top of page

Table of Contents

• Background: why photos with accurate coordinates are required

• Basic methods for attaching location information to photos

• Typical GPS accuracy and coordinate errors

• Technologies for obtaining high-accuracy coordinates (using RTK)

• Procedures for photographing and managing field survey photos with accurate coordinates

• Simple surveying with LRTK

• FAQ


Background: why photos with accurate coordinates are required

In field surveys, recording the photo’s exact coordinates for the location where it was taken has become increasingly important. Traditionally, people would mark the photo location on a map or handwrite location information in a photo ledger. However, manual records are prone to position errors and memory lapses, and it is not uncommon to later look at a photo and wonder, “Where exactly was this taken?”


Also, with the construction industry advancing on-site DX (digital transformation), exemplified by the Ministry of Land, Infrastructure, Transport and Tourism’s *i-Construction*, there is growing demand to improve the accuracy and efficiency of data acquired in field surveys. Methods that attach and manage location information in photos are gaining attention. When photos are linked to accurate coordinates, you can precisely identify the shooting point on maps or drawings, reducing miscommunication among stakeholders. For example, in surveys of a large construction site, clearly knowing which location a photo represents makes later planning and review much smoother. Furthermore, if photos include high-accuracy location information, they can be plotted on GIS (geographic information systems) or CAD drawings and used to compare existing conditions with plans, enabling more advanced uses.


Thus, attaching accurate coordinates to field survey photos is not merely a convenience but a key factor that dramatically improves record accuracy, work efficiency, and information sharing on site. However, there are several challenges to adding high-accuracy location data to photos, and traditional methods are sometimes insufficient. Next, we will look at the basics of attaching location information to photos and the issues surrounding accuracy.


Basic methods for attaching location information to photos

The most basic way to add location information (coordinates) to photo data is to use the functionality of the capture device. Modern smartphones and digital cameras with built-in GPS can obtain the device’s location (latitude and longitude) at the time of capture and automatically write those coordinates into the photo file’s Exif data. For example, if you enable location recording in your phone’s camera app, information such as “latitude XX° XX' XX'' N, longitude XX° XX' XX'' E” will be linked to the photo at the time of shooting.


Photos with this kind of location information are convenient for later plotting on a map or organizing photos by shooting location. Even when many photos are taken on site, if each image has coordinates recorded, it’s easy to check which photo corresponds to which location. Using dedicated photo management software or map apps, simply loading the photos will display the shooting points on a map, streamlining report creation and information sharing.


If the capture device does not have location recording capability, you can still add location information to photos afterward. For example, you can geotag photos by matching capture times with movement history data (GPX files) recorded by a GPS logger or a tracking app on a smartphone, then write the corresponding coordinates into the Exif. Alternatively, you could note coordinates from a map app while shooting and later manually enter them into the photo files. However, such post-processing and manual work require effort and carry the risk of recording errors. Therefore, having the device automatically attach location information at the time of capture is the most reliable approach.


Typical GPS accuracy and coordinate errors

While location information automatically recorded by cameras or smartphones is convenient, you must pay attention to its accuracy. The positional error obtained from typical GPS receivers or smartphone positioning functions is generally on the order of several meters, depending on conditions. In open-sky locations, horizontal errors often remain within about 5–10 m (16.4–32.8 ft), but when there are tall buildings or dense trees nearby, multipath signal reflections can greatly degrade accuracy. In urban canyons or mountainous areas, position deviations of tens of meters can occur in some cases.


If such coordinate errors are attached to photos, you may later reference incorrect locations when trying to understand site conditions from the images. For instance, if a photo is off by 10 m (32.8 ft), it could point to a completely different spot outside the planned site boundary. When checking problem areas on drawings or reconciling with survey data, inaccurate location information can hinder correct decision-making. For sensitive uses such as quality control of work results or boundary confirmation, meter-level errors are unacceptable. To increase the utility of field survey photos, it is ideal to attach coordinates with as small an error as possible—i.e., high-accuracy coordinates.


Altitude (height) information tends to have even larger errors than horizontal position. With standard GPS, vertical errors of 10 m (32.8 ft) or more are not uncommon. Therefore, if you want to record the height of embankments or excavations in photos, relying too heavily on elevation data may yield inaccurate results. Because there are limits to the positional information obtainable from general GNSS (Global Navigation Satellite Systems), additional measures are needed when precise coordinates are required.


Technologies for obtaining high-accuracy coordinates (using RTK)

To reduce GPS errors to the centimeter level, surveying operations use a high-accuracy positioning technique called RTK (Real-Time Kinematic). RTK, often translated as “real-time kinematic positioning,” uses a reference receiver (base station) at a known point and a rover receiver that moves, taking the difference between GNSS measurements to correct error factors and achieve centimeter-level accuracy. In simple terms, it determines its current position very precisely by comparing with a point whose exact position is already known.


Recently, network RTK, which allows users to obtain correction information over the internet without deploying a dedicated base station, has become widespread. In this system, the rover (the user’s GNSS receiver) connects to a provider’s network of reference stations (such as government or commercial services) and receives real-time correction data, enabling high-accuracy positioning with a single receiver. Using network RTK, you can measure positions across a wide site with centimeter-level accuracy and perform efficient surveying alone without heavy tripods or optical instruments.


RTK-GNSS positioning accuracy under good conditions is typically about 2–3 cm (0.8–1.2 in) horizontally and about 3–5 cm (1.2–2.0 in) vertically. This is an order of magnitude better than standalone GPS and is sufficiently reliable for applications such as quality control in civil engineering and boundary confirmation. Other high-accuracy satellite positioning technologies exist—such as SBAS augmentation signals and precise point positioning (PPP)—but RTK is the most common means of obtaining centimeter-level accuracy on site in real time. Recently, compact GNSS receivers that pair with smartphones and tablets have become available, and dedicated apps make RTK positioning accessible to a broader range of users. By leveraging these technologies, you can attach far more accurate coordinates to field survey photos than was previously possible.


Procedures for photographing and managing field survey photos with accurate coordinates

Now that you understand how high-accuracy GNSS (RTK) works, let’s review the concrete steps for attaching accurate coordinates to field survey photos. Here we assume the use of a small RTK-capable GNSS receiver paired with a smartphone.


• High-accuracy positioning equipment preparation: First, obtain a GNSS receiver capable of centimeter-level positioning and connect it to a smartphone or tablet. Connections can be made via Bluetooth, USB, or other methods. Also prepare a means to receive RTK correction information. In most cases, accessing correction services over the internet is necessary, so the smartphone will need mobile connectivity (a SIM card or tethering).

• RTK positioning setup and verification: Once the GNSS receiver is connected to the phone, start RTK positioning using a dedicated app or software. If correction data are being received correctly, it will take from several tens of seconds to a few minutes to reach a high-precision positioning state (so-called “FIX solution”). Check the app’s display for the current positioning mode and estimated accuracy (approximate error) to confirm that centimeter-level precision is being achieved. Basic precautions to improve accuracy—such as keeping the antenna level in an open view of the sky—are also necessary.

• Photo capture: After establishing a high-accuracy RTK position, take photos while that state is maintained. If the dedicated app includes a camera function, launching the camera from within the app and shooting will save the photos directly with high-accuracy coordinates. Even if the app lacks a camera feature and you use the regular camera app, if the phone’s location service is receiving data from the RTK receiver, the Exif will record the high-accuracy coordinates. Depending on the app and settings, photos and coordinate data may also be linked and saved to the cloud at the time of capture.

• Verify linkage between coordinate data and photos: After shooting, confirm that coordinates have been correctly attached to the photos. Open the photo’s info view to check the latitude/longitude in the Exif, or display the photo on a map. If coordinates are not embedded in the photo file itself, the app should have stored the photo ID and coordinates linked together. In such cases, use the app’s export function to output a coordinate list per photo or map the photos in a photo ledger.

• Data storage and sharing: Finally, properly store and share the high-accuracy coordinate-tagged photo data. Uploading to an internal server or cloud service and sharing with stakeholders ensures anyone can accurately identify photo locations. When including photos in reports, listing latitude/longitude in captions or attaching a coordinate appendix produces reliable documentation. Because recorded coordinates enable easy site relocation for follow-up surveys or additional work, this reduces rework.


Simple surveying with LRTK

As a more user-friendly solution for implementing the high-accuracy positioning and photo recording methods described above, there is LRTK. LRTK combines ultra-compact RTK-GNSS receivers that work with smart devices, dedicated apps, and cloud services. This lets anyone use centimeter-level positioning on site without complicated setup or expensive specialized equipment. For example, by attaching an LRTK receiver to a smartphone and walking around the site, high-accuracy position data are automatically acquired and can be saved and managed in the cloud along with photos and notes via a compatible app.


Tasks that traditionally required experienced surveyors—such as stakeout and as-built measurements—are supported by LRTK’s intuitive AR navigation features, allowing those with limited surveying knowledge to perform accurate work. In short, simple surveying with LRTK is “a new surveying method that realizes RTK-level accuracy with easier equipment and operation,” and its effectiveness is already being demonstrated at many sites.


From the perspective of attaching accurate coordinates to field survey photos, LRTK is a highly effective tool. Because high-accuracy position information can be recorded in the cloud simultaneously with photo capture, it greatly reduces the effort of later locating photos or checking positional relationships on drawings. Accumulating high-accuracy data improves the reliability of site records and facilitates future data reuse (for example, integration with 3D models or tracking changes over time). If you’re wondering how to attach accurate coordinates to photos or want an easy way to introduce high-accuracy positioning, consider trying simple surveying with LRTK.


FAQ

Q: Why is smartphone GPS location information insufficient? How different is the accuracy? A: Smartphone GPS is easy to obtain but has large errors and is not suitable for strict positional records. Typical smartphone GPS accuracy is on the order of several meters even in open areas, and can deviate by more than 10 m (32.8 ft) in poor conditions. In contrast, RTK-based high-accuracy positioning confines errors to a few centimeters. In other words, it’s orders of magnitude more accurate and can be reliably used for site boundaries and structural positions. Smartphone location is useful for indicating approximate site location, but for construction or surveying records it may be insufficient, so combining it with high-accuracy technology is desirable.


Q: What equipment is required to add high-accuracy location information to photos? A: Basically, you need an RTK-capable GNSS receiver and a device (smartphone or tablet) and application to handle the data. Additionally, GNSS correction information (base station data) is indispensable for centimeter-level positioning. You can obtain these corrections by subscribing to a network RTK service provided by government or private entities over the internet, or by setting up your own base station at a known point and transmitting corrections locally. Recently, turnkey solutions (such as LRTK-like products) have appeared that bundle these components, allowing users without specialist knowledge to connect equipment and follow prompts to achieve high-accuracy positioning.


Q: What is RTK? How is it different from regular GPS? A: RTK (Real-Time Kinematic) is a technique that corrects GPS errors by relative positioning with a reference receiver, enabling real-time high-precision location determination. Regular GPS computes position solely from satellite signals and has larger errors, whereas RTK uses data simultaneously captured by another receiver (or a reference station network) to cancel error factors (such as satellite clock errors and atmospheric effects) by differencing. As a result, positions can be determined with centimeter accuracy. In network RTK, correction data from reference stations are obtained via the internet, allowing high-precision positioning with just the rover receiver.


Q: Can high-accuracy positioning be performed in areas without mobile coverage? A: In areas without mobile networks, you cannot obtain network RTK correction data, so alternative approaches are necessary. One method is to set up a GNSS receiver as a local base station on-site and transmit correction information via local radio. Another is to record raw GNSS data on site and later perform post-processing (PPK) in the office using known point data to compute precise coordinates. Both approaches can achieve high accuracy without network connectivity, but they lose the real-time aspect. Note that in deep valleys or among high-rise buildings where satellite reception itself is unstable, RTK may fail to produce a solution or accuracy may temporarily decrease. In such difficult conditions, timing observations for more stable satellite reception or using optical survey instruments for checks are effective countermeasures.


Q: I’m a beginner—can I master high-accuracy GNSS and RTK? A: Yes. Recent high-accuracy GNSS devices and software are very user-friendly. With systems like LRTK, you can follow on-screen guidance in a smartphone app to perform positioning and recording without worrying about complex settings. Of course, to maximize accuracy you should choose open-sky environments and stabilize the equipment, and these basics are covered in app help or support. Start in a wide-open area to get comfortable, then gradually apply the workflow in more complex sites. Anyone who follows the proper procedures can effectively use high-accuracy positioning for photo records.


Q: What is “simple surveying with LRTK”? A: LRTK is a solution that combines an ultra-compact RTK-GNSS receiver with smartphone/tablet apps and cloud services. This enables centimeter-level surveying tasks that once required specialized equipment and skills to be performed easily by anyone—this is what “simple surveying with LRTK” means. By attaching the receiver to a smart device and walking the site, high-accuracy position data are automatically captured and saved, enabling quick creation of site records that combine photos and point-cloud data. It reduces laborious team tasks and complex post-processing, dramatically streamlining on-site surveying and measurement processes, and is gaining attention as a new method.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page