Network RTK makes inspection records accurate and convenient: Automate location capture to streamline reporting

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

In periodic inspections and maintenance of infrastructure assets, it is essential to record on-site conditions in detail so they can be accurately understood later. In particular, the accuracy of "location information" about where something occurred affects the credibility of reports and the efficiency of follow-up work. Traditionally, however, location recording at inspection sites has not been particularly precise or convenient: inspectors often mark paper drawings by hand or obtain only coarse coordinates with GPS-equipped cameras. As a result, problems such as "the location written in the report did not match the actual site, causing extra verification work" or "it was hard to identify the damaged spot in the photo on the ground" are commonly observed.


The key to solving these problems and making inspection records more accurate and efficient is high-precision positioning using network RTK (Real Time Kinematic). By using network RTK, GNSS satellite positioning can achieve centimeter-level accuracy (cm level accuracy; half-inch accuracy), allowing a smartphone or dedicated terminal to automatically capture the current location during inspection and record it. Because this links on-site coordinates directly to site photos and inspection data without manual transcription of coordinates or setting up surveying equipment, it can greatly streamline reporting tasks.


This article first outlines the basics of GNSS positioning and network RTK. It then summarizes current challenges in recording location information during infrastructure inspections and how high-precision positioning can address them. Next, it explains the improved traceability and error-prevention effects of accurately recording on-site coordinates, and the benefits enabled by automatic location capture such as automated report generation, remote sharing, and integration with digital ledgers. Finally, as future prospects it touches on simplified surveying using the latest LRTK technology and the potential for RTK-assisted AR (augmented reality) inspection support, introducing the expanding use of network RTK.


Overview of GNSS positioning and network RTK

GNSS (Global Navigation Satellite System) is a general term for satellite-based positioning systems represented by GPS. Systems such as GPS (United States), GLONASS (Russia), Galileo (EU), and Japan’s QZSS (Michibiki) use signals received from multiple satellites to determine a user’s position (latitude, longitude, altitude). However, ordinary GNSS positioning incurs position errors of several meters (several ft) due to satellite signal errors and ionospheric effects. Therefore, position information obtained from smartphones or consumer GNSS devices is only a rough guide and does not reach the centimeter-level accuracy required for infrastructure inspection.


RTK positioning (Real Time Kinematic) corrects these errors in real time and enables centimeter-level positioning. In RTK, a second GNSS receiver placed nearby (a base station) calculates the difference between its known precise position and the position indicated by satellite signals, then sends that correction to the moving receiver (the rover), which applies the correction to its own solution. Because relative positioning with the base station cancels common error sources, horizontal accuracy of a few centimeters (a few in) can be achieved under favorable conditions. Errors from satellite or clock biases and signal delays in the ionosphere and troposphere can be canceled because both base and rover receive the same satellite signals, enabling precise horizontal positioning on the order of 1-2 cm (0.4-0.8 in). Traditionally, a base station had to be set up on a tripod at each site and corrections transmitted by radio, but a newer approach eliminates this effort: network RTK.


With network RTK, users can access a network of multiple reference stations, such as the Geospatial Information Authority of Japan’s continuously operating reference stations (approximately 1,300 sites nationwide). The user’s GNSS receiver functions as a rover and receives correction data over the Internet via mobile communications. For example, in the VRS (virtual reference station) method, correction data are computed as if a virtual base station existed near the user’s approximate position and distributed in real time using a protocol such as Ntrip. This allows a single rover to perform high-precision positioning anywhere without installing a personal base station. However, using network RTK requires a dedicated service contract and a stable Internet connection (in mountainous areas out of communication range, conventional RTK or satellite-based augmentation services may be considered). In Japan, the QZSS “Michibiki” provides a centimeter-class augmentation service (CLAS) via satellite communications as another option. Because CLAS can supply correction information directly from satellites without relying on terrestrial communication infrastructure, it is a useful complement to network RTK.


Recently, network RTK has spread beyond public surveying to construction ICT, automated drone flight, agriculture, and autonomous driving. High-precision GNSS receivers have become smaller and cheaper, and portable RTK devices that work with smartphones have appeared. As a result, environments where non-surveying specialists can easily use centimeter-class positioning are becoming available in infrastructure inspection and maintenance. That said, high-precision GNSS positioning requires a clear view of satellite signals. In urban canyons, under trees, or inside tunnels, the number of visible satellites may be insufficient or multipath from reflections may increase, making RTK difficult. To operate RTK reliably, it is important to choose locations with an open sky when measuring and to increase satellite availability by using multi-GNSS receivers and augmentation satellites.


Challenges in recording location information for inspections

There are several challenges in recording location information for infrastructure inspections. The following problems are often reported from the field:


• Difficulty obtaining accurate coordinates: When positions are recorded manually based on drawings or local landmarks, accuracy is inevitably limited. Consumer GPS units and smartphone location data have large errors and are insufficient to pinpoint detailed inspection points.

• Labor and risk of mistakes in recording: Tasks such as inspectors writing coordinates into notebooks or later annotating photos with capture times and place names are time-consuming and prone to human error, such as transcription mistakes.

• Linking photos to locations: Even if photos are taken during inspection, it can be difficult later to know which spot within a facility each photo shows. On site, inspectors sometimes number photos sequentially by hand and record locations separately in notes, but this is cumbersome.

• Difficulty sharing and utilizing data: When records are kept on paper forms or spreadsheets, it is not easy to share inspection records containing location information with other departments or to use them in mapping systems. Formats vary by site, and entering data into a digital ledger system is time-consuming.


These inefficiencies in recording and managing location information increase the overall reporting burden and can lead to duplicated work or mistakes in information transfer. As a result, time is often spent locating positions when re-checking sites based on reports, or rework becomes necessary after recording errors are discovered. How, then, can adopting network RTK improve these issues?


Benefits of accurate on-site coordinate records

With network RTK, inspectors can obtain and record precise coordinates of inspection points on site. In particular, when aligning with reference coordinate systems (georeferencing), measurement results can be recorded in the same local coordinate system used for design drawings, making it easy to locate positions on drawings or cross-check with other data later. Even when a report states something like “crack at the base of pier A2 of bridge XX,” ambiguity can remain; including coordinates ensures everyone recognizes the same location.


Accurate location records greatly enhance traceability. For example, tagging a deterioration spot on a structure with coordinates allows exactly the same point to be revisited at the next inspection to compare deterioration progression. Overlaying inspection results over several years on a map enables advanced maintenance management such as analyzing the distribution and trends of damage. Automatic capture of location information also helps prevent recording errors, such as misreading handwritten notes or transcribing wrong numbers. Coordinates saved on a device at the push of a button can be synced to the cloud as-is, eliminating the need to rewrite them on paper and removing opportunities for human error. Furthermore, accumulated precise location data ensure accurate handover when personnel change. Because inspection points are clearly displayed on a map, less-experienced technicians can locate targets on site using past records, supporting skill transfer. If a system can also record photo orientation alongside precise coordinates, reviewers looking at photos later need not worry about misinterpreting which direction or exact point a photo shows.


Streamlining reporting: automated recording and digital integration

Automatic location capture via network RTK can greatly improve efficiency in report generation and data management. Coordinates and photos acquired at an inspection site are recorded digitally without manual sorting, enabling automated form generation. For example, if an inspector uses a mobile inspection app to enter asset names and inspection items while taking photos, each image can be tagged with high-precision latitude/longitude and site coordinates. These data can be aggregated in the cloud to automatically generate reports or checklists in prescribed formats or to output inspection result lists with maps. Processes that used to require transcribing field notes into spreadsheets or pasting photos onto report sheets are reduced, lowering workload and speeding up delivery.


Because data can be shared immediately via the cloud, remote information sharing becomes smooth. Managers and partner companies can check inspection progress on a map in real time from the office, receive coordinates and photos of anomalies, and quickly devise responses. This is especially valuable in post-disaster damage assessments, where sharing geotagged photos from the field and updating a headquarters’ damage map can contribute to rapid initial response. Geospatially linked data can also be imported directly into GIS (geographic information systems) or maintenance management digital ledgers. If accurate site coordinates and findings recorded in the field can be linked with the corresponding asset in an asset management system or reflected on a map-based ledger with one click, transcription errors downstream are avoided. Eliminating the need to mail or circulate paper documents or maintain duplicate manual entries reduces waste and enables consistent use of data from the field to the office and into future rehabilitation planning—one of the major strengths of digitization enabled by network RTK.


Future prospects: simplified surveying with LRTK and AR inspection support

Advances in high-precision positioning will open up new applications. One example is LRTK, a simplified RTK system that works with smartphones. Using pocket-sized devices and a smartphone app, LRTK can provide centimeter-class positioning, making surveying tasks that once required specialist equipment much easier. For simple surveying—measuring a few reference points on site—inspectors themselves can perform short measurements, applying the results to tasks such as pre- and post-repair dimensional checks or displacement measurements. For instance, by walking while pointing a smartphone’s LiDAR camera and using LRTK, it has become realistic to capture a 3D point cloud of a large slope in about one minute and measure volume or shape changes. Because captured point clouds are tied to global coordinates, they can be used to monitor overall terrain changes and manage as-built conditions, which was difficult before. Combining smartphone or tablet cameras and LiDAR to capture local 3D point clouds for as-built management or detailed records of deformations is also becoming practically feasible.


Another promising application is AR (augmented reality) inspection support using RTK’s high precision. AR overlays digital information on the real world seen through a device’s screen, but accurate alignment has been a challenge. When combined with cm-level positioning, markers and annotations based on coordinates from drawings can be overlaid on the real environment with minimal error. For example, AR can display previously recorded deterioration locations in space so inspectors can immediately find those spots during new inspections. It can also project routes of underground utilities or inspection items from structural drawings onto live site footage to visualize hidden risks. Moreover, overlaying 3D design models (BIM/CIM data) on site imagery enables on-the-spot verification of workmanship. Accurate position data accumulated via network RTK will be a key enabler that, when integrated with these advanced technologies, further improves the quality and efficiency of inspection work.


Conclusion

Automatic location capture with network RTK is a solution that can dramatically improve the quality and efficiency of infrastructure inspections. Based on accurate data and active use of modern technologies, it can reduce field workload and improve safety. Fortunately, RTK-capable, easy-to-use receivers and services have become more common in recent years, and the era in which field technicians themselves can handle centimeter-class positioning once reserved for specialists has arrived. By appropriately adopting network RTK, take a step forward in the DX (digital transformation) of inspection and maintenance tasks. As high-precision positioning technology becomes more widespread, inspection workflows are likely to change significantly. With precise location information as an ally, let’s promote smarter infrastructure management. With the use of network RTK, we can pioneer the future of infrastructure inspection.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.