5 Steps to Prepare Before Routine Inspections to Prevent Power Output Decline
By LRTK Team (Lefixea Inc.)
When you feel a solar power system is producing low power output, simply arranging an immediate on-site inspection can leave you facing the workday without having adequately isolated the cause. Routine inspections are not only for detecting equipment abnormalities but are an important opportunity to identify small changes that lead to reduced generation early and to prevent subsequent declines. To enhance their effectiveness, preparation before the inspection day is essential. By organizing past generation data, weather conditions, outage history, on-site photos, the inspection scope, and the work organization, you can more easily concentrate the limited inspection time on root-cause investigation and decisions about improvements.
Please translate the following input into English.
Table of Contents
• Approach to isolating the causes of low power generation before inspection
• Step 1 Align historical power generation and weather conditions
• Step 2 Check the shutdown history and alarm history for each piece of equipment
• Step 3 Prioritize in advance the areas to inspect on site
• Step 4 Prepare the work and safety conditions for the inspection day
• Prepare a record format that allows comparison after the Step 5 inspection.
• Summary The accuracy of inspections to prevent declines in power generation depends on advance preparation
How to isolate the causes of low power generation before inspection
When the power output of a solar power system is low, the cause is not necessarily a single one. Weather, solar irradiance, temperature, snowfall, shading, dirt on panel surfaces, wiring faults, power conditioner shutdowns, communication failures, and missing measurement values can overlap. Approaching the inspection by only confirming the situation after arriving on site can make the range of what the inspector needs to check too broad, risking that important signs will be overlooked. In pre-inspection preparation before routine inspections, it is important first to clarify "whether the problem really lies with the equipment," "whether it can be explained by meteorological or seasonal factors," and "whether only specific devices or sections are underperforming."
When judging a decrease in power generation, simply comparing to the previous day or the same day last year is insufficient. Because photovoltaic generation is strongly influenced by solar irradiance conditions, looking at generation alone can easily confuse natural decreases due to cloudy or rainy weather with decreases caused by equipment faults. Before inspection, check power generation, solar irradiance, temperature, weather, and equipment operating hours on as similar a time axis as possible. If there are consecutive days when generation is significantly lower relative to irradiance, prioritize checking the equipment. Conversely, if the period itself has low irradiance, it is important to treat it as a meteorological factor first and not rush to conclude there is an abnormality.
Also, the expression "low power generation" can refer either to a small daily generated energy or to an inability of instantaneous output to rise. The former is an issue of the integrated value over a day, while the latter is an issue of output decline in specific time periods. Sorting out this difference before inspection will change the items to be checked on the day. If only the daytime peak output is not increasing, candidates include temperature rise, output curtailment, power conditioner control, and partial string faults. If the generation over the whole day is low, you should check downtime, communication loss, soiling, shading, snow accumulation, and widespread equipment degradation.
The purpose of regular inspections is not just to find abnormalities. To prevent a decline in power generation, it is essential to record changes that occur before an abnormality and to understand the differences from the previous inspection. For example, changes such as a gradual drop in generation in the same section, output fluctuations that occur only at certain times, or parts that recover more slowly after rain are difficult to judge from on-site observation alone. If you review the data and form hypotheses before the inspection, you can take actions on site to verify those hypotheses.
Furthermore, in preparatory work you need to decide not only what to go and inspect but also what not to inspect. If you try to inspect everything with the same level of scrutiny, there will not be enough time and the result tends to be superficial checks. Prioritizing sections that show signs of reduced power generation, equipment that previously stopped or triggered alarms, locations prone to soiling or shading, and items placed under observation in the previous inspection will improve inspection accuracy. Consider preparation before routine inspections not only as a way to streamline the inspection day but also as the process of gathering the information needed to avoid leaving low-generation conditions unaddressed.
Step 1 Align historical power generation and weather conditions
The first preparation to make is to align past power generation data with meteorological conditions. To determine whether power output is low, you need a basis for comparison. Simply being lower than the previous day, lower than last month, or lower than the previous year can be a weak basis for judgment. Solar power generation experiences changes in hours of sunshine depending on the season, variations in solar irradiance depending on the weather, and the equipment’s output is also affected by temperature. Therefore, when confirming a drop in power generation, it is important to compare under consistent generation conditions rather than relying on simple numerical comparisons.
Before an inspection, check at least the power generation for the past several weeks to several months, and, if possible, also review the trend for the same period in the previous year. Check not only daily generation but also output trends by time of day, since this makes it easier to see how any decline manifests. For example, the causes to consider differ depending on whether output is generally low from morning to evening, only low around midday, or suddenly drops during a specific time period. If output is low overall, weather, soiling, or wide-area equipment condition may be involved. If output is low only during specific times, focus on checking shading, temperature, output control, and equipment operating conditions.
What you should check along with power generation is solar irradiance. When solar irradiance data are available, examine its relationship with power generation. If there are days when solar irradiance is high but power generation does not increase, equipment-related causes become more likely. Conversely, if power generation is low on a day when solar irradiance is also low, the decrease can sometimes be explained by meteorological conditions. When using pyranometer or meteorological observation instrument values, pay attention to instrument soiling, installation angle, shading, and communication dropouts. If the solar irradiance data are misaligned, the assessment of equipment abnormalities will also be skewed.
Temperature is also important. Solar panels tend to have reduced output at high temperatures, so on clear summer days the output may not increase as much as expected even when solar irradiance is high. If this is judged to be a failure, unnecessary inspections can multiply. However, if the output is clearly lower compared with past data under similar temperature and irradiance conditions, it is necessary to check the condition of the equipment or circuits. Before inspections, align power generation, solar irradiance, and temperature for the same dates and time periods and extract candidate anomaly days; this makes clear what to check on site.
Also, in addition to monthly and annual generation, when trends can be checked by section within the facility, by power conditioner, and by string, we examine them as closely as possible. Even if the plant as a whole appears to show only a slight decline, particular sections may have a large drop. If you only look at the overall values, localized declines can be averaged out and detection of anomalies can be delayed. If you check the differences between sections before a scheduled inspection, you can prioritize checking the relevant areas on the day.
When aligning data, pay attention to missing values and communication outages. Even if generation appears low, it may be that part of the measurement data is simply missing. Conversely, after communication is restored, values may be reflected all at once, making them look different from normal. In pre-inspection preparation, it is necessary to distinguish whether equipment truly generated little power on a low-generation day or whether the records were not captured. By verifying the reliability of the records at this stage, you can reduce unnecessary checks on the inspection day.
Step 2 Check the stoppage history and alarm history for each piece of equipment
Next to check are the shutdown history and alarm history for each piece of equipment. Causes of low power generation can include power conditioner shutdowns, shutdowns due to grid-side conditions, protective device operations, communication abnormalities, changes in switchgear status, and so on. Even if you inspect the equipment on site on the day of a scheduled maintenance, temporary shutdowns that occurred in the past or alarms that have already been cleared can be difficult to see. Therefore, it is important to review the histories before the inspection and organize which equipment experienced what kind of anomaly or shutdown and when.
When reviewing outage logs, check not only whether an outage occurred but also the outage duration, the time of day it happened, and how the system was restored. Even short outages can significantly affect daily generation if they occur during daytime peak generation hours. Conversely, outages recorded at night or during periods of low sunlight may have only a limited impact on generation. By cross-referencing days with low generation against the outage log to see if they coincide, you can narrow down the list of possible causes.
For alarm histories, it is important to look at the number of occurrences and recurrence. An alarm that occurred only once and has not recurred and an alarm that appears repeatedly differ in inspection priority. If an alarm is recurring on a specific piece of equipment, that equipment and its surrounding circuits should be checked with priority. For example, if temperature-related alarms recur during the daytime, be prepared to check the installation environment, ventilation, nearby contamination, and the internal condition of the equipment. If alarms related to voltage or insulation are occurring, carefully plan and arrange on-site measurements and safety checks.
When reviewing historical records, it is important to link equipment-level information with overall generation trends. Even if the power plant’s total output appears low, there are cases where the cause is simply that some power conditioners were offline. If multiple devices stopped during the same time period, consider not only individual equipment but also grid conditions, shared equipment, communications, and environmental factors. Organizing these relationships before a scheduled inspection makes it easier on site to determine "which equipment to inspect" and "whether to suspect common causes."
Furthermore, rather than judging alarm history by record names alone, organize it by replacing those names with terms that equipment managers and maintenance personnel can understand, making it more practical to use. If you only print and bring the wording displayed on the history screen, confirming the meaning on site can take time. Before inspections, summarize the alarm details, the range that could be affected, the components to check, and past response history so inspectors can more easily align their understanding. If the same alarm has occurred in the past and cleaning, parts replacement, configuration checks, or similar actions were taken, it's also advisable to check how power generation changed after those responses.
The purpose of checking shutdown and alarm histories is not to assign blame but to determine inspection priorities. A recorded history does not necessarily mean the equipment is faulty, but equipment with such histories is worth checking for a possible correlation with reduced power output. In particular, if a history coincides with a day of low power generation, it should be prioritized for on-site verification. By completing this sorting before inspections, routine checks become not merely visual confirmations but data-driven investigations into the cause.
Step 3 Prioritize in advance the areas to inspect on site
The third step is to prioritize in advance which areas to inspect on site. The inspection scope of a solar power generation facility is wide-ranging, covering panels, mounting structures, wiring, junction boxes, power conditioners, substation equipment, measuring instruments, communications equipment, drainage, surrounding vegetation, fences, access ways, and more. If you try to check everything uniformly within a limited time, you may end up conducting only superficial inspections of areas that directly affect power output. Before an inspection, it is important to decide which areas to focus on based on data and past records.
When determining priorities, first identify the sections that tend to have lower power generation. If you have generation data by section or by device, extract locations that are clearly lower compared with their surroundings. For those sections, check whether they share conditions such as being prone to shading, prone to dirt accumulation, having poor slope or drainage conditions, a history of faults, long cable routes, or harsh equipment installation environments. On site, inspecting with these conditions in mind makes it easier to find the causes of the decline.
Dirt and shading on the panel surface are easily overlooked causes of reduced power generation. Dirt may be spread thinly across the entire surface, or it may adhere locally from bird droppings, fallen leaves, soil, pollen, or dust. Shadows also change depending on the season and time of day, so they may not be identifiable from an inspection conducted at a single time. Checking the times when power generation drops before an inspection makes it easier to consider whether shading is occurring during those periods. If on-site photos or past records are available, include verification of tree growth, changes to surrounding structures, and the installation of temporary structures.
Checking wiring and connection points is also important. If low power output is concentrated in specific strings or sections, issues such as broken wires, poor contacts, degradation around connectors, cable damage, or abnormalities inside junction boxes may be involved. However, electrical inspections require safety management and specialized procedures. Before inspection, decide which areas will be visually checked and which will be subject to measurement, and prepare the necessary personnel, measuring instruments, and work permits. Rather than trying to expand on-site judgments, determining the inspection scope in advance contributes to both safety and efficiency.
The environment around equipment is also considered when setting priorities. Conditions such as overgrown vegetation around power conditioners and junction boxes, poor ventilation, a tendency for rainwater to accumulate, easy ingress of dust, or susceptibility to direct sunlight and high temperatures can affect equipment operation and deterioration. Before an inspection, review past photographs to confirm that the surrounding environment has not changed. In particular, if the season has changed since the last inspection, vegetation and drainage conditions may have changed significantly.
Once priorities are set, create a checklist to use on the inspection day. Decide in advance which section to inspect first, which equipment histories to check, which locations to photograph, and which values to record so you can reduce the time spent hesitating on site. Causes of reduced power output can sometimes be discovered by chance in the field, but verifying them according to prepared hypotheses leads to more reproducible inspections. If there are multiple inspectors, it is also important to share the points to check in advance so everyone can verify using the same criteria.
Step 4 Prepare work and safety conditions for the inspection day
The fourth step is to arrange the working and safety conditions for the inspection day. Inspections aimed at preventing decreases in power generation require accurate data checks and on-site verification, but as a prerequisite it is necessary to ensure that work can be carried out safely. Because solar power generation equipment produces electricity during the day, there is an electrical hazard. There are also hazards due to site conditions such as roofs, slopes, developed land, grassy areas, mud, and narrow walkways. During the preparatory phase it is essential to confirm the work area, access routes, weather, required protective equipment, and communication arrangements.
Weather on the day of inspection affects both checking the power generation status and safety. In rainy or windy conditions, slipperiness, the risk of electric shock, and unstable measurement conditions can become issues. Conversely, on sunny days it is easier to confirm power output and operating conditions, but attention must be paid to high temperatures, heatstroke, and rising equipment temperatures. To determine the causes of low power generation, it can be effective to inspect on days when declines are likely to occur, but this should not be done at the expense of safety. Before the inspection, share the conditions for conducting the work and the criteria for deciding to cancel with all stakeholders.
As a work condition, it is important to separate items to be checked with the equipment stopped from those to be checked while it is operating. There are output and alarm conditions that can only be confirmed while the unit is generating power, but there are also areas that cannot be safely inspected unless the equipment is shut down. Before inspections, clarify which tasks require a shutdown, how much power generation will be affected if a shutdown occurs, and who will verify the restart. Shutdown and restart operations must follow the equipment management procedures, and responsible personnel need to align their understanding. Ensuring that the inspection work itself does not cause unnecessary reductions in power generation is also part of the pre-inspection preparations.
Preparation of necessary tools and recording equipment should not be overlooked. Even if the points to be checked on site are decided, if measuring instruments, recording terminals, spare power supplies, lighting, cleaning tools, reference materials for display verification, drawings, past photos, etc. are lacking, the quality of the inspection will decline. This is especially true for large power plants, where just returning to an office or vehicle on site takes time. Before the inspection, identify the tools required for each check item and compile them as the items to carry on the day. Also confirm that drawings and equipment numbers match the on-site labels, which can reduce recording errors.
As part of safety procedures, also confirm how workers will communicate with each other and how emergencies will be handled. When multiple people inspect separate sections, make clear who will be in which area, who to contact if an abnormality is found, and who will decide to temporarily stop work. In locations with unstable communications, it is necessary to verify the means of contact in advance. If focusing too much on confirming a drop in power generation causes safety checks to be postponed, the risk associated with the inspection itself increases. Establishing a system that allows inspections to be carried out safely will ultimately lead to a more reliable investigation of the cause.
Also, the working hours on the inspection day are important. If you want to confirm a low power generation condition, it is effective to schedule the visit so you can perform on-site checks during the times when declines are likely to occur. If shadowing is suspected, you need to inspect the site during the times when shadows appear. If output drops due to high temperatures or equipment alarms are suspected, you may need to check during daytime peak hours. However, if it is difficult to carry out all checks on the same day, combine on-site inspections with data checks and make a realistic plan. If preparations are in place before the inspection, you can efficiently gather information related to power output declines even within a limited time.
Step 5 Prepare a record format that allows comparison after inspection
The fifth step is to prepare a record format that can be compared after inspections. Periodic inspections do not end with finding anomalies on the day. To prevent a decline in power generation, you need to keep the information obtained during inspections in a form that can be compared with future inspections. If records are vague, when you next notice lower power generation you won’t know whether it has worsened compared with the previous inspection or has been the same for some time. By preparing the record format before the inspection, you can ensure that all necessary information is captured on site.
In the recording format, make it possible to record the inspection date, weather, temperature, inspection time, inspected section, equipment number, power generation status, presence or absence of abnormalities, photo number, actions taken, and whether follow-up monitoring is required in the same format. Especially in inspections related to decreased power generation, matching photos with data is important. For example, if you photograph soiling on a specific section, ensure you can later check how that section's power generation compared with the surrounding areas. If photos, numerical data, and written descriptions are stored separately, they become difficult to use for root cause analysis.
In photographic records, it is useful to photograph the same direction, the same distance, and the same subject each time. If the shooting position differs greatly between the previous and current shots, it becomes difficult to compare dirt, vegetation, shadows, and changes around equipment. Decide on the subject to be photographed before inspection, and, if necessary, bring past photos to make it easier to record the same composition. For sections with low power generation, keeping separate shots of the overall view, close-ups, equipment displays, and the surrounding environment makes it easier to review causes later. Link photos to information that identifies the date and subject so they do not remain mere site photographs.
In numerical records, you need not only a field to enter measured values but also a field to record measurement conditions. Even the same voltage or current values can mean different things depending on solar irradiance conditions or the measurement time. If you do not record whether the values were taken during power generation or after shutdown, whether it was sunny or cloudy, and which equipment was targeted, comparisons later will become difficult.
If you prepare the recording format before inspection, it will clarify what needs to be noted on site and reduce variability in records among personnel.
Records should also include the status of actions taken after inspections. Even when locations suspected of a decline in power output are identified, they can be categorized into those that require immediate repair, those that need cleaning, those to be monitored over time, and those that require additional measurements. Even if a decision cannot be made at the time of inspection, recording what will be checked next makes it less likely that follow-up will be interrupted. If the same issues are raised at every regular inspection without leading to improvement, there may be problems with how records are kept or with the management of responses. To prevent declines in power output, a system is needed to turn inspection results into actions.
Also, the recording format should be easy to understand not only for on-site personnel but also for managers and clients. If you record using only technical symbols and abbreviations, people who review it later may not be able to interpret the content. Leaving, in plain language, the potential factors that may be related to low power output, what was checked, your current assessment, and the next steps makes it easier to share information among stakeholders. Preparing the recording format before inspection improves the quality of post-inspection reports and helps lay the groundwork for preventing recurrence of power generation declines.
Summary: The accuracy of inspections to prevent a decline in power generation depends on advance preparation
In periodic inspections to prevent declines in power generation, not only what you look at on site but also how much you can prepare beforehand determines the outcome. If you head to the site feeling that the power output is low without checking past data and weather conditions, you are likely to confuse a natural decline due to weather with an equipment fault. Conversely, if you organize in advance the power output, solar irradiance, temperature, shutdown history, alarm history, and trends by section, on the inspection day you can concentrate your checks on the candidate causes.
The basic rule for pre-inspection preparation is not to judge a drop in power generation by a single number. By looking at daily generation, output by time of day, equipment-specific data, weather conditions, downtime, and the site environment together, the background causes of the decline become easier to see. If you sort out whether the low generation is affecting the entire facility, only certain sections, or only specific time periods, you can determine inspection priorities. Preparation before routine inspections is an important step not only to improve work efficiency but also to reduce oversights.
Also, preparing the safety conditions and work conditions for the inspection day is indispensable. Equipment that is generating power poses electrical hazards, and depending on the site environment there are risks such as falls, heatstroke, strong winds, and muddy conditions. Confirm in advance which tasks can be performed with equipment running and which require shutdown, and by ensuring the necessary personnel, tools, and communication arrangements are in place, you can achieve a safe and reliable inspection. It is important to clarify the procedures so that the inspection itself does not cause equipment shutdowns or omissions in records.
Furthermore, keeping inspection results in a format that can be compared with subsequent inspections helps prevent declines in power output. If photos, measurements, inspection times, weather conditions, and actions taken are organized, you can check the differences from the previous inspection the next time you notice low output. Continuously tracking small changes makes it easier to respond before a failure or major drop occurs. Periodic inspections should be regarded not as one-off tasks but as an ongoing process for managing the condition of power generation equipment.
Preparations before regular inspections to prevent decreases in power generation center on five items: assembling past data, checking shutdown and alarm histories, prioritizing the locations to inspect on site, arranging work and safety conditions, and preparing record formats that allow comparison after the inspection. By carrying out these five steps carefully, the checks on the day of inspection become more specific, and the likelihood of overlooking the causes of low power generation is reduced.
If you want to continuously monitor the condition of power generation equipment and detect downward trends in power output early, it is important to manage on-site records and generation data together. By establishing a system that smoothly links preparation before regular inspections, on-site verification, and post-inspection comparisons, it becomes easier to prevent declines in generation and respond promptly. Putting operational procedures in place that organize generation data, inspection records, photos, and response histories to the same standard—without relying on specific products or services—forms the foundation for continuous equipment management.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.