Solo Surveying × LRTK: How We Achieved a 30% Reduction in Labor Hours Within One Week of Implementation

By LRTK Team (Lefixea Inc.)

All-in-One Surveying Device: LRTK Phone
text explanation of LRTK Phone

Introduction (Sharing the Problem)

Surveying work on construction sites has long relied on advanced specialized skills and multiple personnel. Using tools such as tape measures, leveling staffs, spirit levels, and total stations, the traditional method measures each survey point sequentially from control points, typically requiring a team of 2–3 people. For example, one person operates the instrument mounted on a tripod while another holds the staff at a distant point to mark positions—these multi-person coordinated tasks require significant time and effort from setup through teardown. On large sites or where many survey points are needed, surveying alone can easily take a full day.


Analog manual measurements also carry the risk of human error. Misreading staff graduations or recording mistakes can lead to re-measurement in later stages, increasing costs and delaying schedules.


From an efficiency standpoint, it is difficult to measure an entire site in detail, so crews often measure only locations that appear important. This, however, carries the risk of overlooking problems at unmeasured locations.


In recent years, the construction industry has faced chronic labor shortages and an aging workforce, making labor reduction and efficiency improvements critical challenges. As veteran surveyors decrease and continuing "person-dependent surveying" becomes difficult, there is demand for new methods that enable high-precision surveying with fewer personnel. One promising approach is solo surveying using GNSS (Global Navigation Satellite System) technology. By leveraging the latest GNSS positioning, it has become possible to reduce labor in tasks that formerly required multiple people while still achieving the required accuracy.


This article introduces the innovative tool "LRTK," which enabled solo surveying on site and reduced surveying labor by 30% in just one week after introduction. From comparisons with traditional surveying methods to the steps for implementing and using LRTK, the benefits achieved, why even new hires or earthwork crews can operate it, and examples of use in disaster sites, we explain everything step by step. Please read through to the end to learn about the reality and effects of this emerging norm—solo surveying in an era of labor shortages.


Comparison with Traditional Surveying Methods (Personnel, Time, Cost)

Before discussing the power of solo surveying with LRTK, let’s review how much manpower and time traditional surveying required. As noted above, conventional practice typically formed teams of two or more surveyors who used optical instruments and staffs to confirm relative positions. Because this method always requires multiple personnel, labor costs are a major burden. For example, a survey conducted by two people over half a day represents 2 people × 4 hours = 8 hours of total labor. As the number of survey points increases, more days and more people are needed, and across an entire site a significant portion of the budget was consumed by surveying alone.


In terms of time, traditional methods are often inefficient. Time is spent on instrument setup and leveling, communicating with the person carrying the staff, moving between survey points, and recording measurements. For wide-area surveys, instruments must be frequently repositioned, and in areas with poor line of sight it can be difficult to measure if target points fall into blind spots. Under such constraints, teams sometimes reduced the number of survey points, thinking “this should be sufficient,” which could sacrifice data accuracy and reliability.


The advent of GNSS-based surveying has the potential to change this situation. GNSS positioning using satellite signals can provide coordinates as long as the sky above is open, even where line-of-sight is poor. Because absolute coordinates can be obtained directly at each point over large areas, one person can handle the positional relationships between distant points. However, standalone GNSS (GPS) typically has errors on the order of several meters, so additional measures are required to achieve the centimeter-level accuracy demanded by construction surveying. That is where RTK (Real-Time Kinematic) comes in. RTK uses two GNSS receivers—one base and one rover—communicating to apply real-time differential corrections for common error sources, dramatically improving positioning accuracy. This made centimeter-level surveying possible and, since the 1990s, RTK has spread as an alternative to optical instruments. Yet traditional RTK equipment has often been bulky, expensive, and required specialized knowledge to operate. The need to set up a dedicated base station or prepare radio communication gear created a high barrier to entry, meaning that “high precision but not easy to use” did not directly translate to labor savings.


Against this backdrop, a solution that is easy to use and can deliver high-precision positioning with few people was eagerly awaited. LRTK was developed to meet that need. By combining a smartphone with a ultra-compact RTK-GNSS receiver, LRTK makes centimeter-level surveying possible for solo operators—a revolutionary system.


LRTK Implementation Process and How to Use It (On-Site Example)

Now let’s see the actual steps for conducting solo surveying using LRTK. Below is a detailed on-site example from the author’s experience when introducing LRTK, explaining the workflow and operation.


• Preparation: Upon arrival at the site, attach the LRTK device to your handheld iPhone using the dedicated smartphone case. Turn on the device and launch the LRTK app on the phone to begin receiving GNSS signals. On first use at a site, satellite acquisition may take a bit longer, but typically within several tens of seconds the system reaches an RTK high-precision positioning state (Fix solution), and you are ready to measure.

• Measurement: When you arrive at the point to be measured, simply tap the button in the smartphone app to instantly record the coordinates—latitude, longitude, and elevation—of that location. The assistant staff traditionally required is no longer necessary. There is no need to re-set up instruments each time you change points, so one person can collect data point after point. Even when surveying a large area, you can just walk around the site and the system will automatically capture many points, enabling a single operator to generate a terrain point cloud model much like a 3D scanner.

• Verification: Measurement results are displayed in a list on the phone screen in real time, and the app can calculate each point’s elevation and mutual distances on the spot. If you take photos on site, they are tagged with latitude, longitude, elevation, and camera orientation. This creates high-precision records where you can immediately see which point and direction a photo corresponds to when reviewing later.

• Sharing: After finishing the survey, upload the measurement data to shared cloud storage with a single tap from the app. By the time you return to the office, all relevant personnel can already view the data, allowing supervisors and colleagues to immediately check results. If there are any omissions or missed points, they can be pointed out early and additional measurements can be taken, reducing the need for later return visits.


As described above, using LRTK makes site surveying that formerly required several people astonishingly simple. Solo surveying with a smartphone and GNSS drastically improves efficiency, and immediate data sharing significantly enhances construction management. LRTK-enabled solo surveying truly symbolizes an era where “anyone can measure anywhere.”


Benefits (Labor Reduction and Work Efficiency)

Next, here are the actual benefits achieved after introducing LRTK at the author’s site. The greatest result is the substantial reduction in surveying labor. After LRTK was introduced, surveying tasks that had previously required two-person teams could be completed by one individual. As a result, in the first week after introduction, we reduced total survey labor by approximately 30%.


For example, in a case where two surveyors previously took half a day (8 person-hours total) to measure 50 points, after introducing LRTK one person could measure roughly the same number of points in a bit over half a day (about 5–6 hours of actual work). In simple terms, labor that used to require 8 hours of personnel time was reduced to 5–6 hours, representing over a 30% reduction in labor. This is a highly impactful improvement for site operations. Freed-up time can be used for other tasks, or personnel can be reassigned to other important duties, smoothing overall project progress.


Additionally, faster data sharing improves job preparation efficiency. Since survey results can be shared via the cloud on the same day, omissions or measurement errors that previously would have been discovered the next day can now be found and corrected immediately, enabling prompt additional measurements or fixes. Reduced rework has decreased communication loss between the field and office and streamlined the workflow. Using point cloud data obtained with LRTK also allows digital visualization of site conditions, simplifying meeting materials and reporting. Including these secondary effects, we felt that LRTK’s impact went beyond simple labor reduction to overall operational streamlining.


Furthermore, improvements in safety and quality are significant. Solo surveying reduces the need for prolonged work in heat or on unstable footing, lowering risks of heatstroke and accidents. Because sufficient data can be obtained in a short time with fewer people, workers’ on-site exposure time is shortened, enhancing safety. Digital measurements also reduce human error: visual readings and handwritten records become unnecessary, decreasing careless mistakes and improving the reliability of survey data. Combined with high measurement accuracy, this has reduced the number of quality-control issues during shape management and inspections, contributing to overall quality assurance of the construction.


Why New Hires or Earthwork Crews Can Operate It (Device Lightness and Usability)

LRTK contributes so much to on-site productivity because it is extremely easy to use. Notably, despite being a state-of-the-art surveying system, it can be operated immediately by new employees or less-skilled workers (so-called earthwork crews). Traditional survey equipment required complex operation and specialized knowledge, but LRTK lowers those barriers considerably.


First, the device is physically easy to handle. The LRTK unit itself weighs only in the 100-gram range, an ultra-lightweight size that remains easy to hold in one hand even when attached to an iPhone with the dedicated case. There is no need to carry tripods or long staffs; you can survey nimbly in tight spaces or on slopes. The light weight means it is not a heavy burden for older or physically weaker workers, so anyone can bring it to the site and use it.


Next, the user interface is intuitive and simple. Because it operates via a smartphone app, younger workers accustomed to smartphones readily accept it. Positioning and recording are completed with a single button press; no complex settings or manual calculations are required. Even beginners could start using it on site the same day after basic instruction. In our site, a first-year employee took charge of surveying with LRTK and quickly learned the process, enjoying it almost like a smartphone game.


LRTK also includes features that support users with limited surveying knowledge. The app clearly displays the current positioning status (such as whether an RTK fixed solution has been obtained) and issues warnings when positioning is unstable. Measurement data are automatically converted to geoid height and plane rectangular coordinate systems, so users do not need to know coordinate transformation techniques. In short, the difficult aspects are handled by the hardware and software as a “backstage” surveying function, allowing field personnel to concentrate on “point the device and press the button.” This enables inexperienced users to obtain high-quality survey results without mistakes and helps level up overall organizational technical capability even in the absence of veteran know-how.


Application and Advantages in Disaster Sites

Solo surveying with LRTK is highly effective not only for normal construction sites but also for disaster response. Immediately after major earthquakes or heavy rainfall events, rapid surveying—such as measuring the shape of collapsed slopes or assessing infrastructure damage—is essential for deciding restoration policies. Disaster sites shortly after an event are often dangerous with poor footing, and ideally you want to minimize personnel entry. LRTK enables the necessary surveys to be conducted safely with the minimum number of people.


Specifically, at a landslide site immediately after an event, one technician carrying LRTK can quickly survey the collapse area. Even if pre-established control points have been washed away, GNSS absolute positioning is not affected. The surveyor can collect terrain data quickly while walking without lingering in hazardous areas. Collected data can be shared to the cloud immediately, allowing a remote headquarters to grasp the situation in real time and use the information for initial response and recovery planning.


LRTK devices can also be mounted on helmets, enabling hands-free surveying. In rescue and recovery operations, personnel often need both hands free to ensure safety while moving. A helmet-mounted LRTK continuously records high-precision location information, so workers do not even need to aim a surveying device. Simply walking the site while inspecting it collects the necessary data—an innovative capability for disaster scenes. LRTK has already begun to be used by local governments and research institutions for disaster investigations, and its usefulness in the field is being demonstrated. In the future, rapid situational assessment methods using solo surveying devices like LRTK may well be incorporated into disaster response manuals.


Proposals for Companies and Sites Considering Adoption

So far we have examined the features and benefits of LRTK for enabling solo surveying. Finally, here are suggestions and messages for companies and sites considering adopting LRTK to ensure smooth introduction and effective use.


• Small-scale introduction to experience benefits: Rather than rolling it out across all sites at once, start by trialing a single LRTK unit on a small site or project. Even short-term use should make labor reduction and efficiency gains evident. Collect feedback from field staff on their reactions and improvement points, and gradually expand the scope of deployment.

• Staff briefing and training: Although LRTK is easy to operate, prior briefing and short practical training are effective for maximizing on-site utilization. Young workers familiar with smartphones will adapt quickly, but showing demonstrations to veteran workers who are less comfortable with digital tools helps them understand the benefits. Experiencing that “you can measure just by pressing a button” firsthand will impress users across generations.

• Integrate into operational workflows: Because LRTK data can be shared via cloud, incorporate it into existing construction management workflows. For example, save survey data directly to the company’s project shared folder and cross-check or compare it with CAD drawings or BIM models. This supports digital site management in line with the Ministry of Land, Infrastructure, Transport and Tourism’s i-Construction guidelines, and speeds up preparation of reports to clients.

• Use as a tool for safety management and quality improvement: LRTK should be adopted not only for labor savings but also for reducing worker burden, preventing heatstroke, and strengthening safety management. It also offers significant benefits for improving inspection accuracy and digitizing construction records for archiving. When adopting LRTK, share these multifaceted benefits within the company and coordinate with relevant departments for successful promotion.


In an era of labor shortages and work-style reform, LRTK, which enables solo surveying, has the potential to be a game changer in the construction and surveying industries. The era when surveying required crews of people is giving way to an era where anyone can perform surveys with a smartphone in hand. Because LRTK delivers visible benefits early in adoption, bringing it onto sites promptly can give your company a productivity edge over competitors. Please experience the ease and effects of LRTK-enabled solo surveying on your sites. Embrace the latest technology and take a step to elevate your surveying operations to the next stage.


Next Steps:
Explore LRTK Products & Workflows

LRTK helps professionals capture absolute coordinates, create georeferenced point clouds, and streamline surveying and construction workflows. Explore the products below, or contact us for a demo, pricing, or implementation support.

LRTK supercharges field accuracy and efficiency

​

The LRTK series delivers high-precision GNSS positioning for construction, civil engineering, and surveying, enabling significant reductions in work time and major gains in productivity. It makes it easy to handle everything from design surveys and point-cloud scanning to AR, 3D construction, as-built management, and infrastructure inspection.