Streamline Alignment Without Markers: 5 Rules for Successful Automatic Coordinate Assignment
By LRTK Team (Lefixea Inc.)
Table of Contents
• Rule 1: Automatically acquire coordinates with high-precision GNSS
• Rule 2: Simplify alignment by assigning coordinates during measurement
• Rule 3: Improve site efficiency by omitting marker installation
• Rule 4: Verify data on site to ensure accuracy
• Rule 5: Integrate multiple datasets with absolute coordinates for smooth overlay
• Conclusion
The traditional method of placing markers on site to assign coordinates to photos or measurement data has long been widely used in surveying and 3D measurement. However, installing and measuring markers is time-consuming and labor-intensive, and it becomes a significant burden especially on large sites or at heights. Recently, techniques that perform alignment without such markers and automatically assign coordinates to data have been attracting attention. For example, in aerial photogrammetry using drones, the conventional approach was to place multiple ground control targets (markers) and tie aerial photos to those control points. In recent years, however, drones equipped with RTK-capable high-precision GNSS have become common, making it possible to produce accurate maps even with far fewer markers. For terrestrial 3D laser scanning as well, placing targets at each location to register scan data was once common, but combining positioning sensors now makes markerless, wide-area measurements in a single pass increasingly feasible.
"Streamlining alignment without marker installation" means enabling accurate alignment among acquired photos or point cloud datasets without placing physical reference targets (markers) on site. "Automatic coordinate assignment" refers to a system that assigns positioning-derived coordinate values to each dataset at the time of measurement so that manual alignment later is unnecessary. If this can be achieved, the cumbersome alignment tasks that were traditionally required can be greatly simplified, reducing preparation and post-processing time on site.
Practically speaking, successfully auto-assigning coordinates without markers requires attention to several points. From leveraging high-precision positioning technologies to data acquisition methods, on-site verification, and multi-dataset integration, it is important to organize the key points to ensure success. This article introduces five rules for successfully streamlining alignment without marker installation. By keeping these points in mind, you can realize a smart surveying and measurement workflow that does not rely on markers.
In fact, markerless measurement is already being introduced at some surveying sites. There are reports where preparation time previously spent installing markers was dramatically reduced, and accuracy verification of acquired data showed results comparable to traditional methods, demonstrating the effectiveness of the new techniques. If clear advantages over conventional approaches are demonstrated, it is expected that this trend will become increasingly widespread.
Rule 1: Automatically acquire coordinates with high-precision GNSS
To assign coordinates to data without relying on markers, you need to know your position with high accuracy at the time of measurement. The key to this is the use of a satellite positioning system (GNSS). Standard GPS built into smartphones can have errors of several meters (several ft), but high-precision GNSS can provide centimeter-level positioning (cm level accuracy, half-inch accuracy). High-precision GNSS uses signals from multiple satellites plus correction information (such as base stations or network-based RTK) to cancel errors. This mechanism enables you to obtain your position coordinates in real time with very high accuracy.
The idea is to omit marker placement and instead directly obtain coordinates of each data acquisition point using GNSS. If you record the instrument’s position with a high-precision GNSS receiver during photography or laser scanning, you can tag the acquired data with accurate coordinate metadata at that time. This makes it immediately clear during processing where each dataset was captured, eliminating the need to cross-check marker positions later.
High-precision GNSS equipment has become smaller and easier to handle in recent years. In addition to dedicated surveying instruments, GNSS receivers that can connect to smartphones and tablets are now available, enabling anyone to obtain centimeter accuracy (cm level accuracy, half-inch accuracy) position information easily. The first step to successful markerless alignment is to introduce a system for automatic coordinate acquisition using such high-precision GNSS and to create an environment where accurate position information is obtained simultaneously with data collection.
For example, in photogrammetry, if each photo is tagged with high-precision position coordinates (latitude/longitude, etc.), the images will be automatically placed in the correct positions when imported into dedicated software. In the case of a laser scanner, if the instrument’s motion is tracked by GNSS from the start to the end of scanning, the resulting point cloud will be output already projected into the real-world coordinate system. In either case, because each dataset has absolute position information in the world coordinate system, you can produce consistent results without reference markers.
If you want the measurement results to align with a project-specific local coordinate system (such as construction reference coordinates or a plane rectangular coordinate system), high-precision GNSS can handle that too. For example, you can measure known control points with GNSS and use those coordinates as a reference to shift the entire dataset, converting the acquired point cloud or photos into any desired coordinate system. Because automatically assigned coordinates can be converted later into the required reference system, this flexibility is another advantage that allows adaptation to project requirements.
Rule 2: Simplify alignment by assigning coordinates during measurement
With conventional marker-based methods, after acquiring data (photos or point clouds) on site you would later align them by matching to the marker position information. This process required finding the markers visible in images and assigning correspondences in software, or manually registering multiple point cloud datasets afterward. With automatic coordinate assignment, however, position information is recorded simultaneously with measurement, so these complicated alignment processes can be greatly simplified.
When data acquisition and coordinate assignment occur simultaneously, the data are georeferenced at the moment of capture. For example, using equipment that combines a laser scanner or camera with high-precision GNSS allows you to measure your coordinates in real time while scanning the terrain. As a result, the acquired point clouds or photos are output with geolocation from the outset, and the relative positions among datasets are largely resolved by the time field work is finished. This greatly reduces the time required for alignment in later processing and directly improves data processing efficiency.
The key point of this rule is to integrate "measuring" and "positioning" rather than treating them as separate steps. Imagine completing the coordinate registration during the measurement itself instead of as a separate task. Beyond advanced examples like dedicated mobile mapping systems or RTK-enabled drones, there are now solutions for smart devices that perform measurement and positioning simultaneously. The important thing is to incorporate this simultaneous coordinate assignment into your workflow so that no additional alignment work is necessary.
This approach also has accuracy benefits. When marker alignment is done manually, human errors such as mismatches or incorrect coordinate entry can occur; automatic coordinate assignment reduces those risks. Assigning position information at acquisition removes the worry of misidentifying which data correspond to which locations, and reduces verification work downstream. The benefits are especially significant when handling large numbers of photos or scan datasets.
Traditionally, it was not uncommon to spend an entire day in the office performing alignment after fieldwork, but by adopting simultaneous coordinate assignment you can have datasets aligned upon completion of on-site work, significantly shortening overall lead times.
Rule 3: Improve site efficiency by omitting marker installation
In the conventional marker-based workflow, surveyors had to go to the site, place reference targets, and measure the coordinates of each. For large areas, many markers had to be deployed, and the time and manpower for preparation were nontrivial. Also, placing markers at heights or in hazardous locations increased the effort needed to ensure safety. These tasks of installing and removing markers often imposed a greater burden on fieldwork than the measurement itself.
Using automatic coordinate assignment allows you to omit these marker installation steps altogether. As described above, if you obtain coordinates for each point using GNSS while measuring, there is no need to place physical targets to create known points. This dramatically shortens on-site preparation time and makes startup for measurement much quicker. For example, where teams used to spend the morning placing markers with multiple people before starting photography or scanning, a markerless approach allows measurement to begin as soon as the equipment is set up. Fewer personnel are required, and one-person operation becomes feasible. In today’s climate of labor shortages, the ability for a skilled technician to complete measurements alone is a major advantage. Not relying on marker placement enables small teams to operate sites efficiently.
Omitting marker installation also has safety and coordination benefits. If you no longer need to place markers on busy roads or inside operating factories, you reduce risk to workers and avoid the need for traffic controls or production stoppages. Being able to measure with minimal impact on the site is another reason markerless methods are favored.
Improved field efficiency frees time for other tasks and helps the overall project progress smoothly. In markerless surveying, the time savings from eliminating such procedures are substantial, contributing to cost reductions and shorter schedules. From an efficiency standpoint, building a workflow that does not depend on marker installation is highly meaningful. Faster site responsiveness also speeds up deliverables and increases client satisfaction.
Rule 4: Verify data on site to ensure accuracy
When measuring without markers, it is important to verify the positional accuracy and coverage of acquired data on site. If you return from the field without checking and later discover misaligned datasets or missing areas, it is too late. In markerless methods, making sure that automatically assigned coordinates are functioning correctly in real time is critical to success.
Fortunately, modern measurement systems make on-site verification easier. For instance, mobile scanning apps can display the point cloud being captured on a device screen in real time so you can check for missed areas while scanning. Even when scanning in multiple passes, some systems let you overlay previous point clouds with newly acquired data on site to check whether the positions align. Using tools like these allows you to visually confirm the alignment of datasets on site and achieve "zero omissions" in capture.
When using GNSS for measurement, you must also confirm that correction signals from satellites are being received correctly and that the solution is fixed (Fix). Positioning accuracy can degrade in locations shadowed by buildings or with dense tree cover, so adapt your reception setup as needed while working.
If possible, measuring a known reference point or a location with known coordinates and comparing the result is also effective. This verifies that the coordinates obtained with markerless measurement do not have significant deviations, giving you confidence in using the data.
On-site verification allows you to perform additional measurements or redo scans immediately if misalignments are found, reducing the risk of discovering problems back at the office. In markerless workflows, the data collected on site often become the sole basis for deliverables, so strict quality control is essential. To avoid compromising alignment accuracy, always check results in the field and incorporate a cycle of re-measurement as necessary. Making immediate on-site verification a habit leads to assured accuracy and improved overall project reliability.
Rule 5: Integrate multiple datasets with absolute coordinates for smooth overlay
Markerless surveying has the advantage that acquired datasets are tied to an absolute coordinate frame, making it easy to integrate multiple measurement results. Absolute coordinates refer to position information based on a common reference coordinate system such as a global geodetic system, and all data are expressed in this common coordinate frame. With automatic coordinate assignment, each dataset already has absolute coordinates at the time of acquisition, so datasets collected at different times or locations align precisely in space.
Consider measuring a large site by dividing it into areas. Traditionally, you would need to reconcile each area’s results afterward and carefully adjust boundaries to eliminate misalignment. If data are recorded with absolute coordinates, you can simply overlay the point clouds or models from each area and the whole site will be reproduced correctly. This is because every dataset shares the same coordinate axes rather than having disparate local references. In markerless methods, maintaining this "consistent coordinate reference" is crucial, and it makes combining multiple datasets significantly easier.
Also, because each dataset carries absolute coordinates, you do not need to worry about cumulative relative errors across sections. In traditional workflows, stitching together multiple surveys could lead to accumulating errors, but when all data are aligned to a common coordinate system from the start, you avoid such degradation in accuracy.
Data with absolute coordinates also integrate more easily with other geospatial information and design drawings. If surveying data are acquired in a public coordinate system, they can immediately be plotted on maps or overlaid on CAD drawings. You won’t be troubled by extra transformation steps or coordinate-matching tasks, enabling immediate use of surveying results. This high level of integrability is another major benefit of automatic coordinate assignment.
When comparing surveys conducted at different times, absolute coordinates also make it easier to quantify differences. For example, analyzing terrain changes before and after construction is smoother when measurements are captured in a consistent coordinate system, allowing straightforward extraction of differences.
In short, to successfully perform alignment without marker installation, it is crucial to "handle data in the same coordinate reference from start to finish." This ensures consistency even as datasets grow, and prevents confusion when adding later surveys or sharing data with others. Operating on the premise of integration via absolute coordinates contributes to both accuracy and efficiency in projects.
Conclusion
Automatic coordinate assignment to streamline alignment without marker installation brings major changes to surveying and measurement workflows. It eliminates the cumbersome tasks of marker placement and post-processing alignment, enabling faster fieldwork and reliable data integration. By following the five rules introduced here—centimeter-level coordinate acquisition with high-precision GNSS (cm level accuracy, half-inch accuracy), simultaneous measurement and positioning, omission of marker installation, rigorous on-site verification, and consistent data management in a common coordinate system—anyone can achieve high-accuracy, markerless results.
Practical, easy-to-implement solutions are already emerging. For example, using the GNSS high-precision positioning device "LRTK" that can be attached to an iPhone makes centimeter-level positioning possible even with a smartphone. Combined with a smartphone’s built-in camera or LiDAR sensor, you can obtain positioning information simultaneously with capture and assign coordinates in real time. The convenience of using a handheld smartphone rather than dedicated large equipment is also attractive. Without purchasing expensive surveying instruments, adding a small device can turn an existing smartphone into a precise positioning and 3D measurement tool. In other words, a single device in the palm of your hand can achieve surveying accuracy comparable to traditional marker-based methods. By adopting the latest technologies, efficient markerless surveying workflows are becoming a reality.
Automatic coordinate assignment that reduces marker installation effort while maintaining accuracy will likely become the standard for future surveying and point cloud measurement. This approach contributes to improved field productivity and cost reductions, so consider applying it to your projects. With advances in satellite positioning infrastructure and AI technologies, the accuracy and usability of markerless surveying are expected to improve further. As adoption grows, the surveying field is anticipated to become more efficient and sophisticated. These technologies that accelerate on-site digital transformation (DX) will continue to draw attention.
Next Steps:
Explore LRTK Products & Workflows
LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.
LRTK supercharges field accuracy and efficiency
The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.