with smartphone guidance the cumbersome batter boards can be omitted, and there are cases where heavy equipment operators themselves followed on-screen guidance to perform cutting and filling to the prescribed lines. This allows staking and layout marking to be carried out quickly even on narrow road construction sites, and improves safety.

• Foundation work for houses: It is also effective for the layout setting-out tasks that form the foundation of detached houses and buildings. The building placement and the locations of columnar-improvement and pile foundations need to be indicated accurately on site, but with smartphone RTK surveying you can stake out the corner points from the drawings by yourself. Even in tight sites where conventional layout marking would be difficult, AR can project the foundation shape and allow marking on the ground, enabling rapid and error-free layout marking. As a result, foundation rework is reduced, improving overall quality of house construction and shortening construction schedules.

• Boundary Stake Installation (Surveying): Useful for confirming land boundaries and for setting sectioning stakes. If you load known boundary coordinate data into the app in advance, then on site you simply follow the smartphone guidance to drive in the boundary stakes. Even in mountain forests or large properties, the direction and distance to the target point are displayed, eliminating the cumbersome work of squinting at survey maps and checking angles with a compass. Because even new staff can accurately locate boundary points, the efficiency of land surveying and boundary confirmation improves dramatically. Such boundary stake installation work has traditionally often been outsourced to specialist surveyors, but if your company can handle it easily in-house it can also contribute to cost savings.


In addition to the above, smartphone-based stakeout and layout marking are being used in a wide range of situations, such as positioning pier piles in bridge construction, marking excavation lines for water and sewer and telecommunication cable installation works, and guiding the extents of embankment and excavation in civil earthworks. The Ministry of Land, Infrastructure, Transport and Tourism-led i-Construction (ICT construction) movement has also been a tailwind, and this approach has been adopted at various sites, from large general contractors to small and medium-sized construction firms.


Easy operation anyone can handle, labor reduction, and educational benefits

One of the advantages of stakeout guidance using smartphone surveying is its "ease of use" that anyone can handle. Even without being a surveyor with specialized training, by simply following the guidance displayed on the smartphone screen accurate positioning can be achieved, allowing all site staff to participate in surveying. The app's design, which prioritizes intuitive operation, enables everyone—from young newcomers to seasoned veterans—to use it without resistance. Especially since smartphones themselves are tools people are accustomed to using daily, a major advantage is that there is no need to "learn how to use surveying instruments from scratch."


Traditionally, pile-driving and layout marking have relied heavily on the know-how of experienced technicians, making them tasks prone to becoming person-dependent. However, with the power of smartphones and digital guidance, standardization of work can be achieved, allowing anyone to deliver the same high level of accuracy. This directly contributes to more efficient skills transfer and training. Because even newcomers can achieve results comparable to veterans, the time required for OJT can be shortened, easing the burden on sites in terms of personnel development. In actual large-scale projects, there are cases where multiple surveying teams each measure the same pile positions and cross-check them in a cautious double-check system, but high-precision positioning and digital records may make it possible to omit such duplicate work while ensuring reliability.


Furthermore, advancing labor-saving measures contributes to improving the overall operational utilization rate of the organization and to work-style reform. Because even with limited personnel the latest technology allows efficient on-site operations, it can also lead to improvements in labor conditions such as securing two days off per week and reducing overtime. As described above, the introduction of smartphone RTK surveying not only eases a single work process but also holds the potential to change the productivity of the entire site and the way human resources are utilized.


Start Smartphone Surveying Easily with LRTK

High-precision surveying and stake-placement guidance using smartphones bring significant benefits to construction sites, and among these, the smartphone surveying system LRTK, developed by Refixia, a spin-off venture from Tokyo Institute of Technology, is attracting attention. LRTK is an all-in-one solution that transforms a smartphone into a positioning device with centimeter-level accuracy (half-inch accuracy) by attaching a dedicated ultra-compact GNSS receiver, the "LRTK Phone," to an iPhone or iPad. Its flexibility is notable: a single smartphone can handle surveying, point cloud scanning, stake-placement coordinate guidance, layout marking, photo documentation, and even AR display of 3D design data.


There is no need to prepare bulky equipment or dedicated controllers like those required by conventional high-precision positioning devices, and at only about 165 g in weight it is compact enough to fit in a pocket (pocket-sized compactness) and easy to carry. It is also kept very reasonably priced compared with conventional systems, making a new style in which workers each carry and use their own device (each worker carries one device) possible. It can truly be said to be opening up an era of "one surveying instrument per person" on the worksite.


A major attraction of LRTK is that it provides the previously introduced coordinate navigation function and AR stake display function with a high degree of refinement. The smartphone navigates toward target coordinates registered in the cloud with centimeter-level accuracy (cm level accuracy (half-inch accuracy)), allowing even beginners to identify points without hesitation. Because it supports alignment down to the last few centimeters (a few in), the final adjustments for stake setting are always perfect. In addition, AR visual guidance helps on-site understanding and makes it possible to share the as-built image with stakeholders on the spot. Acquired data is automatically linked to the LRTK Cloud, so everyone on site can proceed with work while checking the latest information.


Currently, with trends in construction DX such as i-Construction promoted by the Ministry of Land, Infrastructure, Transport and Tourism, smartphone surveying technologies like LRTK are rapidly increasing their presence within the industry. These technologies, which can achieve both high-precision construction and improved efficiency, bring significant benefits to both clients and contractors and are expected to become a new standard on construction sites in the future. Why not take this opportunity to consider adopting LRTK, the latest smartphone surveying system? By gaining centimeter-level positioning guidance (cm level accuracy, half-inch accuracy) and intuitive AR-based work support, the era in which anyone can easily and reliably perform pile driving and layout marking will become a reality.


For more details, you can view the features and case studies on the [LRTK official website](https://www.lrtk.lefixea.com/).


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.