top of page

How LiDAR Sensors Are Transforming Slope Management: Achieving Safe and Rapid Measurements with Smartphone RTK Surveying

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

As digital transformation (DX) advances in the construction industry, new surveying and as-built management methods that utilize 3D point cloud data are attracting attention even at slope management sites. Three-dimensional measurement of slopes, which previously required specialized equipment and advanced skills, has now reached an era where anyone can conduct it safely and efficiently thanks to the combination of LiDAR sensors built into iPhone and iPad and RTK-GNSS receivers for smartphones (LRTK). This article begins by explaining what point cloud data is and its advantages, then provides a clear, step-by-step explanation of the latest high-precision surveying methods using smartphone LiDAR and LRTK. Furthermore, it introduces concrete use cases such as as-built verification・pre- and post-construction comparison・disaster recovery surveys・earthwork volume calculation・design verification, and concludes by considering how the introduction of LRTK enables anyone to easily start high-precision smartphone surveying, making it possible to balance safety and productivity.


Safety and Efficiency Required for Slope Management

In slope management along roadsides and on development sites, it is important to accurately grasp the shape of the slope and confirm whether it has been constructed according to the design. However, surveying work on steep slopes always involves the risk of falling rocks and slips, and required significant labor and time. Traditionally, surveyors split between the top and bottom of the slope to measure heights and gradients, or used a total station to observe many points one by one. Because the entire slope was inferred from a limited number of survey points, there was a risk of overlooking subtle undulations and of human error. Also, the work required multiple people, and working hours were often constrained for ensuring safety.


One promising means of addressing these challenges is grasping the surface geometry of slopes through 3D point cloud surveying. Point cloud measurement using laser scanners or photo surveying (photogrammetry) can capture the entire surface of even large slope areas in a short time. The obtained point cloud data (a collection of numerous coordinate points) digitally records the current shape of the slope in its entirety, making it highly effective for checking differences from the design model and detecting deformations. For example, irregularities and depth information that 2D drawings or photographs cannot fully capture can be intuitively visualized in 3D with point clouds, making it easier for the client and the entire construction team to share a common understanding. Also, measuring distances, angles, areas, and volumes on the point cloud is more accurate than relying on scales or survey formulas, and enables secondary use of the data such as extracting cross-sections later or recalculating volumes. In this way, point cloud data is becoming an important information resource in slope management, enhancing the reliability of quality checks and records and being useful for future maintenance management.


That said, conventional high-precision point cloud surveying required dedicated laser scanners costing several million yen and specialized knowledge, making on-site adoption difficult. Enter smartphone-based LiDAR scanning. In particular, recent iPhone and iPad (Pro models) come standard with compact LiDAR sensors, enabling easy 3D scanning of the surroundings. In the next chapter, let's look at how smartphone LiDAR works and its advantages.


Easily acquire slope point clouds with smartphone LiDAR

LiDAR sensor (Light Detection and Ranging) is a technology that emits an infrared laser to rapidly measure the distance to objects. iPhone LiDAR is effective within approximately 5 m (16.4 ft), and by launching the camera app or a dedicated 3D scanning app and walking while holding up the smartphone, you can acquire the surrounding terrain and structures as a collection of many points (a point cloud). This is a revolutionary feature that lets you record a site almost as if you were shooting video. For example, if you point your smartphone at a slope and walk along the base of the slope, you can capture the entire shape of the slope, including surface irregularities, as data consisting of millions of points in a short time.


The advantages of smartphone LiDAR scanning are its convenience and speed. There is no need to carry heavy tripods or surveying instruments, and you can take measurements alone at any time without waiting for a dedicated surveying team. Even in cases where a surveying crew traditionally took half a day to measure the finished shape of a slope, using an iPhone can make it possible to complete the task in just a few minutes. This enables high-frequency measurements even during construction, allowing daily progress to be tracked in detail. The resulting point cloud can be displayed in 3D on the smartphone screen on site, so you can immediately check whether anything was missed. Also, because the data is stored digitally, there is no risk of loss or transcription errors like with paper records. Later, the point cloud can be analyzed in detail in the office, making it easy to extract arbitrary cross-sections or calculate volumes for multifaceted analysis.


Weaknesses of Standalone Smartphone LiDAR: Positional Accuracy and Spatial Distortion

Smartphone LiDAR is handy and convenient, but there are some drawbacks to standalone use. One major issue is positioning accuracy. The iPhone's built-in GPS (GNSS) is generally said to have errors on the order of several meters (several ft), and the smartphone's own position and orientation estimates also rely on AR technology. Therefore, the point cloud data obtained can have positional shifts when viewed in a world coordinate system. Simply put, the point cloud captured by a smartphone can reproduce the shape as seen on site, but the absolute location information tied to surveying coordinates (latitude/longitude and elevation) is not accurate. Even if you try to compare the as-built slope with design drawings or control points, if the entire point cloud is shifted by several meters (several ft) from the true coordinates, you cannot make an accurate comparison.


Another challenge is distortion of the entire space. When walking around and scanning a large area with a smartphone, small errors in the device’s self-position estimation can accumulate, causing distortions or scale discrepancies in the point cloud’s shape itself. For example, when scanning a slope roughly 5 m (16.4 ft) by 5 m (16.4 ft) from one end to the other in one pass, there have been reports of the acquired data being slightly stretched or compressed compared to the actual slope, or of surface irregularities appearing gentler than they are in reality. This is due to errors in relative position estimation from the smartphone’s built-in gyroscope and camera images (the so-called AR SLAM technology). Subtle errors that are negligible in small indoor spaces accumulate over tens of meters outdoors, becoming impossible to ignore.


Thus, LiDAR point clouds captured by a smartphone alone can suffer from positional offsets and distortion of the overall shape, making them insufficiently reliable to be used as precise surveying data for civil engineering in their raw form. Even if you can scan an entire slope, it defeats the purpose if you then struggle to align the data later with other survey results or design data. The solution that emerged was a method of incorporating RTK positioning into smartphones.


Centimeter-accurate smartphone surveying enabled by RTK positioning

RTK (Real Time Kinematic) positioning is a technique for dramatically improving the accuracy of satellite positioning (such as GPS); by applying correction information from a base station in real time, it can reduce position errors to the centimeter level (cm, in). In Japan, the quasi-zenith satellite "Michibiki" provides a centimeter-class augmentation service (CLAS), and networked Continuously Operating Reference Station systems (GNSS reference station networks) have made it easy to perform positioning within a few centimeters (a few in).


In recent years, ultra-compact GNSS receivers that allow this RTK technology to be used with smartphones have appeared. By connecting to a phone via its Lightning connector or Bluetooth and attaching a receiver that can ingest satellite information and correction data to the phone, the phone itself is transformed into a high-precision surveying instrument. The LRTK (an abbreviation for smartphone RTK receiver) referred to in this article is precisely such a device. For example, a small receiver about 1~2 cm (0.4~0.8 in) thick and weighing approximately 150 g can be attached to an iPhone using a dedicated case or attachment, and it will measure the current position in real time and supply it to the smartphone. Errors are typically contained to about 2~3 cm (0.8~1.2 in), and by remaining stationary and averaging positioning for several tens of seconds, accuracies of under 1 cm (<0.4 in) can even be achieved. In other words, it can turn a smartphone into a pocket-sized, high-precision GNSS surveying instrument.


Various dedicated apps are also available for using RTK-compatible GNSS receivers for smartphones, and by configuring base station connections and correction data reception settings on the smartphone screen, you can instantly compute high-precision coordinates of your current location (latitude and longitude, plane rectangular coordinates, elevation, etc.). Centimeter-level positioning, which previously could only be obtained by relying on expensive surveying instruments and professional technicians, has become something anyone can handle with just a single smartphone: centimeter-level positioning (half-inch-level positioning). Next, let’s see what happens when this high-precision positioning information is combined with smartphone LiDAR point clouds.


High-Precision Slope Point Cloud Measurement Enabled by LiDAR+RTK

By combining a smartphone's LiDAR sensor and an RTK positioning device (LRTK), high-precision, distortion-free point cloud data acquisition becomes possible. The mechanism will be explained step by step.


First, when scanning a slope with a smartphone's LiDAR, LRTK continuously measures the smartphone's absolute position (latitude, longitude, and altitude) to centimeter-level (half-inch-level) accuracy. In the scanning app, these high-precision position coordinates are tagged to the point cloud being acquired in real time. Simply put, it's the idea of writing the "correct world coordinates" where each point exists into the captured point cloud.


As a result, point clouds that were previously recorded in a local coordinate system (relative coordinates around the smartphone) are now recorded as data on a public coordinate system aligned with the site's surveying standards. For example, each point will have coordinate values common to survey maps, such as plane rectangular coordinates based on national coordinates and geoid heights. This allows slope point cloud data to be overlaid directly onto design drawings and other survey data for comparison.


Moreover, because RTK accurately captures the smartphone's movement and trajectory itself, the aforementioned distortions and scale drift are also greatly reduced. The idea is that the high-precision coordinates that LRTK provides sequentially serve as a reference, so errors in the smartphone's AR position estimation are corrected and reset. As a result, even when scanning an area of 5 m (16.4 ft) or more at once, problems such as point clouds not aligning and becoming distorted are less likely to occur. In this way, both "shape accuracy" (how accurately the point clouds reflect the actual shape) and "positional accuracy" (how correctly the point clouds are placed in coordinates) improve dramatically.


Slope point clouds acquired with LiDAR+RTK include reliable coordinate information for each point, so post-processing is simplified. Traditionally, after scanning you had to compare point clouds against each other using reference points or perform separate registration with known points. However, when using LRTK, by the time on-site scanning is finished you already have point cloud data that matches survey coordinates. For example, you can immediately load the newly acquired point cloud into a design model’s coordinate system to check differences, or overlay point clouds from multiple days to compare progress—tasks that can be done right away without complicated adjustment work. With a dedicated app, you can upload point cloud data from a smartphone to the cloud and, while in the office, view the 3D point cloud in a browser—such data sharing is possible with a single tap. An environment is emerging in which anyone can instantly perform high-accuracy 3D surveying with nothing more than a smartphone and LRTK: smartphone + LRTK alone enables anyone to immediately practice high-precision 3D surveying. This can be seen as a major advance that dramatically reduces the effort and barriers of field surveying, including slope management.


So, in what specific situations can this high-precision point cloud surveying using LiDAR+RTK be applied? In the next chapter, we will introduce various examples of its use in scenes related to slope construction and surveying.


Use Case Introduction: From Slope Management to Disaster Surveys

High-precision point cloud measurement using smartphone LiDAR and LRTK can be widely applied in construction management and surveying sites that deal with slopes. Here are some representative application scenarios.


• As-built Verification (Post-construction Quality Inspection): Once slope works are completed, you can scan the entire slope and record the as-built shape in its entirety. By overlaying the acquired point cloud onto the design slope model (standard cross-sections and design surface), deviations in the finished shape can be intuitively understood with a color-coded heat map. For example, in the case of an embankment slope, if areas protrude beyond the design they can be shown in red, and areas that are depressed and lacking can be shown in blue, making it immediately clear where corrective action is needed. This enables quick rework—cutting excess fill or adding material to deficient areas—within the same day. Point cloud data are also effective as evidence (proof) for inspection documents, making as-built reporting to the client smoother.

• Before-and-after construction comparison / Progress management: If you periodically scan the original terrain before construction starts and the state during construction, you can compare terrain changes in 3D before and after construction and day-to-day. For example, in excavation work, overlay the pre-excavation ground and post-excavation ground point clouds and display the differences with color-coding so you can visually grasp where and how much was excavated. Similarly, in embankment work you can compare daily embankment extents and increases in height in a time series, which is useful for schedule management and serves as supporting documentation for quantities of work performed. Because it is also possible to automatically calculate embankment and excavation volumes from differences between point cloud datasets, you can quantify daily progress and manage it numerically.

• Disaster recovery surveys: When slopes collapse or deform due to heavy rain or earthquakes, smartphone point cloud surveying becomes a fast and safe tool for capturing current conditions. Even without sending personnel onto dangerous slopes immediately after an event, scanning the collapsed terrain from a safe distance with smartphone LiDAR can record the extent of collapse and the volume of landslide debris in detail. In fact, at a site where liquefaction-induced subsidence occurred after an earthquake, an iPhone + LRTK was used to measure on-site the amount of settlement of utility poles and the depth of cracks in the road, and the high-precision georeferenced data were shared the same day. This enabled relevant agencies to quickly grasp the situation and greatly contributed to formulating recovery plans. In disaster response, speed and safety are imperative, and with smartphone surveying it is possible to produce 3D records in a short time with a minimal number of people, allowing necessary information to be collected while reducing the risk of secondary disasters.

• Earthwork Volume Calculation and Progress Management: Using point cloud data, you can calculate earthwork quantities such as slope fill and excavation volumes with high accuracy. For example, in land development when cutting into a hill to form a slope, computing the differential volume from terrain point clouds before and after construction allows the amount of soil removed (or the amount of fill placed) to be calculated precisely. Traditionally, quantity control relied on estimates from remote survey points or drawing-based calculations, but with point clouds it can be done on a measurement-based (actual-measurement) basis, markedly improving the accuracy of progress reporting and spoil disposal planning. Additionally, by calculating the differential volume between the finished slope shape and the design model, you can quantitatively show the amounts of insufficient or excessive fill. With a smartphone + LRTK combination, real-time processing—such as calculating volumes on a cloud service immediately after scanning on site—is becoming possible, aiding immediate decision-making and countermeasure planning.

• Design alignment and composite display: Scanned point cloud data can also be used for design verification by comparing it with the 3D models or drawing data used in the design. For example, in reinforcement work for the slope at a tunnel portal, you can overlay the design model of the reinforcement structure onto the current slope point cloud in advance to verify the validity of the construction plan. If smartphone point clouds are acquired in a public coordinate system, alignment with the design model will automatically match, and it is also easy to overlay the expected completed image on site using AR (augmented reality) display. It is effective as a communication tool for confirming on site whether construction is being carried out according to the design and for meeting with clients while showing them the expected finished result. Furthermore, during as-built inspections, the differences between the design cross-sections and the as-built point cloud can be checked immediately, allowing you to detect and correct any areas that fall outside the acceptance criteria. In this way, using point clouds in conjunction with design data for comparison greatly improves the visualization of quality and shared understanding among stakeholders.


As described above, high-precision point cloud measurement using smartphone LiDAR combined with RTK can be applied in a variety of scenarios, centered on slope management, and provides on-site safety and efficiency that were not possible with conventional methods.


Summary: Getting Started with Safe, High-Accuracy Smartphone Surveying Using LRTK

The combination of the iPhone/iPad LiDAR sensor and a smartphone RTK receiver (LRTK) is dramatically changing how slope management is handled. Until now, as‑built measurements and deformation surveys of slopes inevitably involved laborious and hazardous work. However, with the advent of smartphone surveying, anyone can easily acquire high‑precision 3D data and measure slopes safely and quickly. Because centimeter-level RTK positioning ensures the reliability of point cloud data, being able to achieve survey-grade results with a single smartphone is a major attraction.


When on-site technicians themselves can conduct surveys with intuitive operation and immediately share and utilize that data, downtime caused by "waiting for surveying" is reduced, and there are cases where construction productivity has dramatically improved. If a "one-device-per-person" smartphone surveying device becomes widespread, the site's overall digital transformation will accelerate, and the combination of greater efficiency and improved safety will become a reality.


Not limited to slope management, high-precision positioning and the utilization of 3D point clouds in the construction and civil engineering sectors are expected to become increasingly important. With initiatives such as i-Construction promoted by the Ministry of Land, Infrastructure, Transport and Tourism providing tailwinds, there is a growing need to proactively adopt the latest technologies. By adopting LRTK, anyone can easily start high-precision surveying with a smartphone as soon as today. As a solution that balances ensuring safety and improving productivity, why not proactively consider the use of smartphone + LiDAR + RTK? The future of worksites is being opened up by small sensors and antennas in the palm of your hand.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page