Along coastlines, near river mouths, alongside roads where de-icing agents are used, and near industrial zones, salt damage and corrosion cannot be overlooked as causes of reduced power generation in power generation equipment. In solar power generation, factors such as solar irradiance, temperature, shading, soiling, and power conditioner downtime histories tend to be suspected first, but when deterioration progresses in mounting structures, terminals, wiring, junction boxes, and exterior components, it can lead to electrical losses and an increased risk of shutdown. In particular, corrosion that progresses gradually may not immediately manifest as reduced power output, and by the time it is noticed it may have advanced to reduced output in some strings, poor contacts, insulation failures, or a state approaching equipment shutdown.


When days or stretches of low power generation persist, it's important not to simply attribute them to the weather but to check the installation environment and the extent of equipment degradation together. In this article, to make it easy for field personnel to use during site inspections and inspection planning, we explain six checkpoints for salt damage and corrosion.


Table of Contents

• Check the installation environment and the range over which salinity has an effect.

• Inspect for corrosion around mounting frames, fittings, and bolts.

• Inspect wiring, connectors, and connection points for deterioration.

• Check for corrosion inside junction boxes, collector boxes, and panels.

• Check for dirt, white rust, and poor drainage around the panels.

• Cross-check power generation data against the inspection regime and make a determination.


Confirm the installation environment and the extent of salt exposure

When checking for salt damage and corrosion that can lead to reduced power generation, it is important to first assess the environment where the equipment is installed. Salt-affected areas are not limited to locations close to the sea; topographies where sea-salt particles are easily carried by strong winds, estuaries and port areas, valley-shaped terrain through which sea breezes pass, and elevated sites with little to shield them even if they are distant from the coastline can all promote salt deposition on equipment. In addition, along roads where de-icing agents are used in winter, and in places where salt-containing dust is easily dispersed, the risk of corrosion to metal parts and terminals also increases.


On site, the first things to check are the location relative to the sea, major roads, factories, rivers, and wetlands. You should look not only at distances on a map but also at the prevailing wind direction, whether there are surrounding buildings or windbreaks, and whether equipment is at a height that makes it susceptible to wind. In particular, even within the same power plant, degradation can progress differently on windward outer perimeters, rows facing the sea, and low areas where drainage tends to collect. If sections with low power output are concentrated in a particular direction or along the outer perimeter, consider the possibility that they are being affected by salt and moisture.


The difficulty of salt damage is that deterioration can progress internally even when visible changes are slight. Even if there appears to be only a thin white deposit on the surface, rainwater or condensation can concentrate salts and promote corrosion of metal parts and deterioration of connections. It can be dry and inconspicuous in fine weather, while deposits or discoloration may become noticeable only after rain or during morning dew. Therefore, assuming that appearance can change depending on inspection timing and weather, keeping photographic records so they can be compared will make judgments easier.


When investigating the causes of low power generation, it is necessary to separate natural conditions such as solar irradiance and ambient temperature from degradation factors originating from the environment. For example, if a particular area shows lower generation compared with neighboring installations of similar size or with other sections within the same power plant, simple weather differences become hard to use as an explanation. Therefore, check whether biases in the generation data coincide with positions prone to salt damage. If output reductions are observed in rows on the sea-facing side, rows where drainage stagnates, or rows with noticeable discoloration of metal components, it is worth prioritizing on-site inspections for salt damage and corrosion.


Checking the installation environment is not mere background information. It also serves as a basis for determining inspection intervals. For equipment that is susceptible to the effects of salt, humidity, dust, or de-icing agents, routine inspections alone may not capture the progression of degradation. Rather than waiting until power generation is low and scrambling to check, it is preferable to designate high environmental-risk locations in advance as priority monitoring areas and continuously compare generation data with on-site photographs.


Inspect for corrosion around mounting racks, fittings, and bolts

Support components that are easy to overlook when checking for salt damage and corrosion include racking, mounting brackets, bolts, nuts, and washers. These parts do not generate electricity themselves, but because they affect panel tilt, mounting condition, grounding, and cable retention, their deterioration can impact the overall stability of the installation. Even if they do not seem directly related to low power output, deformation or loosening of the racking, misalignment of panel angles, or sagging wiring can negatively affect power generation performance through shading, poor electrical contacts, or water pooling.


When inspecting, first look for visible red rust, white rust, blackening, coating blistering, roughness of the plating layer, and discoloration around bolts. In particular, areas where dissimilar metals are in contact, horizontal surfaces where water tends to pool, lower edges where rainwater runs off, and low positions near soil or grass are more prone to corrosion. Do not look only at the bolt head; check around the seating area, the underside of washers, overlapping parts of members, and the edges of fittings. There is a large difference in urgency between a condition where only the surface is lightly discolored and a condition where the cross section has become thinner.


Around the mounting structure, it is also important to check whether corrosion has led to a loss of strength. You do not need to hit or move components recklessly, but if there is obvious looseness, misalignment of fastened joints, lifting of members, or deformation of mounting brackets, you should check not only for power generation issues but also for safety. If low power generation persists after strong winds or a typhoon, check whether slight displacements of the mounting structure have changed the angle or position of the panel rows and altered how shadows or dirt accumulate.


Corrosion of the mounting structure is also related to poor grounding and electrical risks. If the grounding conductor is connected to the mounting structure, corrosion or loosening at the connection points can affect protective functions during abnormal events. Focusing only on reduced power output can lead to postponing such safety issues, but when corrosion is found it is important to coordinate with the chief electrical engineer and maintenance personnel to verify both the mechanical fastening condition and the electrical integrity.


In practice, even if corrosion of the mounting racks or bolts is discovered, it is important not to immediately conclude that it is the cause of reduced power generation. What matters is to check whether the location, extent, and degree of progression of the corrosion correspond to the locations of anomalies in the generation data. The judgment changes depending on whether rack corrosion is noticeable only near strings with low power output within the same plant, or whether it appears as a uniform, age-related change across the entire site. By consistently photographing from the same angle so that differences from the previous inspection can be checked, it becomes easier to distinguish between mere surface discoloration and progressive corrosion.


Check wiring, connectors, and connection points for deterioration

Degradation of connection points such as wiring, connectors, terminals, and branch joints requires particular attention as a cause of reduced power output. In photovoltaic systems, the electricity generated by the panels is sent via wiring for each string to junction boxes and power conditioners. If contact resistance increases or insulation deteriorates anywhere along this path, it can lead to reduced generation, abnormal shutdowns, or alarm events. Salt and moisture are factors that promote the deterioration of these connection points.


What you should check on site are discoloration, cracks, whitening, and swelling of connector housings; verdigris or rust around terminals; and cracking, hardening, abrasion, or sagging of wire insulation. In coastal or humid locations, moisture can enter through small gaps in the housing and accelerate corrosion of internal terminals. Even if there are no major abnormalities visible from the outside, heating at the connection or poor contact may be occurring. Therefore, it is important not to judge by appearance alone but to verify using power generation data, alarm history, insulation resistance measurements, and similar information.


How the wiring is secured also affects power generation. If the fastening is loose and the wiring keeps swaying in the wind, it puts stress on the connectors and the sheathing. If the wiring touches the edges of the racking or other metal parts, vibration or rubbing can damage the sheathing. If salt or moisture is added, the risk of insulation deterioration increases. If there is a string with low output, trace that string’s wiring route and check for locations prone to water exposure, spots close to the ground, places where ties are too tight, and connectors facing downward that can collect water.


Corrosion at connection points can not only reduce power output but also cause abnormal overheating. If the terminal contact surfaces become rough or the connections loosen, resistance increases in the current-carrying parts. When a load is applied during periods of generation, this can appear as a temperature rise. For safety, avoid touching live parts carelessly, but during a professional inspection technicians check temperature differentials and the condition of terminals to see if there is any localized heating. If low power generation coincides with abnormal temperature rises or alarms on a specific circuit, prompt action is required.


We also check the replacement history of wiring and connectors. If only part of the system was repaired in the past, material specifications, installation methods, and connection conditions may differ from those of the surrounding areas. If those are not suitable for a salt-laden environment, deterioration may recur. When investigating the cause of low power generation, we examine not only the current appearance but also past repair records, construction photos, and inspection records together. If power generation has dropped around a specific time, confirming whether wiring work or component replacement was performed before or after that time can help narrow down the cause.


Inspect junction boxes, combiner boxes, and panel interiors for corrosion

The interiors of junction boxes, combiner boxes, distribution panels, and panels around power conditioners are locations where salt damage and corrosion can directly lead to decreased power generation. Even if the exterior appears to be well maintained, deterioration of door gaskets, gaps at cable entry points, intrusion of salt through ventilation openings, and condensation can cause corrosion of internal terminals and metal parts. Corrosion inside panels can lead to string-level output reductions, insulation failures, malfunctions of protective devices, communication anomalies, and equipment shutdowns.


When inspecting, check not only the outside of doors and enclosures but also the access openings, hinges, locking mechanisms, gaskets, and the areas around cable glands. If there is rust on the outside, moisture and salt may have entered the interior as well. However, inspecting inside the panel carries the risk of electric shock and short circuits, so it must always be performed by personnel with the appropriate qualifications and procedures. Low power generation is not a reason for on-site staff to casually open and handle the panel; safe inspection in accordance with the maintenance regime is a precondition.


Inside the panel, check for discoloration of terminal blocks, discoloration of copper parts, rust on screw areas, powdery deposits, water droplet marks, condensation traces, and signs of insect or dust intrusion. If moisture containing salt penetrates, corrosion products may form on metal surfaces. If the contact condition of the terminals deteriorates, it can lead to abnormal voltage or current, disturbances in communication values, and protective shutdowns of equipment. If, in addition to low power generation, specific strings show abnormal values, alarms occur at night or after rain, or the problem recurs after recovery, suspect moisture or corrosion inside the panel.


The placement of the panel is also important. Positions close to the ground, near drains, on faces directly exposed to sea wind, or in locations with large daytime temperature differences increase the risk of condensation and corrosion. The direction the door faces changes how rain and wind strike it, causing different rates of deterioration even within the same equipment. If only the junction boxes in low-generation sections are on the windward side, or are located where flooding or mud splashes are likely, you need to consider countermeasures as an installation-environment issue rather than mere equipment aging.


When checking for corrosion inside the panel, cross-checking with power generation data is indispensable. For example, if multiple strings connected to a particular junction box are simultaneously showing a decline, there may be a problem with that junction box, the upstream wiring, or the protective devices. On the other hand, if only some strings within the same junction box are low, individual inspection of the panels, the wiring, and the connection terminals is required. Rather than considering widespread component replacement based solely on low generation results, isolating the issue at the box level, circuit level, and string level can reduce unnecessary interventions.


Inspect for dirt, white rust, and drainage issues around the panels.

When thinking of salt damage and corrosion, people tend to look only at metal parts, but dirt around the panels, white rust on the frames, and poor drainage also affect power generation. When sea salt particles and dust adhere to the panel surface, they can obstruct light transmission or, if not fully washed away by rainwater, cause dirt to accumulate at the lower edge. Ordinary rainfall will wash them away to some extent in some cases, but during periods of little rain, installations with a shallow tilt, or environments with a lot of airborne sand and dust nearby, dirt tends to remain. If low power generation persists, it is necessary to distinguish between surface dirt and salt deposition and check them separately.


Around panel frames, white powdery deposits, discoloration at the lower edge of the frame, dirt accumulation in the corners, and corrosion around fasteners are observed. White rust can be difficult to judge for urgency from appearance alone, but caution is required if it is widespread or affecting mounting points, drainage paths, or wire-holding components. If water tends to collect at the frame corners or lower edge, moisture containing salts can undergo repeated wetting and drying cycles and accelerate deterioration.


Poor drainage also affects power generation. When mud, fallen leaves, bird droppings, grass, and sand accumulate at the lower edge of panels or around the mounting racks, rainwater cannot drain away easily and moisture remains. If the damp condition persists, it leads not only to corrosion of metal parts but also to deterioration of wiring insulation and areas around connectors. In addition, if dirt covers part of the panel surface, it can cast shadows over parts of the cells, causing a reduction in power output. In particular, if a band of dirt remains along the lower edge, it should not be ignored.


When checking soiling as a cause of low power generation, it is important not simply to note whether panels are dirty but to see whether the locations of output declines match the distribution of soiling. If there is a bias—such as heavy soiling only on the lower rows of the same column, white deposits mainly on the seaward-facing side, or soiling remaining only in low blocks where runoff collects—it is worth cross-referencing with the data. Conversely, if there is only a light, uniform film of dirt across the whole array, it may not explain a large drop in a specific string. Do not determine the cause based on visual inspection alone; maintain a comparative perspective.


Care should be taken even when performing cleaning. Even if the purpose is to remove salt or dirt, improper methods that damage the panel surface, wiring, or connectors can lead to other malfunctions. Avoid actions such as directing high-pressure water jets directly at connection points, scrubbing the surface with hard tools, or working while neglecting energized conditions and safety checks. When trying to improve low power output especially, do not rush the work; it is important to address the causes of dirt, salt, and corrosion separately and in accordance with equipment specifications, maintenance procedures, and safety rules.


Make decisions by cross-checking power generation data against inspection systems

Even if salt damage or corrosion is found, it is dangerous to conclude that this alone is the cause of reduced power generation. The output of solar power generation fluctuates due to multiple factors such as solar irradiance, ambient temperature, shading, panel temperature, snowfall, dirt, equipment shutdowns, output control, and communication failures. Therefore, to accurately judge a low-output condition, it is necessary to cross-check the degradation observed on-site with generation data. In particular, because salt damage and corrosion often progress gradually, it is effective to examine not only short-term daily data but also monthly, seasonal, year-on-year comparisons for the same month and comparisons within the same installation.


First, confirm whether the drop in power generation is occurring across the entire system or is concentrated in particular sections or strings. If the whole system is similarly low, check common causes such as weather, solar irradiance, output curtailment, or shutdown of major equipment. On the other hand, if only specific strings, combiner boxes, or power conditioner systems are underperforming, suspect wiring, connections, terminals, switchboard interior, or degradation of panel rows. Salt damage and corrosion progress at different rates depending on location, so they are likely candidates to check when generation declines are uneven.


Next, examine how the decline appears. Depending on whether it dropped suddenly on a particular day, fell gradually over several months, shows alarms or decreases only after rain, or differs between morning and evening, the causes you should suspect will change. Contact failures due to corrosion and insulation deterioration can cause symptoms to appear and disappear under the influence of humidity and temperature. If low power generation is noticeable after rain, after morning dew, during the rainy season, or after typhoons, it is worth checking for the effects of salt-containing moisture and for condensation inside the panel.


Comparing with on-site photographs is also effective. Photograph the sections with low power generation under the same conditions as the normal sections, and compare the mounting racks, wiring, connectors, junction boxes, and the lower edges of the panels. Photos are not merely records but materials for observing changes over time. If rust, white deposits, sagging wiring, or discoloration of connectors that were not present at the previous inspection are found this time, check whether they coincide with the period when generation data declined. If the timing matches, they can be prioritized as candidate causes.


However, there are caveats to the data. Communication failures or instrument malfunctions can cause the displayed value to appear lower than the actual power generation. In salt-damage environments, corrosion of communication equipment and measurement terminals can also cause data loss or abnormal values. Therefore, when generation is shown as low, we cross-check multiple pieces of information such as electricity sold, records from the power conditioner, values from the connection box, the on-site meter, and alarm history. Not confusing a displayed decrease with an actual output decrease leads to the correct response.


As a flow of assessment, first check major factors such as weather and shutdown history, then look for imbalances across blocks and strings, and finally cross-check with the locations of salt damage and corrosion on site. This allows you to avoid settling on a single cause for reduced power generation and to verify issues in order of likelihood. In practice, combining data with on-site inspection brings you closer to preventing recurrence than proceeding with cleaning or component replacement based solely on the fact that power generation is low.


To prevent declines in power output caused by salt damage and corrosion, it is important not only to inspect after an anomaly occurs but also to establish the inspection system itself. In coastal areas, regions with high humidity, and areas affected by de‑icing agents, degradation of generation equipment can progress slowly, and it can take time before it becomes apparent as reduced power output. To detect changes early, you need to record the same locations from the same viewpoints and ensure they can be reviewed together with the generation data.


In an inspection routine, it is important to standardize the inspection locations. If you merely take a general look each time, you are more likely to overlook changes. Designate places prone to deterioration as priority inspection points, such as the outer rows on the seaward side, windward-side mounting structures, low spots where drainage collects, the bottoms of junction boxes, areas where wiring is concentrated, and locations that have been repaired in the past. At each inspection, take photos from the same angles so you can compare rust, dirt, wiring condition, and changes in panel appearance. This allows you to judge the causes of reduced power generation based on changes over time.


Monitoring power generation data is also part of the inspection system. By checking not only daily generation but differences between strings, imbalances within the same power conditioner, year-on-year comparisons for the same month, and recovery after rain, it becomes easier to prioritize on-site inspections. To determine whether a day of low generation is due to temporary weather or a sign of equipment degradation, you need to look at continuous trends, not just single-day figures. Because salt damage and corrosion are progressive issues, it is important to view them as trends rather than isolated points.


It is also important to make information easy to share among maintenance personnel, site managers, and electrical managers. If the person who finds rust on site is different from the person monitoring the generation data, the investigation into the cause will be delayed unless their information is linked. By enabling photos, location, discovery date, generation data, alarm history, and response details to be reviewed together in a single flow, it becomes easier to narrow down potential causes of reduced power generation. In particular, because salt damage and corrosion require both on-site visual inspection and data, avoiding fragmentation of information is essential.


Checks for salt damage and corrosion that can lead to reduced power generation are basically carried out by separately inspecting six areas: the installation environment, mounting structures, wiring, junction boxes, the area around the panels, and power generation data and inspection procedures. Being close to the sea does not necessarily mean salt damage will occur; conversely, even sites somewhat distant from the sea can experience accelerated deterioration depending on wind direction, humidity, and drainage conditions. Also, finding rust does not immediately mean it is the primary cause of reduced power generation. What matters is recording where, to what extent, and since when deterioration has appeared, and judging it by correlating those records with changes in the power generation data.


If low power generation is left unaddressed, it affects not only the amount of electricity sold and self-consumption efficiency, but also equipment safety and maintenance planning. If detected at the stage of minor corrosion or dirt, it becomes easier to take phased measures such as cleaning, repairs, component replacement, drainage improvements, and revising inspection intervals. Conversely, if action is taken only after alarms or shutdowns occur, it takes longer to pinpoint the cause and the burden to restore service is greater. To detect signs of declining power generation early, it is important to handle on-site inspections and data checks within the same management process rather than separately.


For power generation facilities at risk of salt damage and corrosion, it is effective to continuously record and store daily power output, site photographs, and inspection records so they can be quickly compared when anomalies occur. Rather than relying on intuition to judge the cause of low power output, if you can link and manage location information, photos, inspection results, and generation data together, you can reduce oversights and clarify response priorities. By maintaining this kind of management, you can detect declines in power output caused by salt damage and corrosion early, making it easier to carry out planned maintenance that addresses both safety and generation performance.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.

bottom of page